Inspection history · 18
17 June 2026
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8407151
11 June 2025
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8153098
12 April 2024
Deficiency Check · Hull Examination · COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7896167
8 November 2023
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7822144
31 May 2022
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7466307
2 June 2021
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7208826
3 June 2020
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6965282
7 November 2019
Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6854836
25 April 2019
DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6669750
13 December 2018
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6597440
11 May 2018
Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6412365
20 February 2018
Plan Review "T" Boat · In-Service Inspection · Construction Oversight
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6357946
31 January 2018
Plan Review "T" Boat
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6347431
11 August 2017
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6237797
10 August 2017
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6450414
11 May 2017
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6143713
19 August 2016
Damage Survey
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5977256
18 May 2016
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5879809
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 June 2026
No resolution recorded
46 CFR 180.70(d) - A vessel must carry one floating waterlight, unless it is limited to daytime operation, in which case no floating waterlight is required. The waterlight is inoperable. Vessel is restricted to daylight operations until light is repaired and verified by the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 June 2026
No resolution recorded
46 CFR 185.604(b) - Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name. The name on the ring buoy was no longer legible. Repair to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2026 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 June 2026
No resolution recorded
46 CFR 181.500(d) - The frame or support of each semi-portable fire extinguisher permitted by paragraph (a) of this section must be welded or otherwise permanently attached to a bulkhead or deck. The portable fire extinguisher installed at the operating station did not have a bracket. Install bracket to the satisfaction of the attending Marine Inspector.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2026 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 11 June 2025
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck.
The remote fuel shutoff valve reach rod was cracked in half and inoperable. Replace reach rod and ensure shutoff valve functions properly. 46 CFR 182.455(b)(4)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 June 2025
Resolution: Broken handle replaced, op test sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 11 June 2025
Resolved
An adult life jacket must be provided for each person carried on board a vessel.(b) In addition, a number of child size life jackets equal to at least 10% of the number of persons permitted on board must be provided. Vessel was missing 05 adult and 02 child lifejackets. Vessel is restricted to 44 total persons until proper number of adult and children lifejackets iaw COI are placed on board vessel.
46 CFR 180.71(a)(b)
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 14 June 2025
Resolution: Vsl now equipped with pfds iaw COI.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 11 June 2025
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces.
Bilge alarm in machinery compartment is not operational. Demonstrate proper operation to attending Marine Inspector. 46 CFR 182.530(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2025
Resolved 14 June 2025
Resolution: Op test sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 April 2024
Resolved
Lifejackets not on board.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 April 2024
Resolution: Lifejackets placed on boarsd when put in service in Portland, OR
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 April 2024
Resolved
Water light for Ring buoy not on board
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 April 2024
Resolution: Water light installed when placed in service in Portland, OR
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 12 April 2024
Resolved
Bilge alarms were being replaced and not installed at time of inspection.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 April 2024
Resolution: Replaced bilge alarm with new one.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 8 November 2023
Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. You must contact the cognizant OCMI to schedule an inspection at a time and place which he or she approves. No written application is required. Failed to contact OCMI for annual inspection. Submit Form CG-3752 to local OCMI for inspection. COI on-board is no longer valid and vessel is restricted from operating as a passenger vessel under 46 CFR subchapter T.
Action required: 10 - Deficiency Rectified
Resolved 8 November 2023
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 25 April 2019
Resolved
Conduct satisfactory drills while underway.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2019
Resolution: Witnessed satisfactory drills.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 25 April 2019
Resolved
Install bilge high-level alarms at operating station.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2019
Resolution: witness operation of high level bilge alarms.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 April 2019
Resolved
Prove proper operation of flammable vapor detection system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2019
Resolution: witnessed operational test
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 25 April 2019
Resolved
Wire all three propulsion engines so they shut down upon activation of the pre-engineered fire extinguishing system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2019
Resolution: witnessed operational test
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 25 April 2019
Resolved
Exhaust piping on middle engine is leaking water into the engine compartment.
Action required: 705 - Other - as specified
Due 16 May 2019
Resolved 15 May 2019
Resolution: Inspected weld repair. All sat
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 25 April 2019
Resolved
Repair three (03) cracked welds on various brackets/supports in passenger seating area.
