Records from 2008 to 2022. Most recent: operational control imposed, 19 July 2022.
Documentation record
Registered dimensions (L × B × D)39.3 ft × 13.0 ft × 5.0 ft
Registered tonnagegross 28 / net 19
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHUMBOLDT BOAT SERVICE · ST LOUIS, MO, UNITED STATES · built 1966
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portBURNSVILLE, MN
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 18 November 2025 · expires 30 November 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it19 - Regulatory (Subpart C or D), Net Ton
28 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 12
19 July 2022
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7510973
6 June 2022
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7490774
22 November 2021
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7355436
29 October 2020
Internal Structural Exam · Drydock Exam · Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7086274
23 August 2019
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6795045
14 August 2019
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6789154
21 April 2019
Initial Certification
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6670467
26 February 2019
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6632456
13 May 2013
Administration
Administrative · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 4590154
17 May 2010
Deficiency Check · Spot Check (Safety)
Physical examination · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 3746222
14 July 2009
Annual Inspection
Physical examination · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 3535604
22 July 2008
Annual Inspection
Physical examination · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 3282447
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 19 July 2022
No resolution recorded
COI has not been obtained by the required phase in period.
Action required: 60 - Rectify deficiencies prior to movement
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 November 2021
No resolution recorded
passed 90 day inspection window
Action required: 60 - Rectify deficiencies prior to movement
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 October 2020
Resolved
2-3" of water noted in the starboard stern void. Unknown cause at this time.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2021
Resolution: Cracked rudder post plate found and welded satisfactorily.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 21 April 2019
Resolved
The B-V extinguisher for the engine room shows it was last inspected March, 2018.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 August 2019
Resolution: Extinguisher has been serviced.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 21 April 2019
Resolved
Place a 40B extinguisher near the flammable locker.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 August 2019
Resolution: fire extinguisher mounted near the locker
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 21 April 2019
Resolved
bilge alarms did not operate independently of other machinery alarms.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: bilge alarms now operate independently
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 21 April 2019
Resolved
When horn was tested, it was unable to be secured without manual shutdown.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: horn operates correctly
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 April 2019
Resolved
official number is not marked on the interior structural part of the vessel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: official number is now marked properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 21 April 2019
Resolved
port and starboard oil pressure gauges inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: gauges operable
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 26 February 2019
Resolved
Vessel does not have a valid COD.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2019
Resolution: COD has been issued.