CHEMTRANS NOVA

CHEMTRANS NOVA is a 2006 tank ship. The Coast Guard has recorded 31 inspections since 2016, most recently in May 2026, along with 29 deficiencies and 6 operational controls.

Records from 2016 to 2026. Most recent: inspection, 27 May 2026.

Built
2006
Last inspected
27 May 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 27 May 2026
…with no type recorded6
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9316232
873636
Flag
ANTIGUA AND BARBUDA
Maury page id
psix-873636

Documentation record

Tonnage as PSIX records it42167 - Convention (Subpart B), Gross Ton
22451 - Convention (Subpart B), Net Ton
73870 - Dead Weight, Metric Ton
89381 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

31 inspections, each with its date, unit and type; 29 deficiencies with the resolution recorded against each; 6 operational controls with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 31

27 May 2026 COC-TVE Renew · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8381506
20 May 2026 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8377318
11 January 2026 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8294489
7 May 2025 COC-TVE Annual · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8120843
3 May 2024 Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7906119
2 May 2024 COC-TVE Renew · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7902184
9 April 2024 PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7892258
24 March 2024 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7884052
11 March 2024 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7877386
20 February 2024 Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7867390
14 February 2024 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7863277
9 February 2024 COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7863244
13 December 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7838555
5 December 2023 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7833846
30 May 2023 COC-TVE Annual · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7697535
13 July 2022 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7505940
11 May 2022 PSC B · COC-TVE Renew
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7448730
27 April 2021 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7183711
16 April 2021 Ballast Water Examination · COC-TVE Annual · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7173635
10 February 2021 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7138644
25 March 2020 COC-TVE Renew · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6931537
25 March 2019 Ballast Water Examination · ISPS III Exam · COC-TVE Annual
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6647185
10 January 2019 Administrative Inspection · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6608307
7 May 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6413134
12 April 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6390240
21 March 2018 COC-TVE Renew · ISPS II Exam · Deficiency Check · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6372985
20 February 2018 COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6348435
6 April 2017 Ballast Water Examination · COC-TVE Annual · ISPS II Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6115613
24 February 2017 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6094243
13 March 2016 ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5829996
9 March 2016 Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 5830323

