Records from 2007 to 2015. Most recent: inspection, 30 November 2015.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 11
30 November 2015
Internal Structural Exam · Drydock Exam
Physical examination · Activities Europe · Activity 5771889
5 August 2015
MTSA/ISPS Verification · Annual Inspection
Physical examination · Activities Europe · Activity 5206363
12 August 2014
Annual Inspection · MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 4952283
28 March 2014
Administrative Inspection
Administrative · Activities Europe · Activity 4824562
6 March 2014
Administrative Inspection
Administrative · Activities Europe · Activity 4810893
6 June 2012
COI Inspection · MARPOL Annex VI Survey · MARPOL Annex II Examination · MTSA/ISPS Verification · DAPI Audit
Physical examination · Activities Europe · Activity 4273487
6 July 2011
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4071651
10 July 2008
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3263318
24 March 2008
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3170198
13 June 2007
MTSA Verification · Initial Certification · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2960615
14 May 2007
Plan Review (Other than "T")
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 2930082
Fire Fighting › Fire Pumps › Gland Sealing
Issued 5 August 2015
Resolved
Repair leaking fire pump.
Action required: 705 - Other - as specified
Due 16 October 2015
Resolved 9 October 2015
Resolution: Fire pump was replaced.
Engineering › Sea-water System (primary cooling) › Piping
Issued 5 August 2015
Resolved
Replace wasted sections of cooling water piping on #2, 3 & 4 MDE as discussed with C/E.
Action required: 705 - Other - as specified
Due 30 September 2015
Resolved 18 September 2015
Resolution: Replaced all wasted cooloing water piping as directed.
Documentation › Logs/Records › Logbook (official)
Issued 6 June 2012
Resolved
Submit fully completed official ships log book iaw 46CFR131.620 within 90 days.
Due 6 July 2012
Resolved 1 August 2012
Resolution: Adequate documentation provided by the master to clear item.
Fire Fighting › Fire Main › Pressure
Issued 6 June 2012
Resolved
Provide fire pump pressure gauge on the bridge iaw 46CFR130.430.
Due 6 July 2012
Resolved 7 June 2012
Resolution: Onsite completion.
Lifesaving › Line-Throwing Appliances › Water Resistant Casing
Issued 6 June 2012
Resolved
Provide one additional line throwing appliance (4) of the approval series 46CFR160.040.
Due 6 July 2012
Resolved 20 July 2012
Resolution: Adequate documentation provided by the master to clear item.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 6 June 2012
Resolved
Provide CG approved automation test procedure and proof of annual testing iaw 46 CFR 130.480 and the vessels COI.
Due 6 July 2012
Resolved 27 July 2012
Resolution: Adequate documentation provided by the master to clear item.
Communications › Radio Communications › VHF Radiotelephone
Issued 6 June 2012
Resolved
Provide radiotelephone station clock for GMDSS suite iaw 47 CFR 80.865
Due 6 July 2012
Resolved 13 November 2012
Resolution: Received email with evidence from master stating the item is cleared.
Lifesaving › Line-Throwing Appliances › Lines
Issued 6 June 2012
Resolved
Provide 1500 ft auxiliary line for impulse line throwing guns in approval in 46 CFR 160.040.
Due 6 July 2012
Resolved 7 July 2012
Resolution: Adequate documentation provided by the master to clear item.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 6 June 2012
Resolved
Provide oil transfer procedures iaw 33CFR155.720 and 750.
Due 6 July 2012
Resolved 13 August 2012
Resolution: Received evidence from master to clear item.
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 6 June 2012
Resolved
Provide paint locker which is steel or wholly lined in steel iaw 46CFR127.220 by next dry-docking 05Jun2014.
Due 5 June 2014
Resolved 23 October 2013
Resolution: Received email with evidence that the item is cleared.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 6 June 2012
Resolved
Conduct night abandon ship drill iaw 46CFR131.530 (b)(9).
Due 6 July 2012
Resolved 10 June 2012
Resolution: Adequate documentation provided by the master to clear item.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 6 June 2012
Resolved
Install emergency lighting in order to read liferaft placards, launch and embarkation of rescue boat and liferafts at water line in emergency lighting conditions iaw 46CFR131.530.
Due 6 July 2012
Resolved 13 September 2013
Resolution: Received evidence from master to clear item.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 6 June 2012
Resolved
Provide lifejacket lights for all jackets (4) iaw 46CFR133.70 (b).
Due 6 July 2012
Resolved 13 August 2012
Resolution: Received evidence from master to clear item.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 6 June 2012
Resolved
Submit completed DAPI audit provided to master.
Due 6 July 2012
Resolved 6 June 2012
Resolution: Provided upon departure.
Lifesaving › Rescue Boat › Construction
Issued 6 June 2012
Resolved
Provide the rescue boat approval certificate for the documents binder.
Due 6 July 2012
Resolved 8 June 2012
Resolution: Adequate documentation provided by the master to clear item.
Lifesaving › Rescue Boat Equipment › Binnacle/Compass
Issued 6 June 2012
Resolved
Provide 100% of the required rescue boat equipment iaw 46CFR133.175.
Due 6 July 2012
Resolved 14 June 2012
Resolution: Adequate documentation provided by the master to clear item.
Lifesaving › Launching Appliances › Falls
Issued 6 June 2012
Resolved
End for end rescue boat davit cable, due 20 Oct 2011.
Due 6 July 2012
Resolved 18 October 2012
Resolution: New wire certs, weight test documents and photos were proven to clear item.
Documentation › Manuals/Policy Documentation › Instructions for On-board Maintenance (lifesaving)
Issued 6 June 2012
Resolved
Provide complete lifesaving equipment maintenance plan iaw 46CFR131.545/580.
Due 6 July 2012
Resolved 11 June 2012
Resolution: Adequate documentation provided by the master to clear item.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 13 June 2007
Resolved
Vessel shall not operate as an offshore supply vessel until valid loadline certificated is issued
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 July 2007
Resolution: ABS issued loadline certificate.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 13 June 2007
Resolved
Vessel shall not operate for hire until COD is issued.
Due 29 July 2007
Resolved 16 July 2007
Resolution: COD was issued.