Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)154.0 ft × 42.0 ft × 10.0 ft
Registered tonnagegross 543 / net 543
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderC & C MARINE · BELLE CHASSE, LA, UNITED STATES · built 2008
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portHOUMA, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 27 April 2026 · expires 30 April 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it543 - Simplified, Gross Ton 543 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 24
6 August 2025Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8193080
3 May 2024Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7906084
5 December 2023Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7834157
19 September 2023Administrative Inspection · Deficiency Check · Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7795493
20 January 2023Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7624717
12 December 2022Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7607812
14 July 2021In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7255901
13 October 2020Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7076416
8 June 2020MTSA Verification · Administrative Inspection · Construction Oversight · COI Inspection · Cargo Tank Internal
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 3 May 2024Resolved
Each cargo tank of a tank barge must have one of the following liquid overfill protection arrangements: A system meeting the requirements of 46 CFR 39.2007. Vessel high level/overfill protection systems would not operate as intended. Repair alarm system.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 June 2024
Resolution: Witnessed operational test of alarm system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 May 2024Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering) of this chapter, except as otherwise provided for in this subchapter. Fuel lines on prime mover are wasted. Replace.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 June 2024
Resolution: Witnessed replacement of fuel lines.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 3 May 2024Resolved
A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have under or around each loading manifold and each transfer connection point, a fixed container or enclosed deck area that, in all conditions of ship list or trim encountered during the loading operation, has a capacity of at least one barrel if it serves one or more hoses with an inside diameter of more than 2 inches but less than 4 inches, or one or more loading arms with a nominal pipe size diameter of more than 2 inches but less. Diaphragm pump not in containment. Place in containment.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 June 2024
Resolution: Pump relocated to within containment zone.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 3 May 2024Resolved
The last 1.0 meter (3.3 feet) of vapor piping upstream of the vessel vapor connection and each end of a vapor hose must be Painted in the sequence of red/yellow/red. The width of the red bands must be 0.1 meter (0.33 foot) and the width of the middle yellow band must be 0.8 meter (2.64 feet); and labeled with the word “VAPOR” painted in black letters at least 50.8 millimeters (2 inches) high.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 June 2024
Resolution: Witnessed VCS line painted.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 20 September 2023Resolved
Each tank vessel with a cargo capacity of 1,000 or more cubic meters (approximately 6,290 barrels), loading oil or oil residue as cargo, must have one overfill device that is permanently installed on each cargo tank and meets the requirements of this section. Inoperable overfill alarm on 3P cargo tank. Loading of 3P tank is limited to 75% full. Completed NLT 10/21/2023
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 October 2023
Resolved 27 September 2023
Resolution: overfill alarm repaired
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 20 September 2023Resolved
The operator of a vessel with a capacity of 250 or more barrels of oil, hazardous material, or liquefied gas as regulated in Table 4 of 46 CFR part 154 shall provide transfer procedures that meet the requirements of this part and part 156 of this chapter. Vessel's transfer procedures were not specific to vessel's system.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2023
Resolved 27 September 2023
Resolution: transfer procedures updated
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 27 February 2020Resolved
All Cargo Tanks vented at a gage pressure of 4 pounds per square inch or less shall be constructed and tested as required by the standards established by the American Bureau of Shipping(ABS) or other recognized society(RO). Vessel has 6 independent cargo tanks installed on the deck. As per MSC Document dated February 21, 2020 (serial: E1-2000653) these tanks do not meet the minimum thickness as required by ABS or other RO. Vessel is restricted from utilizing these tanks and or must remove from the barge.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 June 2020
Resolution: Atlas oil constructed a approved independent cargo tank and removed portable totes.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 5 November 2019Resolved
46CFR31.10-25: Modifications were made without having prior approval from Commandant. Submit plans detailing the addition of all new machinery and equipment to the barge to MSC for approval prior to conducting cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 February 2020
Resolution: All plans have been submitted to MSC for approval. This meets the 835V requirements issued by Sector H/G.
Provide documentation that Cargo Pump engine wiring harness and sensor are approved for class 1 div 1 locations IAW 46 CFR 111.105.
Action required: 705 - Other - as specified
Due 30 June 2011
Resolved 13 May 2013
Resolution: Relocated cargo pump prime mover so it is outside of immediate hazardous location area.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 23 April 2008Resolved
Certificate of Financial Responsibility not yet approved.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 June 2008
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.