Documentation record
Registered dimensions (L × B × D)345.9 ft × 60.0 ft × 29.0 ft
Registered tonnagegross 5,568 / net 5,568
ITC dimensions (L × B × D)345.9 ft × 60.0 ft × 29.0 ft
ITC tonnagegross 4,939 / net 2,864
BuilderBOLLINGER MARINE FABRICATORS LLC · AMELIA, LA, UNITED STATES · built 2008
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHOUSTON, TX
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 9 January 2026 · expires 28 February 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it4939 - Convention (Subpart B), Gross Ton
5568 - Regulatory (Subpart C or D), Gross Ton
2864 - Convention (Subpart B), Net Ton
5568 - Regulatory (Subpart C or D), Net Ton
10044 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 34
10 August 2026
Bulk Liquid Transfer Monitor
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8461491
6 January 2026
Deficiency Check · COI Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8291039
1 December 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8275570
6 November 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8029642
2 February 2024
Periodic Inspection · Drydock Exam · Administrative Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7859844
30 May 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7700993
16 February 2023
MARPOL Annex II Examination · Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7626280
6 January 2023
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7617677
13 November 2022
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7773407
29 June 2022
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7491736
11 January 2022
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7376677
11 January 2021
Welding Related Inspections Qualification Testing · Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7122611
15 June 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6977503
27 April 2020
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 6944524
27 January 2020
Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6896654
10 December 2018
Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6594703
3 October 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6557257
16 April 2018
MARPOL Annex II Examination · MTSA Verification · MARPOL Annex I Examination · MARPOL Annex VI Survey · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6394194
10 January 2017
Annual Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination · MARPOL Annex II Examination · MTSA/ISPS Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6068847
24 June 2016
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5917651
20 January 2016
MARPOL Annex II Examination · MTSA/ISPS Verification · MARPOL Annex VI Survey · MARPOL Annex IV Survey · COI Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5800414
11 January 2016
Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5799765
20 March 2015
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5085572
21 April 2014
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4838815
23 October 2013
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4739751
9 May 2012
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4306544
1 May 2012
Annual Inspection · MTSA/ISPS Verification · MARPOL Annex II Examination · MARPOL Annex VI Survey · MARPOL Annex IV Survey · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4300499
14 May 2010
DAPI Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3747074
28 April 2010
Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3800144
25 August 2009
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3576498
28 April 2009
MARPOL Annex I Examination · MARPOL Annex V Examination · Deficiency Check · MTSA Verification · Administrative Inspection · MARPOL Annex VI Survey · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3550780
12 March 2009
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3432473
3 September 2008
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3317095
4 February 2008
Initial Certification · MTSA Verification · Construction Oversight · Deadweight Survey · Cargo Tank Internal · Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3141462
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 6 January 2026
Resolved
Approved portable and semi-portable extinguishers must be installed in accordance with table 34.50-10(a). MI observed 30BC extinguishers instead of the required 40B.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 February 2026
Resolution: Verified all fire extinguishers were replaced to meet COI requirements. COI required seven 40B fire extinguishers, the fire plan included 8. Genesis Marine Offshore plans to update the fire plan in accordance with the COI
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 6 January 2026
Resolved
Each vessel must carry not less than 12 rocket parachute flares approved under approval series 160.136. MI observed 0 rocket parachute flares on board.
46CFR199.60
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 February 2026
Resolution: -Verified 12 rocket parachute flares stored in the cargo control room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 January 2026
Resolved
All safety and relief valves for use on pressure vessels shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the maximum allowable working pressure. MI observed pressure relief valves on air compressor set above maximum allowable working pressure.
46CFR54.15-10
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 February 2026
Resolution: Verified replacement pressure relief valves on the air compressor.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 November 2024
Resolved
The pressure vacuum relief valve shall be of a type and size approved by the Commandant for the purpose intended. For specifications and procedures re approval, see subpart 162.017 of subchapter Q (Specifications) of this chapter. Double flame screens of 20 × 20 corrosion-resistant wire mesh with a 1/2-inch corrosion-resistant separator, or a single screen of 30 × 30 corrosion-resistant wire mesh, shall be fitted on all openings to atmosphere. The net free area through the flame screens shall not be less than 11/2 times the cross-sectional area of the vent inlet from the cargo tanks. Flame screens on pressure relief valves on all cargo tanks and slop tank were damaged. Replace in kind to satisfaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 6 November 2024
Resolution: Vessel operator replaced flame screens.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 November 2024
Resolved
Each switchboard must meet the location and installation requirements in section 5.3 of IEEE 45.7-2012 or IEC 60092-302:1997 (both incorporated by reference; see § 110.10-1 of this subchapter), as applicable. Switchboard in aft rake was missing two blanks. Repair to satisfaction of attending Marine Inspector.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2024
Resolved 11 November 2024
Resolution: Vessel operator installed required blanks.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 February 2023
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150. The grab line on two life buoys were deteriorated. Provide life buoys that meet specification.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2023
Resolved 17 February 2023
Resolution: New life buoys provided
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 February 2023
Resolved
Each lifebuoy stowage location must be marked with either the words "LIFEBUOY" or "LIFE BUOY" or with the appropriate symbol from IMO Resolution A.760(18). All lifebuoy stowage locations were not marked. Mark each lifebuoy stowage location.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2023
Resolved 17 February 2023
Resolution: Markings added
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 February 2023
Resolved
All electrical engineering must meet the requirements of Subchapter J. The port and starboard fender winches were found with dead end electrical cables. All dead end cables must be removed or properly capped and secured.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2023
Resolved 21 February 2023
Resolution: Photographic evidence of properly capped and enclosed dead end wires.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 16 February 2023
Resolved
On all tank vessels, the enclosed parts of the vessel shall be provided with efficient means of ventilation. The bow thruster mechanical ventilation was found inoperable. Repair mechanical ventilation. Hazards should be mitigated by naturally ventilating and testing the atmosphere prior to entry by personnel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2023
Resolved 17 February 2023
Resolution: Ventilation operational.
