MAURY USCG vessel records
← All vessels

STATIA SALUTE

STATIA SALUTE is a 2008 tank barge. The Coast Guard has recorded 30 inspections since 2007, most recently in May 2025, along with 36 deficiencies.

Records from 2007 to 2025. Most recent: inspection, 7 May 2025.

Built
2008
Last inspected
7 May 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 7 May 2025
Operational controls None recorded without a removal date
Years with a record 17 calendar years (2007–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDE7765
878700
Flag
UNITED STATES
Maury page id
psix-878700

Documentation record

Registered dimensions (L × B × D)288.0 ft × 54.0 ft × 19.0 ft
Registered tonnagegross 2,391 / net 1,377
ITC dimensions (L × B × D)288.0 ft × 54.0 ft × 19.0 ft
ITC tonnagegross 2,391 / net 1,377
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2008
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHOUMA, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 14 November 2025 · expires 31 October 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it4900 - Dead Weight, Ton
2391 - Convention (Subpart B), Gross Ton
1377 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 30

7 May 2025 MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8130341
18 October 2024 Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8022163
16 August 2023 Annual Inspection · MTSA Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7756851
11 April 2023 Drydock Exam · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7646257
18 January 2023 Drydock Extension
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7622979
15 November 2022 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7596212
1 June 2022 Internal Structural Exam · COI Inspection · Deficiency Check · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7458900
20 September 2021 Administrative Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7339316
30 August 2021 MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7300418
11 February 2021 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7141138
10 December 2020 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7109749
3 December 2020 Internal Structural Exam · Administrative Inspection · Deficiency Check · Periodic Inspection · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7105857
13 November 2020 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7094481
27 February 2020 Administrative Inspection · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7037183
22 February 2019 Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6625618
24 January 2018 Deficiency Check · Drydock Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6342583
15 November 2017 MTSA Verification · Internal Structural Exam · COI Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6307131
30 January 2017 Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6079476
27 January 2016 Administrative Inspection · MTSA Verification · Periodic Inspection · Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5800877
21 December 2015 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5785275
25 February 2015 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5074442
3 February 2015 Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5050156
23 April 2014 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4842071
19 February 2014 MTSA Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4791399
30 October 2012 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4474896
9 March 2012 MTSA Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4260129
29 March 2010 Deficiency Check · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3847556
1 February 2009 Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3403369
24 December 2008 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3384565
2 October 2007 Internal Structural Exam · MTSA Verification · Initial Certification · Cargo Tank Internal · Hull Examination · Construction Oversight
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3136289

