MAURY USCG vessel records Sign in
← All vessels

APL BALBOA

APL BALBOA is a 1998 freight ship. The Coast Guard has recorded 23 inspections since 2007, most recently in February 2012, along with 59 deficiencies, 2 operational controls and 7 casualty investigations between 2008 and 2011.

Records from 2007 to 2012. Most recent: inspection, 26 February 2012.

Built
1998
Last inspected
26 February 2012
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9157961 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDE2904
875966
Flag
UNITED STATES
367331160 (licence lapsed)
Maury page id
psix-875966

Inspections, by type

…with no type recorded11
Years with a record 6 calendar years (2007–2012)
The 23 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it3682 - Convention (Subpart B), Net Ton
10487 - Dead Weight, Ton
8203 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDE2904MMSI 367331160 · cancelled · compulsorily equipped · granted 12 January 2008, cancelled 9 January 2017
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 23

26 February 2012 DAPI Audit · Annual Inspection · MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 4229842
25 February 2011 MTSA/ISPS Verification · Annual Inspection · DAPI Audit
Physical examination · Activities Europe · Activity 3941184
1 February 2011 Type not recorded
No type recorded · Activities Europe · Activity 3937666
6 December 2010 Internal Structural Exam · Underwater Inspection in lieu of Drydock
Physical examination · Activities Europe · Activity 3882000
23 March 2010 Excursion Permit
Administrative · Activities Europe · Activity 3702613
12 March 2010 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 3694372
12 January 2010 MTSA/ISPS Verification · Annual Inspection
Physical examination · Activities Europe · Activity 3662442
7 May 2009 Examination of Repairs
Physical examination · Activities Europe · Activity 3469456
23 January 2009 MTSA/ISPS Verification · MARPOL Annex V Examination · MARPOL Annex I Examination · Ballast Water Examination · Annual Inspection
Physical examination · Activities Europe · Activity 3398697
27 December 2008 Type not recorded
No type recorded · Activities Europe · Activity 3387889
23 December 2008 Administrative Inspection
Administrative · Activities Europe · Activity 3383984
26 November 2008 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3622484
29 July 2008 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3535374
12 June 2008 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3561247
11 April 2008 Type not recorded
No type recorded · Activities Europe · Activity 3268445
28 January 2008 Reflagging & Initial Certification · MARPOL Annex V Examination · MARPOL Annex I Examination · MTSA/ISPS Verification
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 3124497
28 November 2007 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3104847
28 November 2007 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3106214
14 June 2007 ISPS III Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2961086
4 April 2007 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2901687
1 April 2007 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2899312
21 March 2007 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2890118
21 March 2007 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2891188

