Records from 2007 to 2008. Most recent: operational control imposed, 20 April 2008.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 1 May 2007
Resolved
Vessel does not meet their Minimum Safe Manning document. They are Missing their electrician, vessel is to comply with their Minimum Safe Manning to the satisfaction of CG inspector.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 1 May 2007
Resolved 14 May 2007
Resolution: Vessel has embarked three additional personnel including a licensed third engineer. Each were found with the required and valid licenses and certificates.
Operations/Management › Ballast Water Managment › Ballast Water Discharge
Issued 1 May 2007
Resolved
Vessel does not have Ballast water manual. Vessel is to acquire a manual that meets the satisfaction of CG Inspector.
Condition: Unknown
Due 1 June 2007
Resolved 20 December 2007
Resolution: Vessel has Ballast Water Management plan
Fire Fighting › Emergency Fire Pumps › Capacity
Issued 1 May 2007
Resolved
Vessels emergency fire pump did not have adequate pressure. Vessel is to submit class report to local OCMI.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 May 2007
Resolution: Received Class report from DNV stating, "Repaired: Function test was carried out on the emergency fire pump and now found in order with adequate pressure complying with SOLAS requirements."
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 1 May 2007
Resolved
Vessels fuel lines on main diesel engine had rags tied around fittings, Vessel is to repair lines and provide class report to local OCMI.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 May 2007
Resolution: Received class report from DNV which states, "Repaired: Rags tied around the fuel lines on the Main Engine were removed and fuel oil leakages were now rectified by tightening fuel lines coupling joints."
Fire Fighting › Structural - A Class Divisions › Doors
Issued 1 May 2007
Resolved
Vessel was using tie backs on fire doors, doors were not self closing. Vessel remove tie backs, and bring doors up to code. Vessel is to provide class report to local OCMI.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 May 2007
Resolution: Received Class report from DNV stating "The doors at ECR leading to machinery space, fr.22 and door at air lock space-portside, fr. 4-6 leading to workshop is now fitted with self closing devices and tie backs have been removed".
Documentation › Certificates/Documents › Safety Management Certificate (ISM)
Issued 1 May 2007
Resolved
Vessel Safety Management Certificate is interim. The vessel has not had an internal audit of the ship within three months.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2007
Resolution: DNV completed audit and verified vessel is in compliance with ISM code.
Personnel › Training › Familiarization Training
Issued 1 May 2007
Resolved
Master has not reviewed the SMS safety management system. He also did not know and could not find vital information. Such as his responsibilities.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2007
Resolution: Training on SMS has been completed. Master reviewed SMS and forwarded concerns to company, fulfilling the CG requirement of familiarization.
Personnel › Training › Familiarization Training
Issued 1 May 2007
Resolved
Company familiarizations procedures for new personnel are not being followed as per the SMS.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2007
Resolution: DNV instructed crew of the duties of individuals and completed familiarization.
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 1 May 2007
No resolution recorded
The SMS maintenance procedures are not being followed, the master, chief office, chief engineer could not provide any maintenance documentation.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolution: DNV completed audit and verified vessel is in compliance with ISM code.
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 1 May 2007
Resolved
Non-Conformity reports submitted to the company are not on the form provided in the SMS.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2007
Resolution: DNV completed audit and verified vessel is in compliance with ISM code.
Documentation › Safety Management System › Critical Equipment/Systems ID Procedures
Issued 1 May 2007
Resolved
Vessel can not provide record of corrective actions from the company in response to submitted Non-Conformity reports. SMS states company shall provide such information in a non-conformity conformity report
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2007
Resolution: DNV completed audit and verified vessel is in compliance with ISM code.
Documentation › Safety Management System › Critical Equipment/Systems ID Procedures
Issued 1 May 2007
Resolved
Vessels chief engineer is unfamiliar with all aspects of the SMS. When shown SMS manual he stated he had never seen it before.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2007
Resolution: DNV completed audit and verified vessel is in compliance with ISM code. C/E received training to the satisfaction of DNV.