Records from 2007 to 2026. Most recent: inspection, 11 March 2026.
Documentation record
Registered dimensions (L × B × D)30.4 ft × 10.5 ft × 4.0 ft
Registered tonnagegross 8 / net 6
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHUDSON CUSTOM JET BOATS · CLARKSTON, WA, UNITED STATES · built 2007
Hull materialAluminum
PropulsionJet Drive
Hull shapeShip
Hull configurationMonohull
Hailing portLEWISTON, ID
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 19 February 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it8 - Simplified, Gross Ton
6 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 19
11 March 2026
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8320404
27 March 2025
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8103973
22 April 2024
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7903503
30 March 2023
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7685445
15 March 2022
COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7403275
24 February 2021
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7151643
19 February 2020
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6916055
20 March 2019
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6673733
5 March 2018
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6362049
31 January 2017
Hull Examination · COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6081590
8 March 2016
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5825808
4 March 2014
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4804954
3 February 2012
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4237978
16 March 2010
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3682336
2 April 2009
Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3445159
17 March 2009
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3428657
16 April 2008
DAPI Audit
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3185833
11 March 2008
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3167443
23 April 2007
COI Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2933990
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 March 2025
Resolved
46 CFR 182.520(a)...Individual power pumps used for separate spaces are to be controlled from a central control point and must have a light or other visual means at the control point to indicate operation. Inspector identified indicating light for automatic bilge pump was inoperable. Owner directed to replace light/switch.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 21 April 2025
Resolution: MI verfied light is operational.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 February 2020
Resolved
Prove proper operation of vapor detection system.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2020
Resolved 17 March 2020
Resolution: Attending Marine Inspector witnessed the proper operation of the vapor detection system.
Communications › Alarms/Indicators › Fire Alarm
Issued 17 March 2009
Resolved
Gasoline Fume detector failed to operate, make alarm operable.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 April 2009
Resolved 2 April 2009
Resolution: Replaced fume sensor.