Records from 2009 to 2026. Most recent: inspection, 27 April 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)150.4 ft × 36.0 ft × 11.5 ft
Registered tonnagegross 83 / net 56
ITC dimensions (L × B × D)150.4 ft × 36.0 ft × 11.5 ft
ITC tonnagegross 499 / net 192
BuilderC & C BOATS WORKS LLC · BELLE CHASSE, LA, UNITED STATES · built 2007
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 16 August 2025 · expires 30 September 2026
Service, as the file records itIndustrial Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it499 - Convention (Subpart B), Gross Ton
456 - Displacement, Gross Ton
488 - Dead Weight, Gross Ton
83 - Regulatory (Subpart C or D), Gross Ton
192 - Convention (Subpart B), Net Ton
56 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page
30 inspections, each with its date, unit and type; 18 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; 1 other recorded name, with years; 5 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
Inspection history · 30
27 April 2026
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8356675
18 March 2026
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8328638
27 January 2026
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8302137
14 January 2026
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8296617
8 January 2026
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8292446
24 November 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8267710
23 September 2024
Internal Structural Exam · COI Inspection · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8007792
7 May 2024
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7908936
7 May 2024
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7910074
19 December 2023
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7841590
18 January 2022
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7381800
13 January 2022
Administrative Inspection · Drydock Exam · Cargo Tank Internal · COI Inspection · Internal Structural Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7379916
16 April 2021
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7176668
8 April 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7172591
15 March 2021
Annual Inspection · Administrative Inspection · In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7156324
13 April 2020
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6940182
20 May 2019
MTSA/ISPS Verification · MARPOL Annex I Examination · Annual Inspection · MARPOL Annex VI Survey · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6688336
26 April 2019
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6671086
12 April 2019
Administrative Inspection · Drydock Exam · Cargo Tank Internal · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6683319
9 December 2018
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6594632
9 December 2018
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6607010
27 July 2018
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6497549
10 July 2018
DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6473932
4 October 2017
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6281377
3 May 2017
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6138024
2 May 2017
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6136963
2 May 2017
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6138042
11 April 2017
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6122313
8 March 2017
Drydock Exam · COI Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6102118
24 February 2016
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5820741
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 8 January 2026
Resolved
Certificates of inspection may be revoked or suspended by the Coast Guard where such process is authorized by law. This may occur if the vessel does not meet the requirements of law or regulations in this chapter or if there is a failure to maintain the safety requirements requisite to the issuance of a certificate of inspection. Vessel must recieve a satifactory inspection prior to operating commercially with new operator
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2026
Resolved 14 January 2026
Resolution: Completed in service inspection and witnessed drills. All sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Tonnage certificate
Issued 13 January 2022
Resolved
Vessel has additional PAMS installed on the aft deck, which are portable enclosed spaces/temporary deck equipment, and therefore subject to inclusion in tonnage. Vessel must get readmeasured, and provide updated Tonnage Certificate to the USCG.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 February 2022
Resolved 23 February 2022
Resolution: Vessel provided new Tonnage Certificate from ABS
08 - Alarms › N/A - No Subsystem › General alarm
Issued 13 January 2022
Resolved
Vessel has PAMS installed, in which the General Alarm cannot be heard. Provide a general alarm or acceptable alternative, to ensure emergency notification of personnel in these spaces. Personnel must not be carried in these spaces until rectified.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 22 February 2022
Resolution: Company provided an acceptable administrative change to their emergency notification procedures.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 13 January 2022
Resolved
Fire and Safety Plan does not reflect the installation of a 3rd, smaller Portable Module on the aft deck. Update the Fire Control Plan with this module and its associated required equipment.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 March 2022
Resolved 22 February 2022
Resolution: FSP change was provided by o/o. Since vessel is currently uninspected, this def is moot.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 13 January 2022
Resolved
The hold back latch on the port side engine room escape hatch did not securely hold back the hatch when opened, creating an unsafe conditon with the hatch in the open position.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 March 2022
Resolved 17 February 2022
Resolution: Vessel rep provided a picture of the functioning holdback latch.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 March 2021
Resolved
Renew Flexible Jacket Water Coupling on BMDE's or prove satisfactory condition. Flexible Couplings on BMDE's were found cracked and showing signs of deterioration.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2021
Resolved 16 April 2021
Resolution: Flex Couplings replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 March 2021
Resolved
Renew Extinguished lamps on the main switchboard. At time of inspection various (4) lamps were extinguished and spares were not readily available.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 April 2021
Resolved 25 March 2021
Resolution: PLC's adjusted to correct settings and Lamps replaced; All-Sat
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 10 July 2018
Resolved
Top rail course (wire rope) was found missing. Replace so that maximum height is at least 39.5" IAW 46 CFR 92.25-5.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2018
Resolved 27 July 2018
Resolution: Bulwarks reinstalled after completing mission with SpaceX.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 10 July 2018
Resolved
Renew expired batteries for all ring buoy water lights prior to operating.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 July 2018
Resolved 15 August 2018
Resolution: Batteries renewed. O-rings did not seal water light.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 July 2018
Resolved
Repair inoperable running lights port and starboard sides and anchor light prior to opreating.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 July 2018
Resolved 15 August 2018
Resolution: Nav light panel did not have power when visited for def check.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 10 July 2018
Resolved
Renew inoperable and/or weak emgergency light batteries thru out the vessel prior to operating.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 July 2018
Resolved 27 July 2018
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 July 2018
Resolved
Renew gasket to WTD at entry to bow thruster space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2018
Resolved 27 July 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 July 2018
Resolved
Prove proper operation of reverse power relay for SSDG#1.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2018
Resolved 27 July 2018
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 July 2018
Resolved
Renew extinguished lamp on the generator switchboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2018
Resolved 27 July 2018
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 July 2018
Resolved
Secure receptacles above the port engine room escape and overhead outside the bow thruster space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2018
Resolved 27 July 2018
Construction/Loadline › Hull › Side Shell
Issued 2 May 2017
Resolved
Damage on STBD bow, aprox 8'X8'. Complete temp repar on stem crack, aprox 8"long by 1/16" prior to transiting to Conrad Shipyard in Morgan City, LA to conduct permanent repairs. Contact Morgan City CG Inspections Office to coordinate repair proposa. All repairs are to be completed to satisfaction of cognizant OCMI prior to vessel operations.
Action required: 705 - Other - as specified
Due 1 June 2017
Resolved 1 June 2017
Resolution: Rcvd repair proposal and maintained oversight in conjuctino with ABS for repairs. Repairs complete satisfactory.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 24 March 2017
Resolved
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 April 2017
Resolved 11 April 2017
Resolution: Liferafts installed to meet Subchapter I regulations
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 8 March 2017
Resolved
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 April 2017
Resolved 11 April 2017
Resolution: Fire and Safety Plan updated to include liferafts and remove life floats