Records from 2019 to 2024. Most recent: inspection, 17 August 2024.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 17 August 2024
No resolution recorded
Fixed fire detection and fire alarm system installations shall be suitable for the nature of the space.
PSCO observed non-functional smoke detector in purifier flat. Audible alarm could not be heard from space.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 August 2024
No resolution recorded
Means shall be provided to control leaks of flammable liquids. PSCO observed excessive oil leakage and accumulation at all three auxiliary engines, main air compressors #1 and #2, steering gear, fuel oil transfer pumps, fuel oil booster pump, and waste oil tank.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 August 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations.
PSCO observed pressurized steam leak on boiler water circulating pump.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 17 August 2024
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 17 August 2024
No resolution recorded
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 mm diameter and is at least 25.4 mm long. It must be located at the top of the flange face, midway between bolt holes, and in line with the bolt hole pattern.
PSCO observed 03 out of 04 vapor line connections missing studs. Make repairs to the vapor lines prior to loading cargo.
Condition: Design Flaw
Action required: 15 - Rectify deficiencies by next port
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 24 August 2021
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 September 2021
Resolved 3 September 2021
Resolution: Recieved Flag state report noting that vessel Master has been replaced with new Master who is fully familiar with the Company SMS procedures. Additional training been given in batches for entire crew on board by SMS trainer.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 August 2021
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA. VESSEL EXPERIENCED MULTIPLE INSTANCES OF LOSS OF PROPULSION WHILE TRANSITING TO THE PORT OF POINT COMFORT.
74 SOLAS (20) I/11
Condition: Invalid
Action required: 30 - Ship detained
Due 8 September 2021
Resolved 3 September 2021
Resolution: According to flag state survey, it was discovered that ship crew failed to start necesary 3rd gen set creating low air pressure. Ship crew has been re-educated and all Gent sets and ME have been tested without fault by Flag.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 August 2021
Resolved
ELECTRICAL INSTALLATIONS SHALL BE SUCH AS TO MINIMIZE THE RISK OF FIRE AND EXPLOSION FROM FLAMMABLE PRODUCTS. THE EMERGENCY STOPPING DEVICES AT THE PORT AND STARBOARD MANIFOLDS WERE MISSING VAPOR TIGHT PACKING GLANDS IN SWITCH HOUSINGS.
74 SOLAS (20) VII/10.1 - IBC 10.1.2.1
Condition: Improper Installation
Action required: 30 - Ship detained
Due 8 September 2021
Resolved 3 September 2021
Resolution: according to Flag state survey, glands have been replaced and sealed properly
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 August 2021
Resolved
ALL GASKETED CARGO-PIPE JOINTS AND HOSE CONNECTIONS SHALL BE ELECTRICALLY BONDED. OVER 15 BONDING CONNECTIONS WERE FOUND MISSING OR WASTED IN THE CARGO AREA.
74 SOLAS (20) VII/10.1 - IBC 10.2
Condition: Improper Installation
Action required: 30 - Ship detained
Due 8 September 2021
Resolved 3 September 2021
Resolution: According to flag state survey, missing bonding cables have been renewed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 24 August 2021
Resolved
EACH CARGO TANK OF A TANKSHIP MUST BE EQUIPPED WITH AN INTRINSICALLY SAFE HIGH-LEVEL AND A TANK OVERFILL ALARM. THE NO. 1 STARBOARD AND NO. 3 STARBOARD CARGO TANK OVERFILL ALARMS ARE INOPERABLE. OVERFILL ALARMS MUST BE OPERATIONAL PRIOR TO LOADING CARGO IN THE NO. 1 STARBOARD AND NO. 3 STARBOARD CARGO TANKS.