Deficiency record · 59

Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 26 February 2012 Resolved
Make permanent repairs and provide class report for thee #3 hold port vent to the satisfaction of the attending Class surveyor.
Due 26 March 2012
Resolved 19 March 2012
Resolution: Received email of repaired vent and confirmation by class surveyor.
Lifesaving › Launching Appliances › Davit
Issued 26 February 2012 Resolved
Provide annual servicing report for davit proving full operation of davit in all modes.
Due 26 March 2012
Resolved 28 March 2012
Resolution: Received email with davit servicing report stating that service to the hook IAW LSA code took place.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 25 February 2011 Resolved
Plans, drawings, and previous flag administration waiver pertaining to the bow height to be submitted to the USCG Marine Safety Center for review and examination or have class review and amend the ILLC as appropriate if in error.
Due 28 March 2011
Resolved 15 March 2011
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 25 February 2011 Resolved
Vessels SOLAS safety equipment certificate indicates that the ship was subjected to an alternative design and arrangements in pursuance of regulation II-2/17 of the convention. Provide the documentation supporting the alternative design and arrangements in pursuance of reg. II-2/17 to the USCG Marine Safety Center for review.
Due 28 March 2011
Resolved 15 March 2011
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 25 February 2011 Resolved
Provide the original IAPP certificate and supplement on board vessel.
Due 28 March 2011
Resolved 15 March 2011
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 25 February 2011 Resolved
Provide adequate emergency lighting for the lifeboat, rescue boat, davit launched liferaft, and their repective launching appliances.
Condition: Improper Installation
Due 28 March 2011
Resolved 15 March 2011
Construction/Loadline › Structures › Ventilators
Issued 25 February 2011 Resolved
The remote controlled louvers for the natural ventilation shut down to the engineroom, upper fiddly, found to be holed and wasted in three areas. Crop and renew or replace as original.
Condition: Improper/Lack of Maintenance
Due 28 March 2011
Resolved 15 March 2011
Fire Fighting › Structural - Horizontal Zones › General
Issued 25 February 2011 Resolved
Self closing device for the hospital fire door in the main vertical zone, as indicated on the fire control plan, found missing. Provide self closure device.
Due 28 March 2011
Resolved 15 March 2011
Construction/Loadline › Structures › Superstructure
Issued 25 February 2011 Resolved
Leading edge of bow, leading to the forcastle from the main deck in way of the liferaft on the port side, found to be holed and wasted. Affect permanent repairs.
Condition: Improper/Lack of Maintenance
Due 28 March 2011
Resolved 15 March 2011
Construction/Loadline › Structures › End Bulkhead
Issued 25 February 2011 Resolved
Bulwark lower longitudinal stiffeners on the starboard side, found to be holed and wasted. Affect permanent repairs.
Due 28 March 2011
Resolved 15 March 2011
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 25 February 2011 Resolved
Bunker station containment, port and starboard side, found to be holed and wasted. Affect permanent repairs.
Due 28 March 2011
Resolved 15 March 2011
Construction/Loadline › Structures › Ventilators
Issued 25 February 2011 Resolved
Vent duct in number 1 cargo hold aft, found to be holed in two locations. Crop and renew, as original.
Due 28 March 2011
Resolved 15 March 2011
Accommodation/Occupational Safety › Other Accommodation Spaces › Laundry
Issued 25 February 2011 Resolved
Provide adequate dryer vent arrangement for the laundry room on the main deck.
Due 28 March 2011
Resolved 15 March 2011
Engineering › Compressed Air System (control) › Compressor
Issued 25 February 2011 Resolved
Properly install electrical and piping for low pressure air compressor.
Due 28 March 2011
Resolved 15 March 2011
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 25 February 2011 Resolved
Renew or remove priming pump for the emergency fire pump.
Due 28 March 2011
Resolved 15 March 2011
Accommodation/Occupational Safety › Cooking Systems › Cooking Fuel
Issued 25 February 2011 Resolved
Provide cover for deep fat fryer.
Due 28 March 2011
Resolved 15 March 2011
Accommodation/Occupational Safety › Other Accommodation Spaces › Laundry
Issued 25 February 2011 Resolved
Properly secure laundry machines.
Due 28 March 2011
Resolved 15 March 2011
Documentation › Certificates/Documents › Safety Management Certificate (ISM)
Issued 25 February 2011 Resolved
Provide recors pertaining to the last masters SQEMS review and clairfying documentation for the intervals when this review is to be carried out are to submitted to the ISM RO and the USCG.
Due 28 March 2011
Resolved 15 March 2011
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 25 February 2011 Resolved
Repair or remove dishwasher in main galley.
Due 28 March 2011
Resolved 15 March 2011
Accommodation/Occupational Safety › Potable Water System › General
Issued 25 February 2011 Resolved
Provide hot water to two wash basins in galley.
Due 28 March 2011
Resolved 15 March 2011
Construction/Loadline › Structures › Door
Issued 10 December 2010 Resolved
Repair/replace port side watertight door which provides entrance into and exit from the vessel's hospital space. Currently the door is holed and wasted.
Due 10 January 2011
Resolved 7 January 2011
Resolution: recvd photos from vsl master.
Construction/Loadline › Structures › Ventilators
Issued 10 December 2010 Resolved
Repair suplly and exhaust vents on the poop deck. Currently at least two of the supply and exhaust vents are holed and wasted.
Due 10 January 2011
Resolved 7 January 2011
Resolution: recvd photos of repairs from vsl master
Lifesaving › Launching Appliances › Davit
Issued 10 February 2010 Resolved
Vessel's rescue boat/liferaft launching appliance (davit & winch) found in condition of general disrepair (wasted slewing pedestal, improper placement of pedestal gasket, dead-end wiring, inoperative limit switches, etc.). Evidence of annual servicing of launching appliance and rescue boat not readily available. Annual servicing and proper operation to be demonstrated prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2010
