← All vessels
PELAGIC TAIMEN
PELAGIC TAIMEN is a 2006 tank ship. The Coast Guard has recorded 24 inspections since 2007, most recently in August 2023, along with 11 deficiencies and 4 operational controls.
Records from 2007 to 2023. Most recent: inspection, 11 August 2023.
- Built
- 2006
- Last inspected
- 11 August 2023
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 11 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9350850 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
9HNE8
874738
Flag
LIBERIA
—
Maury page id
psix-874738
Inspections, by type
…with no type recorded4
Years with a record
11 calendar years (2007–2023)
The 24 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it30053 - Convention (Subpart B), Gross Ton
62032 - Displacement, Metric Ton
50885 - Dead Weight, Metric Ton
13712 - Convention (Subpart B), Net Ton
62032 - Displacement, Metric Ton
50885 - Dead Weight, Metric Ton
13712 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 24
11 August 2023
PSC B · COC-CHEM & TVE Annual
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7765580
16 March 2023
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7652127
10 December 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7607196
20 September 2022
PSC C
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7562703
10 August 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7529725
10 August 2022
PSC B · COC-CHEM Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7530257
29 April 2022
Bulk Liquid Transfer Monitor
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7443809
26 July 2021
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7269379
23 July 2021
PSC B · MARPOL Annex VI Survey · COC-CHEM & TVE Annual
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7265284
22 July 2020
Deficiency Check · COC-CHEM Renew · PSC B
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7012034
24 December 2018
COC-CHEM & TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6602298
2 February 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6348706
24 November 2017
ISPS II Exam · COC-CHEM & TVE Renew · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6310599
12 June 2017
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6170876
12 June 2017
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6174586
31 March 2017
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6115021
9 January 2017
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6067864
1 November 2016
Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6033488
23 October 2015
Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5749427
23 October 2015
COE-Administrative
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5749668
11 June 2014
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4886292
4 January 2009
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3388366
11 March 2007
ISPS II Exam · Ballast Water Examination · COC-CHEM Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2885625
6 March 2007
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2882570
Deficiency record · 11
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 August 2022
Resolved
FOR THIS PURPOSE, THE FOLLOWING FUNTIONAL REQUIREMENTS SHALL BE MET, MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS.PSCO OBSERVED FUEL OIL LEAK FROM FILTER.
74SOLAS(04)I/11(a)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 August 2022
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ESNSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ONBOARD.PSCO OBSERVED WHILE IN THE ENGINE ROOM A JACKET WATER LEAK ON THE NR1 GENERATOR AT A RATE OF APPROXIMATELY 3 DROPS PER SECOND. WHILE ON DECK, FOUND CRACKED PIPING IN THE FRESH WATER LINE.
74SOLAS(04) II-2/4.1.1
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 July 2020
Resolved
The condition of the ship and its equipment shall be maintained to confrom with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The PSCO observed a leak on the gray water pipe that leads to the MSD tank. The leak was approixmately a gallon per minute.
74 SOLAS (14) I/11(a)
17ac
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 July 2020
Resolved
Electrical installations shall be such as to minimize the risk of fire and explosion from flamable products. PSCO identified unapproved fitting on explosion proof lighting fixture on deck. Lighting fixture located on stbd forward collision bulkhead.
74 SOLAS(14) VII/10.1
17ac
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 July 2020
Resolved
Electrical installations shall be such as to minimize the risk of fire and explosion from flammable products. PSCO identified explosion proof lighting with debris inside of casing. Lighting fixture located centerline forward of collision bulkhead.
Lifesaving › Launching Appliances › Release Mechanism
Issued 24 November 2017
Resolved
0613 - 74SOLAS(14)III/34, LSA 6.1.1.8 - A lifeboat launching appliance shall be capable of recovering the lifeboat wuth its crew. During abandon ship muster, lifeboat was lowered to embarkation deck. Crew was unable to return lifeboat to stowed position. 17ac
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 9 January 2017
Resolved
Plans shall be kept up to date. The issued key for the fire control plan does not match current symbols on the fire control paln.
Deck/Cargo › Inert Gas System › IGS Blower
Issued 3 November 2016
Resolved
At least two blowers shall be fitted, for systems with IGG the Administration may permit only 1 blower if the capacity os sufficient. IGG System has two blowers installed, but blower number 1 could not be operated.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 3 November 2016
Resolved
Doors required to be self closing shall not be fitted with hold backs. The fire doors leading from the officers mess to the galley and from the crews mess to the galley have installed holdbacks.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 3 November 2016
Resolved
Suitable means shall be provided for the zero and span calibration of both fixed and portable cas concentrationmeasurement Instruments. Vessels engineers were unable to demonstrate proper calibration of the inert gas generator Oxygen sensor. Following final attempt to calibrate, when the IGG was in operation -3% O2 was shown.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 26 November 2008
Resolved
Per reg 33 CFR 155.1052, the vessel-specific appendix in VRP plan #02603 must be amended to include the correct cross-reference for Group V oil and non-petroleum oil procedures.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.