- Built
- 2007
- Last inspected
- 28 January 2021
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 33 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 2 investigations · 2008–2010
Identity
1203577
9406233 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDE2998
911320
Flag
MEXICO
367332660 (licence lapsed)
Maury page id
psix-911320
Inspections, by type
…with no type recorded2
Years with a record
7 calendar years (2007–2021)
The 19 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.
Documentation record
Tonnage as PSIX records it198 - Regulatory (Subpart C or D), Gross Ton
498 - Convention (Subpart B), Gross Ton
134 - Regulatory (Subpart C or D), Net Ton
149 - Convention (Subpart B), Net Ton
551 - Dead Weight, Ton
498 - Convention (Subpart B), Gross Ton
134 - Regulatory (Subpart C or D), Net Ton
149 - Convention (Subpart B), Net Ton
551 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
WDE2998MMSI 367332660 · cancelled · compulsorily equipped · granted 11 January 2018, cancelled 26 September 2019
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 19
28 January 2021
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7132961
7 September 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6262109
6 March 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6099923
14 June 2012
Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4334474
24 February 2011
Cargo Tank Internal · MTSA/ISPS Verification · Internal Structural Exam · Annual Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3945955
5 March 2010
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3692488
5 March 2010
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3766581
26 February 2010
Re-Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3686616
16 December 2008
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3380623
28 October 2008
Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3353005
26 October 2008
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3353028
3 July 2008
Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3255459
16 May 2008
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3208593
21 April 2008
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3188852
18 March 2008
Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3166841
12 March 2008
Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3166802
24 January 2008
Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3135541
11 September 2007
Plan Review (Other than "T")
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3056681
21 May 2007
MARPOL Annex I Examination · Hull Examination · MTSA/ISPS Verification · Internal Structural Exam · Ballast Water Examination · Plan Review (Other than "T") · Initial Certification · Initial Construction-Excluding Oversight · Welding Related Inspections Qualification Testing · Construction Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3147032
Deficiency record · 33
Construction/Loadline › Penetrations › Weld
Issued 14 June 2012
Resolved
Make repairs to the port and stbd rudder post stringers (aft weld on stringers fractured)
Construction/Loadline › Markings › Load Line Mark
Issued 14 June 2012
Resolved
There is currently no deck line permanently affixed to each side of the vessels hull IAW 46 CFR 42.13-20 to indicate the freeboard deck. Have attending ABS surveyor verify that all LL marks are IAW the vessels LL certificate and submit report of findings to this office.
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 14 June 2012
Resolved
Provide a standard discharge connection IAW MARPOL Annex ! Reg 13, currently no SDC onboard.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 14 June 2012
Resolved
Provide hydro test reports for all f/o and l/o transfer hoses.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 14 June 2012
Resolved
Provide a CG approved copy of the vessel Automation Procedure.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 February 2011
Resolved
Make repairs to the port and stbd asft rig water tanks by welding all fractures. Provide repair proposal prio to affecting repairs.
Construction/Loadline › Hull › Keel
Issued 24 February 2011
Resolved
Make repairs to skeg by completing 2 inserts and back-gouging previous repairs and rewelding.
Construction/Loadline › Hull › Side Shell
Issued 5 March 2010
Resolved
Damage to stbd water tank approx 10" fwd of aft bulkhead, 5' from the overhead. To be repaired w/18" x 18" insert, 4 radiused corners.
Construction/Loadline › Hull › Stiffener
Issued 26 February 2010
Resolved
Gouge and re-weld two cracked welds on rudder posts prior to departure.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 26 February 2010
Resolved
Provide an annual test report for vessel's automation test procedures.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Automation Test Procedures and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110 (f).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved AC Electrical One-Line Diagram drawing sheets 1-3 and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(e).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved DC Electrical One-Line Diagram drawing sheets 1-2 and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(e).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Electrical Equipment Location drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(e).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Lighting Plan drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(e).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Propulsion Shaft, Bearings & Couplings drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Machinery Exhaust Systems drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Lube Oil & Waste System drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Compressed Air drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Bulk Dry Mud Compressor drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Rudders, Tillers and Tubes drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Liquid Mud System sheets 1-3 drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved General Arrangement drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Short Circuit & Coordination Study Sheets 1-28 and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Anchoring and Mooring Details drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Calculation of Anchoring Requirements drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Rudder Calculations drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Running Lights, Masts and Antennas drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Rudder Stops drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Fuel Tank Valve Control with Emergency Shut Down drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Liquid Mud Valve Control with Emergency Shut Down drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Through-Hull Penetrations & Shell Connections drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(d).
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008
Resolved
Provide Coast Guard approved Vents, Sounding Tubes & Overflows drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(d).
Casualty record · 2
26 October 2008Routine · role: Involved in a Marine Casualty · activity 3353028
5 March 2010Routine · role: Involved in a Marine Casualty · activity 3766581
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.