Deficiency record · 36

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 16 May 2025 Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering) of this chapter, except as otherwise provided for in this subchapter. Air compressor engine #2 cylinder's fuel injector has a fuel leak. Replace fuel injector. 46 CFR 32.35-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 June 2025
Resolution: Recieved video evidence of replacement of #2 fuel injector with no fuel leaking.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 1 June 2022 Resolved
All installations shall be of marine type engines suitable for the intended service. The starboard fuel oil pump prime mover had an exhaust leak past the turbo.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 August 2022
Resolved 15 July 2022
Resolution: Exhaust piping was repaired.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 1 June 2022 Resolved
Each cargo tank on a tank barge must have a high level device to indicate visually the level of the liquid in the cargo tank when the liquid is within the range of 1 meter. The 1 meter level indicator located on tank #1stbd was not working as intended since it was stuck in the down position.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 August 2022
Resolved 15 July 2022
Resolution: One meter stick was replaced.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 1 June 2022 Resolved
If during an Internal structural exam damage to the hull plating, structural members, or cargo tanks is discovered, the Officer in Charge, Marine Inspection, may require the vessel to be dry docked to effect permanent repairs. The following areas were identified by the attending marine inspector (MI) to require repairs at the next scheduled dry dock, but no later than 31 JAN 23: Void No.1 (port): Repair vent pipe bottom bracket at FR 12. Void No.3 (port): Repair vent pipe bottom bracket at FR 28. Void No.5 (stbd): Clean rusted areas around/adjacent to ladder. Space between FR 44-45. MI to conduct inspection of area after cleaning. Void No.3 (stbd): Replace vent pipe within space located between FR 28-29. Void No.1 (stbd): Repair pigeon holes located between FR 8-9. There are signs of wastage and small rust trails indicative of water seepage. Void No.2 (stbd): Replace damaged (marked) transverse swash bulkhead (FR 15) and adjacent side shell plating. There are broken welds and insets related to a collision.
Action required: 705 - Other - as specified
Due 31 January 2023
Resolved 11 April 2023
Resolution: All repairs were made during dry-dock.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 20 September 2021 Resolved
Containment systems on board tank barges with a capacity of 250 barrels or more carrying oil as cargo in bulk must have mechanical means of closing each drain. It was noted that there is a overall practice of not installing the mechanical plugs on containment systems and on scuppers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2021
Resolved 8 November 2021
Resolution: Received email and pictures attesting to the installation of containment plugs.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 20 September 2021 Resolved
During each inspection all wing voids, rakes, cofferdams on tank barges shall be opened and checked from on-deck for the presence of water or cargo. The void spaces’ hatch cover knife edges and hinges are showing signs of wastage and need to be replaced/repaired at the next scheduled dry dock.
Action required: 705 - Other - as specified
Due 31 January 2023
Resolved 11 April 2023
Resolution: All repairs were made during dry-dock.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 September 2021 Resolved
A tank vessel with a cargo capacity of 250 barrels or more that carries oil in bulk as cargo must have under each loading manifold a fixed containment so that in case of a spill it can hold its contents. It was noted that the tank barge’s starboard side manifold containment is showing concerning signs of wastage and corrosion. Repair at the next scheduled dry dock.
Action required: 705 - Other - as specified
Due 31 January 2023
Resolved 11 April 2023
Resolution: Manifold containment has been repaired during dry-dock.
02 - Structural Conditions › N/A - No Subsystem › Permanent means of access
Issued 20 September 2021 Resolved
The annual inspection shall include an inspection of the structure is adequate and satisfactory for the route and service intended. It was noted that the starboard side aft stairs leading into the raised walkway aft of the machinery space are wasted and broken.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2021
Resolved 20 September 2021
Resolution: Vessel operator sent pictures of the ladder's repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 1 September 2021 Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1. The port side fuel oil pump prime mover’s exhaust piping is showing signs of leaks as evidenced by the soot accumulated on the lagging.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2021
Resolved 27 October 2021
Resolution: Received video attesting to the proper repairs correcting exhaust leak.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 12 December 2020 Resolved
The STBD side cargo pump piping showed signs of leaking forward of the pump house. Provide evidence of repair.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2020
Resolved 12 December 2020
Resolution: Cargo pumps were repaired by tightening the packing gland bracket.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 12 December 2020 Resolved
The void spaces shall be provided with gooseneck vents. The gooseneck vent pipe under the #2 STBD hatch for void space #1 was not secured at the bottom.
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 13 March 2021
Resolved 28 December 2020
Resolution: Provided photograph showing the gooseneck pipe was secured at the bottom.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 12 December 2020 Resolved
The void spaces shall be provided with gooseneck vents. The gooseneck vent pipe under the #2 STBD hatch for void space #1 was not secured at the bottom.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 March 2021
Resolved 28 December 2020
Resolution: Provided photograph showing the gooseneck pipe was secured at the bottom.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 12 December 2020 Resolved
The void spaces shall be provided with gooseneck vents. The gooseneck vent pipe to the #5 PORT side void space was severely deteriorated at the base on the deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 March 2021
