← All vessels
MINERVA SYMPHONY
MINERVA SYMPHONY is a 2006 tank ship. The Coast Guard has recorded 12 inspections since 2007, most recently in January 2024, along with 3 deficiencies and 1 operational control.
Records from 2007 to 2024. Most recent: inspection, 31 January 2024.
- Built
- 2006
- Last inspected
- 31 January 2024
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 3 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9304605 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
SXIS
875043
Flag
GREECE
—
Maury page id
psix-875043
Inspections, by type
…with no type recorded2
Years with a record
6 calendar years (2007–2024)
The 12 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it83742 - Convention (Subpart B), Gross Ton
50496 - Convention (Subpart B), Net Ton
159450 - Dead Weight, Metric Ton
183479 - Displacement, Metric Ton
50496 - Convention (Subpart B), Net Ton
159450 - Dead Weight, Metric Ton
183479 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 12
31 January 2024
COE-Administrative
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7858610
2 January 2024
COC-TVE Renew · Ballast Water Examination · PSC B
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7843060
3 March 2018
ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6360249
17 August 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5975513
5 August 2016
COE-Administrative
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5949389
15 May 2016
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5877587
17 March 2016
COC-TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5835098
3 July 2012
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4358169
8 April 2009
ISPS II Exam · Ballast Water Examination · COC-TVE Renew · PII Safety Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3443876
24 September 2007
ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3064207
18 March 2007
COC-TVE Renew · Ballast Water Examination · MARPOL Annex V Examination · ISPS II Exam · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2889925
17 March 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2889893
Deficiency record · 3
Deck/Cargo › Inert Gas System › IGS Scrubber
Issued 3 March 2018
Resolved
PSCO observed a water leak in the flue gas pipe leading into the scrubber. Vessel is restricted from discharging cargo until system is repaired and inspected by certificate issuing authority.
Engineering › Fuel Oil Service System › Piping
Issued 17 March 2016
Resolved
1470-Insulation wetted through (oil)-Oil fuel pipes & their valves & fittings shall be of steel or other approved material. PSCO observed rubber/soft patch on common fuel oil return line to F/O overflow tank for all SSDG's, with insulation removed on the fuel oil return line where the soft patch was placed. SOLAS 74 (a) II-2/4.2.2.5.1. 16a
Fire Fighting › Fire Main › Condition
Issued 3 July 2012
Resolved
0740 - Pumps - The condition of the ship and its equipment shall be maintained to conform with the previsions of the present regulations. There is a small hole on the discharge side of the main fire pump. - SOLAS 2009 Cons. Ed. I/11(a)
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.