Resolution: Launching appliance serviced and temporary repairs made, new 835 issued for permanent repairs.
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 10 February 2010 Resolved
Vessel's fixed fire detection system for cargo holds showing system fault. Faults to be investigated and cleared as appropriate. System to be in proper working order prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2010
Resolution: System serviced and all faults cleared.
Fire Fighting › International Shore Connection › Gasket
Issued 10 February 2010 Resolved
Gaskets for international shore connections found wasted and torn. Proper gaskets to be provided on board prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2010
Resolution: New gaskets provided on board.
Lifesaving › Lifeboat Equipment › Food Ration
Issued 10 February 2010 Resolved
Vessel's lifeboat short of approximately 6 food rations (50,700 KJ). Rations to be provided on board prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2010
Resolution: New food provided on board.
Lifesaving › Launching Appliances › Davit
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Annual servicing of rescue boat/liferaft launching appliance (davit, winch, and release hook) to be carried out no later than 7 days, 17 February 2010 or Jebel Ali, UAE port whichever is soonest.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Lifesaving › Launching Appliances › Release Mechanism
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide on board operation and maintenance manual for rescue boat/liferaft release hook within 7 days, 17 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Bridge-wing rudder angle indicators report half of the actual rudder position (ex. 20 degrees, reported as 10 degrees). System to be calibrated and properly operating within 7 days. 17 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Lifesaving › Rescue Boat Equipment › Searchlight
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Searchlight for rescue boat found inoperative. Make proper repairs to restore operational readiness within 7 days. 17 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Navigation › Piloting/Steering › Maneuvering Information Fact Sheet
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide warning statement for Vessel maneuvering fact sheet, within 7 days. 17 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Lifesaving › Rescue Boat › Propulsion Engine
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Electrical charger for rescue boat found inoperative, assembly also wasted. Make permanent repairs and restore operational readiness within 14 days. 21 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified*Vessel's records of drills indicate that the free-fall lifeboat has conducted simulated launching by free-fall at annual intervals. 74SOLAS(2006 Amend.) III/19.3.3.4 requires launching by free-fall or simulation at 6 month intervals. Safety management system relating to maintenance and drills to be updated.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified*Vessel's safety management system and maintenance system to be upgraded to incorporate the requirements of 74SOLAS(2004 Cons.) III/20.11.1 and Regulation 36 for launching appliance and on-load release gear for the combination liferaft/rescue boat davit within 14 days. 21 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Lifesaving › Inflatable Liferafts › Float Free
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17MAR10 and shall remain open until verified*Vessel's 25 person liferaft (STBD side), float free arrangement, is obstructed overhead by the free-fall lifeboat and davit. Request Safety Equipment Certificate issuing authority (ABS) to undertake a survey to determine suitability of location for float free arrangement, within 14 days. 21 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Construction/Loadline › Structures › Superstructure
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Accommodation bulkhead, STBD side poop-deck, found holed and wasted in way of entrance way. Area to be cropped to good steel and properly repaired, within 14 days. 21 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Fire Fighting › Ventilation Systems › Fans
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Housing for CO2 room mushroom vent, STBD side poop-deck, found severely holed and wasted. Make permanent repairs within 14 days. 21 February 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Electrical › Lighting (service) › Lighting Fixture
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Mount for deck light, port side poop-deck, found severely wasted and broken. Make permanent repairs within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Fire Fighting › Ventilation Systems › Ducts
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Galley natural supply vent, forward of accommodation poop-deck, found holed and wasted. Make permanent repairs within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Communications › Radio Communications › EPIRB
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide USCG Approved hydrostatic release unit for EPIRB within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Aft mooring control station grating and supports found holed and wasted. Make permanent repairs within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Construction/Loadline › Structures › Door
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 25FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Gasket channel to battery room weather tight door found wasted. Make permanent repairs within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Lifesaving › Launching Appliances › Padeye
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 4MAR10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide two (02) cleats for davit launched liferaft arrangement as per posted manufacturer launching instructions, within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Fire Fighting › Fire Hydrants › Condition
