Records from 1986 to 1991. Most recent: inspection, 22 May 1991.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 21
22 May 1991
Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 920409
16 May 1991
Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1220068
1 April 1991
Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1221334
17 December 1990
Examination of Repairs
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 930421
14 December 1990
Examination of Repairs
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1240880
10 December 1990
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1234953
5 December 1990
Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1219347
4 December 1990
Damage Survey
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1218039
4 December 1990
Damage Survey
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1220272
25 June 1990
Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 934932
14 June 1990
Re-Inspection
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1229141
18 May 1989
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1037706
16 May 1989
COI Inspection
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 887810
20 May 1988
Re-Inspection
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1044636
19 February 1988
Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1026624
10 July 1987
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1325997
25 June 1987
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1315487
23 June 1987
Re-Inspection
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1006936
10 April 1986
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1306581
28 March 1986
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 996815
26 March 1986
Credit Drydock · COI Inspection
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 996812
Construction/Loadline
Issued 4 December 1990
Resolved
PRIOR TO PLACING VESSEL IN WATER, MAKE PERMANENT REPAIRS TO HULL FRACTURE. REPAIRS WILL BE MADE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 4 December 1990
Resolved 4 December 1990
Lifesaving
Issued 14 June 1990
Resolved
PROVIDE ONE EMERGENCY FLOAT LIGHT FOR THE LIFE FLOAT AND RENEW ALL GRABLINES ON THE LIFEFLOAT.
Condition: Unknown
Due 14 June 1990
Resolved 14 June 1990
Fire Fighting
Issued 18 May 1989
Resolved
AMEND REQUIREMENT D-3 OF 16MAY89 TO READ; WITHIN (15) DAYS HYDROSTATICALLY TEST THE (13)LB. HALON FIRE EXTINGUISHER. OBTAIN A NEW LABEL PLATE SHOWING APPROVAL FOR MARINE USE IF POSSIBLE.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Fire Fighting
Issued 16 May 1989
Resolved
WITHIN FIFTEEN (15) DAYS, HYDROSTATICALLY TEST AND RECHARGE THE TWO (2) 5LBCO2 FIRE EXTINGUISHERS.
Condition: Unknown
Due 16 May 1989
Resolved 16 May 1989
Fire Fighting
Issued 16 May 1989
Resolved
WITHIN FIFTEEN (15) DAYS REPLACE THE NON-APPROVED THIRTEEN (13) LB. HALON FIRE EXTINGUISHER.
Condition: Unknown
Due 16 May 1989
Resolved 16 May 1989
Engineering
Issued 16 May 1989
Resolved
WITHIN FIFTEEN (15) DAYS INSTALL A FLAME SCREEN ON THE SINGLE FUEL OIL TANK VENT AFT. THE SCREEN INSTALLATION IS TO COMPLY WITH 46CFR 182.20- 35 (D).
Condition: Unknown
Due 16 May 1989
Resolved 16 May 1989
Electrical
Issued 23 June 1987
Resolved
PUT COVER ON JUNCTION IN PEAK TANK.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Electrical
Issued 23 June 1987
Resolved
WIRE CONNECTIONS IN 3RD COMPARTMENT MUST BE MADE IN A JUNCTION BOX.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Construction/Loadline
Issued 23 June 1987
Resolved
STENCIL HOMEPORT ON STERN OF VESSEL.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Construction/Loadline
Issued 23 June 1987
Resolved
REPAIR FRACTURES IN DECK BULWARK AFTER DECK.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Construction/Loadline
Issued 23 June 1987
Resolved
PROVIDE GASKET ON ENGINE COVER, PORT MAIN ENGINE-LOWER SIDE
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Construction/Loadline
Issued 23 June 1987
Resolved
REPLACE LOWER SECTION OF 3 TRANSVERSE FLOOR FRAMES FROM 3RD STRINGER INBOARD IN 3RD COMPARTMENT.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Electrical
Issued 23 June 1987
Resolved
REMOVE UNUSED WIRE IN 3RD COMPARTMENT.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Construction/Loadline
Issued 23 June 1987
Resolved
INSTALL PROPER THRU-BULKHEAD PENETRATION FOR SEWER AND WIRE RUN BETWEEN 2ND& 3RD COMPARTMENTS.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Fire Fighting
Issued 23 June 1987
Resolved
INSTALL FIRE PUMP AND PROVIDE AND TEST HOSE.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Construction/Loadline
Issued 23 June 1987
Resolved
PROVIDE PORTABLE HAND/BILGE PUMP.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Construction/Loadline
Issued 23 June 1987
Resolved
REPAIR HOLE IN BULKHEAD BETWEEN 2ND & 3RD COMPARTMENTS, STBD UPPER CORNER.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Accommodation/Occupational Safety
Issued 23 June 1987
Resolved
REPAIR FRACTURES IN WATER PUMP MOUNTS 3RD COMPARTMENT.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Construction/Loadline
Issued 23 June 1987
Resolved
MAKE PERMANENT REPAIRS IN STERN COMPARTMENT IN WAY OF FRACTURES, DETERIORETED METAL AND HOLES.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Engineering
Issued 23 June 1987
Resolved
PROVIDE HANGERS FOR COOLING LINES IN ENGINE SPACE.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987
Engineering
Issued 23 June 1987
Resolved
DOUBLE CLAMP ENGINE EXHAUST HOSE CONNECTIONS.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987