Deficiency record · 29

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 11 January 2026 Resolved
(a) The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board... vessel reported inoperable fixed gas detection for cargo pump room. Make repairs prior to commencing cargo operations. 74SOLAS(04)I-11(a) 17AC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 January 2026
Resolution: Cleared w/ satisfactory class survey report.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 April 2024 Resolved
After any survey of the ship under regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration. PSCO observed unapproved electrical installation for an air conditioning unit on the bridge. 74SOLAS(20)I/II(b)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2024
Resolution: Crew removed the air conditioning unit and associated cable runs.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 9 April 2024 Resolved
Unless expressly provided otherwise, launching and embarking appliances complying with the requirements of Section 6.1 of the Code shall be provided. Where davit arms are recovered by power, safety devices shall be fitted which will automatically cut off the power before the davit arms reach the stops in order to prevent over stressing the fall or davits. PSCO observed starboard lifeboat davit missing limit switch. 74SOLAS(20)III/16.1 LSA Code 6.1.2.7
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2024
Resolution: Crew replaced limit switch. Tested satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 9 April 2024 Resolved
Cargo ships shall carry: one or more totally enclosed lifeboats complying with the requirements of Section 4.6 of the Code. Every totally enclosed lifeboat shall be provided with a rigid watertight enclosure which completely encloses the lifeboat. The enclosure shall be so arranged that: access to the lifeboat is provided by hatches which can be closed to make the lifeboat watertight. PSCO observed port side lifeboat access hatch not watertight and was allowing water ingress. 74SOLAS(20)III/31.1.1 LSA Code 4.6.2.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2024
Resolution: Crew replaced gasket. Tested satisfactory.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 9 April 2024 Resolved
A Tank Vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have: A mechanical means of closing each drain and scupper in the container or enclosed deck area required by this section. PSCO observed oily water actively leaking on deck beneath port side manifold from containment drain. 33 CFR 155.310(a)(3)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2024
Resolution: Crew replaced leaking valve for port side small discharge containment.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 9 April 2024 Resolved
Maintenance, testing and inspections shall be carried out based on the guidelines developed by the organization. PSCO observed crew testing vessel's manually-operated call points not in accordance with vessel's SMS or manufacture's instructions. 74SOLAS(04)II-2/14.2.2.1
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 12 April 2024
Resolution: Crew has 2 test keys on board. Master and C/E conducted training on use of proper testing tools.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 9 April 2024 Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code. The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the Company. The technical and/or operational nature of deficiencies 02-04 and 06 - 14 provide objective evidence of a serious failure of the implementation of the ISM Code. An external audit report satisfactory to the OCMI must be submitted prior to clearance of this deficiency. 74 SOLAS (20)IX/3.1 ISM CODE 10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 12 April 2024
Resolution: External audit received.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 9 April 2024 Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed the emergency fire pump inoperable. 74 SOLAS (20)II-2/14.2.1.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 12 April 2024
Resolution: Crew renewed priming piping. Tested satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 9 April 2024 Resolved
Means of control shall be provided for opening and closure of skylights, closure of openings in funnels which normally allow exhaust ventilation and closure of ventilator dampers. PSCO observed engine room intake duct fire damper unable to be closed remotely from fire control station. Crew was unable to manually close all 4 intakes via mechanical means located outside the stack. 74 SOLAS(20)II-2/5.2.2.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 12 April 2024
Resolution: Crew fixed linkage for remote control of fire damper. Crew re-spooled cable for manual closure devices. Tested satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 9 April 2024 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and readily available for immediate use. PSCO observed starboard life boat engine inoperable. 74 SOLAS(20)III/20.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 12 April 2024
Resolution: Crew replaced battery selector switch. Tested satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 9 April 2024 Resolved
The following requirements shall govern applications of the tables: Tables 9.7 and 9.8 shall apply respectfully to the bulkhead and decks separating adjacent spaces. PSCO observed a 2 inch by 2 inch gap on the escape trunk bulkhead (category 4) in the rear of the engine room (category 6) which requires a minimum boundary of "A-60". 74SOLAS(04)II-2/9.2.4.2.2.1
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 April 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 April 2024 Resolved
Cylinders must always be secured and when not in use, they must be stowed in a rack in an upright position, with the valve protection cap in place. PSCO observed seven (7) unsecured oxygen bottles in oxygen stores and four (4) unsecured acetylene bottles in acetylene store. 46 CFR 147.60(b)(1)
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 12 April 2024
Resolution: Crew landed unsecured bottles ashore.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 April 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed holes in the bottom rungs of the A Deck, B Deck and C Deck ladders on the exposed deck aft of the superstructure. 74SOLAS(20)I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 12 April 2024
Resolution: Crew renewed ladder rungs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 April 2024 Resolved
Electrical installations shall be such that the safety of passengers, crew, and ship from electrical hazards will be ensured. PSCO observed multiple missing or broken bonding cables and missing or broken bolts on electrical cable runs located within the hazardous area per the vessel's approved hazardous location plan. Additionally, PSCO observed cable run through 'A' Class bulkhead on the 'C' deck cable and pipe trunk not properly insulated. 74SOLAS(04)II-1/40.1.3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2024
Resolution: Crew replaced broken or missing bonding straps and bolts. Crew insulated cable run in C deck cable/pipe trunk with insulating putty.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 April 2024 Resolved
Doors required to be self-closing shall not be fitted with hold-back hooks. PSCO observed all doors leading to the galley to be affixed with hold-back devices, and not self-closing as required by fire control plan. 74SOLAS(04)II-2/9.4.2.2
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2024
Resolution: Crew removed installed holdback hooks.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 April 2024 Resolved