01 - Certificates & Documentation › 013 - Documents › P&A manual
Issued 16 February 2023
Resolved
Every ship certified to carry NLS cargoes shall have on board a Procedures and Arrangements (P&A) Manual approved by the Administration. The vessel did not have a P&A on board. A P&A Every ship certified to carry NLS cargoes shall have on board a Procedures and Arrangements (P&A) Manual approved by the Administration. The vessel did not have a P&A on board. A P&A Manual that was approved for the previous vessel owner/operator was later provided. A revised P&A Manual reflecting current owner/operator shall be submitted to Coast Guard Marine Safety Center (MSC) for review and approval. If any other changes are necessary for the P&A Manual, those changes shall also be included in the submittal to MSC.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2023
Resolved 27 February 2023
Resolution: A copy of the P&A Manual was sent to the barge and printed onboard. MSC confirmed a change in vessel name and company does not require a resubmittal of the P&A Manual
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 October 2018
Resolved
Vessel lost anchor during operation in the Mantua Creek area. Provide documentation to prove the vessel is able to meet the required emergency control systems required under 33 CFR 155.230(b).
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 9 October 2018
Resolved 9 October 2018
Resolution: Recieved class report(attached).
Electrical › Electric Generation Source (service) › Generator
Issued 21 April 2014
Resolved
Vsls #2 genset was torn apart and not operable during inspection. Workers were currently onboard working on genset.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2014
Resolution: Prior to MI departure, vsl rep stated that the #2 genset was back together and back on line. Tested #2 genset on line with load, in parallel, and reverse power relay. Tested satisfactory.
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 21 April 2014
Resolved
#3 genset could not be adjusted to test the reverse power relay.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 April 2014
Resolution: Vsl found that they had installed the wrong type of frequency adjust knob. ABS attended vsl and tested the reverse power relay. Tested satisfactory.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 1 May 2012
Resolved
Repair or replace sewage treatment tank in stbd aft rake.
Due 18 May 2012
Resolved 9 May 2012
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 28 April 2010
Resolved
Provide list of covered employees enrolled in random drug testing program
Due 28 May 2010
Resolved 28 May 2010
Resolution: Provided list of covered employees enrolled in random drug testing program
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 28 April 2010
Resolved
Properly mark vapor control line IAW 33 CFR Sub O
Condition: Improper Installation
Due 28 May 2010
Resolved 28 May 2010
Resolution: Properly marked vapor control line IAW 33 Sub O
Engineering › Generator (propulsion/auxiliary-electric) › Circuit Breaker (overload/over current protection)
Issued 28 April 2010
Resolved
Prove proper operation of generator prime mover over speed and low lube oil shut down.
Due 28 May 2010
Resolved 28 May 2010
Resolution: Proved proper operation of generator prime mover over speed and low lube oil shut down.
Engineering › Generator (propulsion-electric) › Breaker Circuitry
Issued 28 April 2010
Resolved
Prove proper operation of reverse power relay of ship service generator.
Due 28 May 2010
Resolved 28 May 2010
Resolution: Proved proper operation of reverse power relay of ship service generator.
Construction/Loadline › Hull › Hull Plating
Issued 28 April 2010
Resolved
Provide repair proposal for sharp inset on STBD stern.
Due 28 May 2010
Resolved 28 May 2010
Resolution: Provided repair proposal for sharp inset on STBD stern.
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 28 April 2009
Resolved
Vessel was issue an IAPP certificate from MSU Morgan City but is un familiar with the regulations and procedures associated with it. Crew is to become familiar with MARPOL Annex VI regs, equipment and operations as per CG-543 policy letter 09-01.
Action required: 705 - Other - as specified
Due 28 April 2009
Resolved 7 July 2009
Resolution: Attended vessel and observed compliance to MARPOL Annex VI regulations.