Records from 2016 to 2017. Most recent: inspection, 8 November 2017.
Lifesaving › Inflatable Liferafts › Servicing
Issued 26 September 2017
Resolved
Granted request to extend the annual servicing of the 04 liferafts until 29 Oct 2017.
Action required: 705 - Other - as specified
Due 29 October 2017
Resolved 16 February 2018
Resolution: Cleared
Engineering › Diesel Engine (propulsion-reduction gear) › Nozzle, Injection (fuel injection)
Issued 21 June 2017
Resolved
Vessels Port Inboard main propulsion engine would not maintain steady RPM's and was surging between 615-750 RPM's.
Condition: Improper/Lack of Maintenance
Due 29 June 2017
Resolved 29 June 2017
Resolution: Ships crew and vessel reps made adjustments to the fuel system and restored consistant engine RPM's.
Construction/Loadline › Penetrations › Weld
Issued 15 June 2017
Resolved
Crack in hull around threw hull penitration for engine exhaust. Conduct repairs and NDT additional hull penitrations for deterioation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 30 June 2017
Resolution: Received pictures and reports for damage repairs. No additional damged discovered during NTD tests.
Lifesaving › Inflatable Liferafts › Weak Link
Issued 15 June 2017
Resolved
Liferaft weak link hooked up incorrectly.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 30 June 2017
Resolution: MI's provided on the spot training with ships crew and correctly attached the liferaft in question to the painter/weak link.
Engineering › Steering Gear System › Hand Pump
Issued 15 June 2017
Resolved
Directions posted for emergency steering are confusing and incorrect for installed equipment.
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 30 June 2017
Resolution: Ships crew replaced plaquarding with clear instructions.
Navigation › Collision/Grounding Avoidance › Radar
Issued 15 June 2017
Resolved
Second X Band radar inoperable.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 26 June 2017
Resolution: Corrected 26JUN17.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 15 June 2017
Resolved
Primary engineroom is equiped with both heat and smoke detectors. When tested in the presence of the attending MI the smoke detector failed to produce an alarm.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 30 June 2017
Resolution: Ships support personnel replaced the defective smoke detector and tested sat. Prior toe MI's departing vessel.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 15 June 2017
Resolved
Vessel reps sent out the ships Oil Content meter for Calibration. The unit was lost by KLM airlines. A replacement unit was ordered.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 30 June 2017
Resolution: Received notificaiton that the OCM was received, installed and tested.
Engineering › Steering Gear System › Pump
Issued 29 April 2016
Resolved
Stbd steering pump tube locking when maxed out.
Action required: 705 - Other - as specified
Due 29 May 2016
Resolved 10 May 2016
Resolution: Vessel provided captain attestation and a tech report stating the stb steering pump was full operational.
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 29 April 2016
Resolved
Vessel needs to ensure all alarms and shutdowns are in accordance within parameters specified by the manufacture.
Action required: 705 - Other - as specified
Due 29 May 2016
Resolved 10 May 2016
Resolution: Vessel provided captain attestation and a tech report stating that all alarms and shutdowns are operational and within parameters.