Stairway and lift trunks which penetrate more than a single deck shall be surrounded by at least "A-0" class divisions and be protected by self-closing doors at all levels. PSCO observed "A-0" door on C-deck to main stairwell unable to self-close as intended and pilot door on nav bridge deck to main stairwell missing self-closing device. Additionally, PSCO observed "A-0" door to stationary store on nav bridge deck unable to properly seal. 74SOLAS(04)II-2/9.2.3.4.1
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2024
Resolution: Crew fixed self closing devices on C deck fire door and stationary store fire door. Crew affixed new self closing device on pilot door.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 11 March 2024 Resolved
Each vessel of 10,000 gross tons or more must have a second marine radar system that operates independently of the first. Vessel was found to have an inoperable s-band radar.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 28 March 2024
Resolution: Recieved satisfactory tech report attesting to radar replacement.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 30 May 2023 Resolved
The machinery boilers and other pressure vessel associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons onboard. PSCO observed gas meter detected high levels of carbon monoxide within second level of inert gas room during operation of inert gas system. 74SOLAS (am) 11-1/26.1. AC ( Prior to cargo)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 June 2023
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Ship's crew replaced exhaust seal on #1 IG blower.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 May 2023 Resolved
The machinery boilers and other pressure vessel associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons onboard. PSCO observed excessive jacket water leak on #5 cylinder on main diesel engine. 74SOLAS (AM) 11-1/26.1.60ac
Action required: 60 - Rectify deficiencies prior to movement
Due 30 May 2023
Resolved 5 June 2023
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Ship's crew replaced O-rings on the jacket water system for #5 cylinder.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 May 2023 Resolved
All steering gear components and the rudder stock shall be of sound and reliable construction to the satisfaction of the administration. PSCO observed #1 steering pump grinding with leak at the lube oil pressure switch. 74 SOLAS (am) 11-2/29.2.1. 60ac
Action required: 60 - Rectify deficiencies prior to movement
Due 30 May 2023
Resolved 5 June 2023
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Ship's crew replaced steering gear pump #1 lube oil pressure switch gasket.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 May 2023 Resolved
Stairways which penetrate more than a single deck shall be surrounded by at least "A-0" Class divisions and be protected by self closing doors at all levels. PSCO observed all stairwell doors not self closing. 74SOLAS (am) 11-2/9.2.3.4.1. 17ac
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 30 May 2023
Resolved 5 June 2023
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Ship's crew replaced the springs in the closing devices on all stairwell fire doors.
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 12 May 2022 Resolved
The machinery and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be installed and protected as to reduce to a miminum any dangers to persons on board. PSCO observed hydraulic leak on mooring winch and associated piping approximately 1+ gallon. 74 SOLAS (04) II-1 / 26.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2022
Resolution: Received class report attesting to repairs made to hydraulic winch and associated piping.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 12 May 2022 Resolved
The machinery, boilers and other pressure vessels shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed multiple steam leaks on cargo pumps 1, 2, and 3 in the engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2022
Resolved 29 May 2022
Resolution: Cargo pump glands renewed for all three valves. See attachment.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 21 March 2018 Resolved
1800-Tankers-The IG system shall be capable of delivering inert gas with an oxygen content of not more than 5%. After multiple attempts, system was unable to produce 5% oxygen. Additionally, a carbon monoxide leak was identified in the IG space by a USCG and crew gas detection meters. 74SOLAS(14)CH.II-2/4.5.5.1.1. FSS Code(07)CH.15.2.2.1.3
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 May 2018
Resolution: RECEIVED CLASS SURVEY REPORT STATING O2 ANALYSER HAS BEEN REPLACED AND ALL IS IN GOOD WORKING ORDER.
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 21 March 2018 Resolved
0725 - Fixed fire extinguishing installation - Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Sprinkler heads in the IG space were covered by modified pieces of foam preventing the sprinkler from operating as designed. Additionally, an automatic type sprinkler head was found in line with the manually operated system in the upper deck of the IG space. 74SOLAS(14)CH.II-2/14.2.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2018
Resolution: Received class report stating layout of the system, and removing of the foam hindrances. See class report attached to this activity.
Lifesaving › Lifeboat › Safety Belt
Issued 21 March 2018 Resolved
0610 - Lifeboats - Each set of safety belts for a seat shall be of a colour which contrasts with the belts for seats immediately adjacent. PSCO observed port and starboard lifeboats with the same color belts for each seat. 74SOLAS(14) CH.III/34 LSA Code 4.6.3.1
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 12 April 2018
Resolution: Received class LR full term Safety Equipment Certificate, clearing outstanding condition of class.
Navigation › Piloting/Steering › Swing Meter
Issued 21 March 2018 Resolved
1581 - Rudder angle indicator - The navigational equipment and systems shall be installed, tested, and maintained as to minimize malfunction. PSCO observed port bridge wing rudder angle indicator with 6 degree error. 74SOLAS(14)CH.V/19.4
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 12 April 2018
Resolution: Received class LR full term Safety Equipment Certificate, clearing outstanding condition of class.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 21 March 2018 Resolved
0900 - Saftery in General - Due regard shall be paid to the equipment and arrangements for pilot transfer adopted by the organization, IMO Res A.889(21) and MSC/Circ.568/Rev.1. The securing strong points and securing ropes should be at least as strong as the side ropes. Side ropes should be continuous with no joints and breaking strength of 24 kilo newtons per side rope. Connections from main deck to the pilot ladder connections are secured with a spliced synthetic line, not meeting the recommendations set out in the resolution above. 74SOLAS(14) CH.V/23.1.2
Action required: 705 - Other - as specified
Due 21 April 2018
Resolved 12 April 2018
Resolution: Received class LR full term Safety Equipment Certificate, clearing outstanding condition of class.
Deck/Cargo › Inert Gas System › Deck Distribution System
Issued 13 March 2016 Resolved
74 SOLAS 2014 CONS CH I REG 11(A)- After any survey of the ship under regulations 7,8,9, or10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the administration. IG system has a leak of inert gas within an enclosed space causing a safety hazard to the crew. 10c
Action required: 705 - Other - as specified
Due 13 March 2016
Resolved 13 March 2016
Resolution: Crew located and repair leaking gasket eliminating the safety hazard.

Ownership record