Resolved 15 December 2020
Resolution: Sent photos showing vent pipe reattached to deck.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 12 December 2020 Resolved
Cable conduits located in hazardous locations must be in suitable condition. Cable conduits found on cargo deck area were wasted & eroded.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 March 2021
Resolved 19 March 2021
Resolution: Received photo of repaired cable conduit.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 12 December 2020 Resolved
All exposed & dangerous places such as gears & machinery shall be protected with covers, guards, or rails. Guards were missing around rotating machinery. Install guards.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2021
Resolved 16 December 2020
Resolution: Vessel rep. provided photos of installed guards.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 December 2020 Resolved
All lifesaving appliances and arrangements on tank vessels must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. Gasket on self igniting light was wasted and attached with incorrect line type. Replace or repair to manufacturer's requirements.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2020
Resolved 11 February 2021
Resolution: Received photo of repair.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 12 December 2020 Resolved
The majority of void space hatch covers & dogging devices were broken or deteriorated. Repair or replace. Provide evidence of weathertight integrity.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2021
Resolved 25 May 2021
Resolution: Vessel representative provided photographs of repaired hatch covers.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 12 December 2020 Resolved
The FWD rake hatch cover is missing a piece of the seal. Repair or replace.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2021
Resolved 3 March 2021
Resolution: Received photographs of replaced gasket.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 February 2019 Resolved
Piping systems not requiring plan review may be accepted by the marine inspector if there are guards, shields, insulation, and similar devices where needed for protection of personnel. The marine inspector noted there was a missing section of insulation on the exhaust piping elbow past the turbocharger on both prime movers for the barge’s generators.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2019
Resolved 1 May 2019
Resolution: Missing insulation was properly installed. Cleared deficiency.
Construction/Loadline › Structures › Manhole
Issued 27 November 2017 Resolved
Install missing ladder rung on vessel’s port side permanent ladder installation.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 27 November 2017 Resolved
Install missing handrail at top of permanent ladder installation.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Construction/Loadline › Hull › Side Shell
Issued 27 November 2017 Resolved
Void Space #5 (Port side): Crop and renew side shell plating at frame 33 and side long #3.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Construction/Loadline › Hull › Bottom Plating
Issued 27 November 2017 Resolved
Void Space #5 (Port side): By aft ladder, clean whole bay bottom plating, grind rusted areas, look for damage (if any), and recoat.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 27 November 2017 Resolved
Void Space #3 (Port side): Crop and renew swash bulkhead at side long # 3 and 4 (buckled). Frame 25.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Construction/Loadline › Hull › Longitudinal Frame
Issued 27 November 2017 Resolved
Void Space #2 (Port side): Crop and renew side long #3 between frames 14 and 15.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 27 November 2017 Resolved
Space#1 (Port Side): At frame #7, grind and re-weld small fractures on web frame and connection with cargo tank exterior.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Construction/Loadline › Hull › Longitudinal Frame
Issued 27 November 2017 Resolved
Void Space #1 (STBS Side): Crop and renew ladder connection (forward hatch ladder), adjacent side long (#7 side long) and tripping bracket connecting with forward transverse watertight bulkhead.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Deck/Cargo › Holds/Tanks › Hatch
Issued 27 November 2017 Resolved
Repair all damaged void spaces’ hatch hinges.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 12 February 2018
Resolution: Permanent repairs were effected. Cleared deficiency.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 3 February 2015 Resolved
Prove proper operation of the stern light.
Action required: 705 - Other - as specified
Due 13 February 2015
Resolved 7 February 2015
Resolution: Received digital photo of operational light as well as an email stating battery and charging system had been repaired/replaced.
Construction/Loadline › Structures › Scuttle
Issued 3 February 2015 Resolved
Repair broken hinges on the starboard #2 aft and #3 forward voids (46 CFR 42.15-40(a)).
Action required: 705 - Other - as specified
Due 23 February 2015
Resolved 25 February 2015
Resolution: Recieved email with pictures of repaired hinges.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 29 March 2010 Resolved
Prove proper operation of stbd aft MGO relief valve.
Due 30 July 2010
Resolved 13 July 2010
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 29 March 2010 Resolved
Prove proper operation of port aft MGO relief valve
Due 31 July 2010
Resolved 13 July 2010
Construction/Loadline › Structures › Scuttle
Issued 29 March 2010 Resolved
Repair all broken wing voud hatch hinges.
Due 31 July 2010
Resolved 12 July 2010
Construction/Loadline › Structures › Ventilators
Issued 29 March 2010 Resolved
Prove proper operations of all louver closure fastners
Due 31 July 2010
Resolved 13 July 2010
Fire Fighting › Ventilation Systems › Operating Controls
Issued 29 March 2010 Resolved
Replace all broken glass emergency glass emergency supply vent shut off.
Due 31 July 2010
Resolved 13 July 2010
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 17 October 2008 Resolved
Per reg 33 CFR 155.1040(j), the VRP must be amended to either identify a classified oil spill removal organization for the Great Lakes Captain of the Port zones, or remove these zones from the plan.
Due 17 November 2008
Resolved 28 April 2009
Resolution: Tank VRP Control #05212 removed Great Lakes zones from plan. Deficiency cleared, no response needed. VRP approval expires 11/16/2012.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.