MAURY USCG vessel records Sign in
← All vessels

HAMMERHEAD

HAMMERHEAD is a 2007 offshore supply vessel. The Coast Guard has recorded 19 inspections since 2007, most recently in January 2021, along with 33 deficiencies and 2 casualty investigations between 2008 and 2010.

Records from 2007 to 2021. Most recent: inspection, 28 January 2021.

Built
2007
Last inspected
28 January 2021
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9406233 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDE2998
911320
Flag
MEXICO
367332660 (licence lapsed)
Maury page id
psix-911320

Inspections, by type

…with no type recorded2
Years with a record 7 calendar years (2007–2021)
The 19 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it198 - Regulatory (Subpart C or D), Gross Ton
498 - Convention (Subpart B), Gross Ton
134 - Regulatory (Subpart C or D), Net Ton
149 - Convention (Subpart B), Net Ton
551 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDE2998MMSI 367332660 · cancelled · compulsorily equipped · granted 11 January 2018, cancelled 26 September 2019
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 19

28 January 2021 In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7132961
7 September 2017 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6262109
6 March 2017 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6099923
14 June 2012 Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4334474
24 February 2011 Cargo Tank Internal · MTSA/ISPS Verification · Internal Structural Exam · Annual Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3945955
5 March 2010 Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3692488
5 March 2010 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3766581
26 February 2010 Re-Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3686616
16 December 2008 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3380623
28 October 2008 Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3353005
26 October 2008 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3353028
3 July 2008 Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3255459
16 May 2008 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3208593
21 April 2008 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3188852
18 March 2008 Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3166841
12 March 2008 Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3166802
24 January 2008 Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3135541
11 September 2007 Plan Review (Other than "T")
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3056681
21 May 2007 MARPOL Annex I Examination · Hull Examination · MTSA/ISPS Verification · Internal Structural Exam · Ballast Water Examination · Plan Review (Other than "T") · Initial Certification · Initial Construction-Excluding Oversight · Welding Related Inspections Qualification Testing · Construction Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3147032

Deficiency record · 33

Construction/Loadline › Penetrations › Weld
Issued 14 June 2012 Resolved
Make repairs to the port and stbd rudder post stringers (aft weld on stringers fractured)
Action required: 705 - Other - as specified
Due 14 July 2012
Resolved 27 July 2012
Resolution: Stinger welds gouged and rewelded.
Construction/Loadline › Markings › Load Line Mark
Issued 14 June 2012 Resolved
There is currently no deck line permanently affixed to each side of the vessels hull IAW 46 CFR 42.13-20 to indicate the freeboard deck. Have attending ABS surveyor verify that all LL marks are IAW the vessels LL certificate and submit report of findings to this office.
Action required: 705 - Other - as specified
Due 14 August 2012
Resolved 14 September 2012
Resolution: New deck line marked and verified by ABS surveyor, received ABS Survey Report verifing that all LL marking are correct.
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 14 June 2012 Resolved
Provide a standard discharge connection IAW MARPOL Annex ! Reg 13, currently no SDC onboard.
Action required: 705 - Other - as specified
Due 14 July 2012
Resolved 22 August 2012
Resolution: New standard discharge connection placed onboard.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 14 June 2012 Resolved
Provide hydro test reports for all f/o and l/o transfer hoses.
Action required: 705 - Other - as specified
Due 14 July 2012
Resolved 20 July 2012
Resolution: Test report received.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 14 June 2012 Resolved
Provide a CG approved copy of the vessel Automation Procedure.
Action required: 705 - Other - as specified
Due 14 July 2012
Resolved 16 July 2012
Resolution: Approved automation test procedures received.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 February 2011 Resolved
Make repairs to the port and stbd asft rig water tanks by welding all fractures. Provide repair proposal prio to affecting repairs.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 28 February 2011
Construction/Loadline › Hull › Keel
Issued 24 February 2011 Resolved
Make repairs to skeg by completing 2 inserts and back-gouging previous repairs and rewelding.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 27 February 2011
Construction/Loadline › Hull › Side Shell
Issued 5 March 2010 Resolved
Damage to stbd water tank approx 10" fwd of aft bulkhead, 5' from the overhead. To be repaired w/18" x 18" insert, 4 radiused corners.
Action required: 705 - Other - as specified
Resolved 10 March 2010
Resolution: Observed sat air test of repair.
Construction/Loadline › Hull › Stiffener
Issued 26 February 2010 Resolved
Gouge and re-weld two cracked welds on rudder posts prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 March 2010
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 26 February 2010 Resolved
Provide an annual test report for vessel's automation test procedures.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 March 2010
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Automation Test Procedures and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110 (f).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC review letter.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved AC Electrical One-Line Diagram drawing sheets 1-3 and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(e).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 19 June 2008
Resolution: Satisfied all MSC comments.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved DC Electrical One-Line Diagram drawing sheets 1-2 and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(e).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Electrical Equipment Location drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(e).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Lighting Plan drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(e).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Propulsion Shaft, Bearings & Couplings drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Machinery Exhaust Systems drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Lube Oil & Waste System drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Compressed Air drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Bulk Dry Mud Compressor drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Rudders, Tillers and Tubes drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 21 April 2008
Resolution: Received appropriate documentation from MSC stating plan had been examined with no outstanding comments.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Liquid Mud System sheets 1-3 drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved General Arrangement drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Short Circuit & Coordination Study Sheets 1-28 and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Anchoring and Mooring Details drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 21 April 2008
Resolution: Received appropriate documentation from MSC stating plan had been examined with no outstanding comments.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Calculation of Anchoring Requirements drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Rudder Calculations drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 21 April 2008
Resolution: Received appropriate documentation from MSC stating plan had been examined with no outstanding comments.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Running Lights, Masts and Antennas drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 21 April 2008
Resolution: Received appropriate documentation from MSC stating plan had been examined with no outstanding comments.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Rudder Stops drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 21 April 2008
Resolution: Received appropriate documentation from MSC stating plan had been examined with no outstanding comments.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Fuel Tank Valve Control with Emergency Shut Down drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 21 April 2008
Resolution: Received appropriate documentation from MSC stating plan had been examined with no outstanding comments.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Liquid Mud Valve Control with Emergency Shut Down drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(a).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 21 April 2008
Resolution: Received appropriate documentation from MSC stating plan had been examined with no outstanding comments.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Through-Hull Penetrations & Shell Connections drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(d).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 13 February 2008 Resolved
Provide Coast Guard approved Vents, Sounding Tubes & Overflows drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46 CFR 127.110(d).
Action required: 705 - Other - as specified
Due 20 May 2008
Resolved 16 May 2008
Resolution: Received MSC comment letter, all comments have been satisfied.

Casualty record · 2

26 October 2008Routine · role: Involved in a Marine Casualty · activity 3353028
5 March 2010Routine · role: Involved in a Marine Casualty · activity 3766581
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.