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 25FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Multiple on deck fire station hose boxes found cracked and broken. Boxes to be permanently repaired or replaced within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Engineering › Fuel Oil Service System › Valve
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 4MAR10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Multiple valves in engine room were not properly marked. Affix permanent valve markings throughout engine room within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Engineering › Steam System (auxiliary) › Lagging/Insulation
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 4MAR10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Thermal insulation missing on hi temperature piping throughout engine room. Install and thermal insulation on all hi temp (150 degrees +) piping including valves where it is missing within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Engineering › Steam System (auxiliary) › Piping
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 4MAR10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Replace steam pipe section that is patched aft of HFO tank. Replace all saturated and deteriorated lagging in this area within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Construction/Loadline › Structures › Door
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 4MAR10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Chalk test all exterior watertight, weather tight, and ventilation closures on the weather deck and replace gaskets and make appropriate repairs as necessary to the satisfaction of the marine inspector within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 25FEB10 and shall remain open until verified to be corrected by attending USCG MI*Internally review the fire control and safety plan incorporating ACTUAL ship arrangement which complies with SOLAS including engine room equipment area and location of fire gear lockers. Class to verify accuracy of fire control plan within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 25FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Repair/replace gate at port accommodation ladder and railing forward of the same within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 4MAR10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Repair stores crane including stuffing tubes, limit switches, and door gaskets area within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Fire Fighting › Ventilation Systems › Ducts
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Repair /replace emergency generator fuel tank vent, starboard side bilge tank vent and survey all flame screens for proper placement area within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Mount all fire extinguishers according to manufacturers instructions. Mount CO2 extinguisher in emergency generator space area within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Fire Fighting › Fire Pumps › Arrangement
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 25FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Install local fire main pressure gauge in the engine room area within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Engineering › Diesel Engine (auxiliary) › Pump, High Pressure (fuel injection)
Issued 10 February 2010 Resolved
*Item reported cleared via class report dated 17FEB10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Demonstrate ability to reduce lube oil pressure at a reduced rate in order to prove low lube oil pressure alarm and shutdown pressure in accordance with manufactures recommendation within 30 days. 10 March 2010.
Action required: 705 - Other - as specified
Due 1 May 2011
Resolved 25 February 2011
Communications › Alarms/Indicators › Rudder Angle Indicator
Issued 23 January 2009 Resolved
Vessel's starboard bridge wing rudder angle indicator sticks in the right full position. Provide technical report of repair and proper working order.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 March 2009
Resolved 25 February 2009
Resolution: Received technician''s report from ''Maritronics'' of Dubai stating that the rudder indicator (Rolls Royce model SR743 serial number #F-7001-01-47) on the starboard bridge wing was internally cleaned, calibrated and satisfactorily tested.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 23 January 2009 Resolved
Jacket water leaks on main engine. Make proper repairs to jacket water pipe.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 March 2009
Resolved 25 February 2009
Resolution: ACTEUR received a statement from the ship''s Master and Chief Engineer attesting to the proper repairs to main engine jacket water pipe system are complete. .
Engineering › Compressed Air System (start air) › Valve
Issued 23 January 2009 Resolved
Safety relief valves are set above MAWP of the air receivers. Provide proof of proper setting and calibration of safety relief valves.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 March 2009
Resolved 25 February 2009
Resolution: ACTEUR received documentation that the relief valves are properly calibrated and set.
Engineering › Feedwater/Condensate Water System › Tank
Issued 21 March 2007 Resolved
VESSEL HAS A MODIFIED 55 GAL DRUM FITTED IN WAY OF THE CASCADE TANK THAT DOES NOT APPEAR TO BE ORIGINAL.PROVIDE CLASS APPROVAL.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 18 April 2007
Resolution: Received letter from the Chief Engineer explaining that the 55 gal drum assembly has been removed.

Casualty record · 7

11 April 2008Routine · role: Involved in a Marine Casualty · activity 3268445
27 December 2008Routine · role: Subject to Marine Inspection · activity 3387889
16 August 2009Routine · role: Involved in a Marine Casualty · activity 3569332
18 June 2010Routine · role: Involved in a Marine Casualty · activity 3789448
23 June 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3803499
1 February 2011Routine · role: Involved in a Marine Casualty · activity 3937666
15 March 2011Routine · role: Involved in a Marine Casualty · activity 3968363
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.