Action required: 705 - Other - as specified
Due 16 May 2019
Resolved 10 May 2019
Resolution: examined repairs
Engineering › Gasoline Engine (propulsion) › Ventilation
Issued 11 May 2018
Resolved
KK01: Ensure exhaust blower switch is interlocked with starting switch and the ignition switch.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 May 2018
Resolved 12 May 2018
Resolution: Vessel propulsion engines now cannot be energized without first energizing powered ventilation blowers.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 11 May 2018
Resolved
Needs 5 additional adult lifejackets and 2 child lifejackets labeled with vessel name.
Action required: 705 - Other - as specified
Due 12 May 2018
Resolved 12 May 2018
Resolution: Required lifejackets have been added to vessel.
Communications › Alarms/Indicators › High Water Alarm
Issued 11 May 2018
Resolved
Ensure operation of visual high level alarm. Visual alarm at operating station inop.
Action required: 705 - Other - as specified
Due 18 May 2018
Resolved 12 May 2018
Resolution: Bilge high-water alarm and visual/audible indicator at operating station now functioning properly.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 11 May 2018
Resolved
Label fuel shut-off valve.
Action required: 705 - Other - as specified
Due 11 June 2018
Resolved 24 May 2018
Resolution: Shut-off valve now labeled.
Communications › Audible Communications › Horn/Whistle
Issued 11 May 2018
Resolved
Need horn or sound signaling device. Fixed horn inop.
Action required: 705 - Other - as specified
Due 11 June 2018
Resolved 12 May 2018
Resolution: Vessel horn now works properly.
Engineering › Gasoline Engine (propulsion) › Ventilation
Issued 11 May 2018
Resolved
Need red-warning sign indicating blowers must run prior to engine ignition.
Action required: 705 - Other - as specified
Due 11 June 2018
Resolved 24 May 2018
Resolution: Red warning sign added to operating station.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 11 May 2018
Resolved
Need 03 RPM indicators.
Action required: 705 - Other - as specified
Due 11 June 2018
Resolved 24 May 2018
Resolution: New RPM gauges have been installed and work properly.
Engineering › Steering Gear System › Linkage
Issued 11 August 2017
Resolved
AB01 - provide proof of proper operation and repairs of steering gear to the satisfaction of the attending coast guard marine inspector
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 August 2017
Resolved 11 August 2017
Resolution: witnessed proper repairs to steering linkage bracket and proper operation of steering underway. All SAT.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 11 May 2017
Resolved
Provide and keep onboard all pages of Certificate of Inspection. 46CFR176.302
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 May 2017
Resolved 12 May 2017
Engineering › Fuel Oil Service System › Hose
Issued 11 May 2017
Resolved
Replace 02 chaffed flexible fuel hoses in kind to the Satisfaction of the attending Marine Inspector. 46CFR182.720
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 May 2017
Resolved 12 May 2017
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 11 May 2017
Resolved
Provide proper markings for the stowage and quantity of child and adult size life jackets. 46CFR185.604(c)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 June 2017
Resolved 11 May 2018
Resolution: Verified that lifejacket stowage was properly marked.
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder
Issued 18 May 2016
Resolved
PROVE PROPER OPERATION OF THE VESSEL'S PORT MAIN ENGINE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2016
Resolved 19 May 2016
Resolution: WITNESSED PROPER OPERATION OF THE PORT MAIN ENGINE.
Engineering › Diesel Engine (propulsion-reduction gear) › Emergency shutdown
Issued 18 May 2016
Resolved
PROVE PROPER OPERATION OF THE VESSEL'S FIREBOY MAIN ENGINE SHUTDOWNS TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2016
Resolved 19 May 2016
Resolution: WITNESSED PROPER OPERATION OF THE FIREBOY MAIN ENGINE SHUTDOWNS AND OVERRIDE FUNCTIONS.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 18 May 2016
Resolved
INSTALL A CONDUCTOR JOINING THE METAL SECTIONS OF THE FUEL TANK FILL PIPE SEPARATED BY FLEXIBLE HOSE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 24 May 2016
Resolution: Received documentation attesting to the proper installation of a conductor joining the fuel tank fill piping that has been separated by a non-metallic hose.