MAURY USCG vessel records Sign in
← All vessels

MMLP 853

MMLP 853 is a 2008 tank barge. The Coast Guard has recorded 21 inspections since 2008, most recently in May 2026, along with 9 deficiencies.

Records from 2008 to 2026. Most recent: inspection, 5 May 2026.

Built
2008
Last inspected
5 May 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

890728
Flag
UNITED STATES
—
Maury page id
psix-890728

Inspections, by type

Years with a record 17 calendar years (2008–2026)
The 21 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)214.0 ft × 42.0 ft × 10.0 ft
Registered tonnagegross 754 / net 754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD SHIPYARD LLC · MORGAN CITY, LA, UNITED STATES · built 2008
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portBEAUMONT, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 19 December 2025 · expires 31 January 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it754 - Simplified, Gross Ton
754 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 21

5 May 2026 Administrative Inspection · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8367292
6 May 2025 Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8129548
5 April 2024 Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7890412
19 April 2023 Internal Structural Exam · Administrative Inspection · Examination of Repairs · COI Inspection · In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7671609
23 February 2022 Examination of Repairs · MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7400943
9 June 2021 Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7220609
18 February 2021 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7142382
11 June 2020 Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6974007
14 February 2020 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6909287
3 July 2019 Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6734718
22 May 2018 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6420513
13 April 2018 COI Inspection · MTSA Verification · Hull Examination · Cargo Tank Internal · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6391244
12 June 2017 Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6173200
11 April 2016 Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5851763
23 January 2015 Administrative Inspection · MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5058077
3 February 2014 Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4794759
14 March 2012 Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4263603
4 February 2010 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3675307
30 December 2009 MTSA Verification · Annual Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3658229
30 March 2009 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3443002
26 March 2008 COI Inspection · Construction Oversight · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3171662

Deficiency record · 9

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2022 Resolved
Each cable installation must meet Sections 25 of IEEE, except 25.11 of IEEE 45-2002. In accordance with IEEE 45-2002/25.4, cables passing through tanks and where exposed on weather decks, where they are particularly liable to damage, such as locations in way of cargo ports, hatches, tank entry trunks, and where crossing walkways should be protected by installation in pipe, under angle iron supports, covered raceways, or equivalent means. One of the vessel's electrical circuit installed on the weather deck and running along the side of another circuit, which is currently inside a conduit pipe, is loose at several locations on the weather deck within the hazardous location. Additionally, its armored cable has been damaged at several places, which creates an electrical safety hazard. Vessel shall make permanent repairs to the satisfaction of a Coast Guard Marine Inspector prior to operating such electrical circuit. 46 CFR 111.60-5 705 C
Action required: 705 - Other - as specified
Due 6 June 2022
Resolved 9 May 2022
Resolution: Vessel repaired improper cable installation IAW IEEE 45-2002/25.4
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 5 May 2022 Resolved
The following plans, if particular to the vessel, must be submitted for Coast Guard review in accordance with 46 CFR 110.25-3: (i) For vessels with hazardous locations for which part 111, subpart 111.105, is applicable, plans showing the extent and classification of all hazardous locations, including information on equipment... Upon request to the barge representative of objective evidence that the current prime mover configuration has been reviewed and/or approved by the Marine Safety Center, the representative was not able to provide documentation verifying the required compliance addressed on Coast Guard Letter Titled 16711/Pump Engines submitted on November 5th, 2010, to Settoon Towing LLC. On such letter, the vessel needed to submit evidence to the Coast Guard that the electronically controlled engine meets Class I Div 1 compliance. Vessel shall submit documentation providing evidence that equipment meets the Class I Div I compliance criteria within 30 days of this inspection. 46 CFR 110.25-1(i) 50 C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2022
Resolved 3 June 2022
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 April 2022 Resolved
Vessel has set-in approx. 4'6" x 3.0"(depth) on its gunwale on port side near midship. Vessel to affect permanent repairs to the satisfaction of a Coast Guard Marine Inspector w/in 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 May 2022
Resolution: Repairs were sat
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 8 April 2022 Resolved
TBD #2 viewing port hatch cover rusted and not capable of maintaining water tight integrity. Vessel to affect permanent repairs to the satisfaction of a Coast Guard Marine Inspector w/in 30 days.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 May 2022
Resolution: See attached Plate Summary Sheet.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 April 2022 Resolved
Butterworth cargo hatch covers had excessive corrosion. Corrosion is suspected to be over 30%. The vessel intends to replace all butterworth cargo hatch covers. Vessel to affect permanent repairs to the satisfaction of a Coast Guard Marine Inspector w/in 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 May 2022
Resolution: See attached Plate Summary Sheet.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 April 2022 Resolved
High level overfill devices had excessive corrosion. Corrosion is suspected to be over 25%. The vessel intends to replace all high level overfill devices. Vessel to affect permanent repairs to the satisfaction of a Coast Guard Marine Inspector w/in 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 May 2022
Resolution: See attached Plate Summary Sheet.
Construction/Loadline › Structures › Deck Plating
Issued 6 January 2010 Resolved
Provide the Marine Safety Center Approval letter for the additional Cargo Piping system of the newly installed lube oil tanks and structural deck support of the newly install lube oil and potable water tanks.
Action required: 705 - Other - as specified
Due 6 February 2010
Resolved 4 February 2010
Resolution: Cargo piping system is approved. Issued new requirement for structual deck support.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 26 March 2008 Resolved
Wiring Harness on Prime Mover is not intrinsically safe, explosion proof, or purged and pressurized for a Class I Div I area. Ref D8(dp) Policy Letter 02-2007 CH1. Barge is allowed to operate until Aug 2008 per policy ltr.
Action required: 705 - Other - as specified
Due 30 June 2011
Resolved 1 March 2011
Resolution: 01MAR11: D8 issued letter to Settoon Towing, LLC dated 05NOV10 stating the Class I Div I compliance date has been postponed. This vessel must comply with the Class I Div I requirement by the first dry dock after 01NOV2011, but no later than 01NOV2015.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 26 March 2008 Resolved
No cargo operations are allowed until a COFR for the barge is presented to the local OCMI.
Action required: 705 - Other - as specified
Resolved 2 April 2008

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.