46 CFR 39.2007(a)
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 January 2022
Resolved 17 August 2024
Resolution: Witness High level and overfill alarms for the following Port & Stbd tanks satisfactory: 1,3, 5, 10 during COC Exam.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 August 2021
Resolved
SHIPS SHALL BE DESIGNED, CONSTRUCTED AND MAINTAINED IN COMPLAINCE WITH THE STRUCTURAL, MECHANICAL AND ELECTRICAL REQUIREMENTS OF A CLASSIFICATION SOCIETY WHICH IS RECOGNIZED BY THE ADMINISTRATION. HARDWARE, U-BOLTS, AND GENERAL CONDITION OF DECK EQUIPMENT TO INCLUDE NO. 6 PORT BALLAST TANK HYDRAULIC ACTUATED VALVE CONTROLLER, CARGO PIPING, FRESH AND SALT WATER TANK WASHING PIPING, STEAM PIPING, SHIPS SERVICE AIR PIPING, FOUR BALLAST TANK VENT HEADS, AND ASSOCIATED VALVES WERE FOUND MISSING OR SEVERELY WASTED.
74 SOLAS (04) II-1/3-1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 January 2022
Resolved 19 August 2024
Resolution: Recevied objective evidence via power point attesting to repairs, cleared def.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 August 2021
Resolved
THE CARGO SAMPLE STOWAGE SPACE SHALL BE CELL-DIVIDED TO AVOID SHIFTING OF THE BOTTLES AT SEA. THE SAMPLES IN BOTH THE ANNEX I AND ANNEX II CARGO STOWAGE SPACES WERE INADEQUATELY STORED, CAUSING THE BOTTLES TO SHIFT AND BREAK.
74 SOLAS (20) VII/10.1 - IBC 16.5.2.1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2021
Resolved 3 September 2021
Resolution: According to flag state survey, Space has been cleaned, arranged and bottles placed in given slots. Ship staffs have been trained on the procedures in line with SMS .
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 August 2021
Resolved
DECONTAMINATION SHOWERS AND AN EYEWASH SHALL BE AVAILABLE ON DECK IN CONVENIENT LOCATIONS. THE FORWARD EYEWASH STATION WAS NON-OPERATIONAL.
74 SOLAS (20) VII/10.1 - IBC 14.3.4
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2021
Resolved 3 September 2021
Resolution: According to Flag State Survey, Water connection was turned on and tested. Found satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 August 2021
Resolved
THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. FOUR SHIPS SERVICE AIR VALVES IN THE CARGO DECK AREA WERE FOUND LEAKING BY.
74 SOLAS (04) II-1/26.1
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 8 September 2021
Resolved 17 August 2024
Resolution: No air leaks from valves in cargo deck area were noticed during COC Exam.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 August 2021
Resolved
FIRE EXTINGUISHERS SHALL BE SITUATED READY FOR USE AT EASILY VISIBLE PLACES, WHICH CAN BE REACHED QUICKLY AND EASILY AT ANYTIME IN THE EVENT OF A FIRE, AND IN SUCH A WAY THAT THEIR SERVICEABILITY IS NOT IMPAIRED BY WEATHER, VIBRATION OR OTHER EXTERNAL FACTORS. PORTABLE FIRE EXTINGUISHER LOCATED AT THE ENTRYWAY OF THE BALLAST PUMP ROOM WAS FOUND UNSECURED AND MISSING THE LATCHING MECHANISIM.
74 SOLAS (04) II-2/10.3.2.4
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 September 2021
Resolved 19 August 2024
Resolution: Recevied objective evidence via power point attesting to repairs, cleared def.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 24 August 2021
Resolved
AN INERT GAS SYSTEM SHALL BE CAPABLE OF: DELIVERING INERT GAS WITH AN OXYGEN CONTENT OF NOT MORE THAN 5% BY VOLUME TO THE CARGO TANKS AT ANY REQUIRED FLOW RATE. NITROGEN GENERATOR WAS UNABLE TO PRODUCE AN OXYGEN CONTENT BELOW 20% BY VOLUME.
74 SOLAS (04) II-2/4.5.5.3.2 – FSS 15.2.2.1.2.5
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 24 August 2021
Resolved 24 August 2021
Resolution: N2 GENERATOR PRODUCED AN OXYGEN CONTENT BELOW 5% BY VOLUME.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 18 July 2019
Resolved
The ring, lines and letters shall be painted in white or yellow on a dark ground or in black on a light ground. The loadline and deck line were rubbed off.
ICLL REG 8
Action required: 10 - Deficiency Rectified
Due 25 July 2019
Resolved 25 July 2019
Resolution: Deficiency rectified.