MAURY USCG vessel records
← All vessels

NOAAS FERDINAND R. HASSLER (S 250)

NOAAS FERDINAND R. HASSLER (S 250) is a 2011 research vessel. The Coast Guard has recorded 67 inspections since 2016, most recently in July 2026, along with 111 deficiencies — 1 with no resolution recorded —.

Records from 2016 to 2026. Most recent: inspection, 14 July 2026.

Built
2011
Last inspected
14 July 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Research Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 14 July 2026
…with no type recorded5
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9478559
918222
Flag
UNITED STATES
Maury page id
psix-918222

Documentation record

Tonnage as PSIX records it242 - Convention (Subpart B), Net Ton
739 - Displacement, Metric Ton
809 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 67

14 July 2026 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8437966
16 March 2026 Vessel Attendance · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8327100
27 February 2026 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8317407
24 February 2026 COI Inspection · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8316391
12 November 2025 Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8267306
19 September 2025 Deficiency Check
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 8237457
27 August 2025 Administrative Inspection
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8219033
21 August 2025 Deficiency Check · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8215242
28 July 2025 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8197612
1 May 2025 Deficiency Check
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 8130527
17 December 2024 Deficiency Check
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 8048833
11 September 2024 Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7978217
1 July 2024 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7946499
26 June 2024 In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7942849
13 June 2024 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7933841
8 June 2024 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7931633
17 April 2024 In-Service Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7896941
16 April 2024 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7899401
13 March 2024 In-Service Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7878300
20 October 2023 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7811649
16 October 2023 Drydock Exam · In-Service Inspection · Internal Structural Exam · Deficiency Check · Inclining Experiment
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7809240
10 October 2023 Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7806026
9 August 2023 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7764825
3 July 2023 Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7730635
19 May 2023 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7694568
20 March 2023 Examination of Repairs · Annual Inspection · Administrative Inspection · Periodic Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7659581
26 January 2023 Administrative Inspection
Administrative · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 7627432
19 July 2022 Damage Survey
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7510754
17 July 2022 Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7511257
18 March 2022 Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7414149
9 March 2022 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7408551
28 February 2022 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7401466
29 October 2021 Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7342050
8 October 2021 Deficiency Check · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7329338
17 September 2021 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7314668
13 May 2021 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7195976
19 February 2021 Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7143978
13 November 2020 Hull Examination · Deficiency Check · Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7094505
6 October 2020 Damage Survey
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 7073073
10 August 2020 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 7024741
6 April 2020 In-Service Inspection
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6936086
25 February 2020 Deficiency Check
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6915450
19 February 2020 Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6911388
25 November 2019 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6863647
13 September 2019 Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6813344
15 July 2019 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6758536
7 February 2019 Inclining Experiment · Drydock Exam · Periodic Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6621779
6 November 2018 Internal Structural Exam · In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6574701
2 November 2018 Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6573286
1 November 2018 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6574721
10 October 2018 In-Service Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6559789
1 August 2018 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6497553
16 May 2018 In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6420270
23 April 2018 Administrative Inspection
Administrative · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6397453
23 March 2018 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6378959
22 January 2018 In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6341485
2 October 2017 Administrative Inspection
Administrative · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6279772
14 July 2017 In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6213857
20 March 2017 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6108259
13 February 2017 In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6087672
12 February 2017 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6088711
12 January 2017 Examination of Repairs
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6070032
15 August 2016 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5981014
9 May 2016 Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5906399
20 April 2016 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 5858628
14 March 2016 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5834245
9 March 2016 Internal Structural Exam · COI Inspection · In-Service Inspection · Deficiency Check · Drydock Exam · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 5830119

Deficiency record · 111

03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 30 March 2026 Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the assigning authority.The arrangements shall ensure that the tightness can be maintained in any sea conditions. Emergency escape hatch aft of the starboard generator room has openings where light can be seen going through. 46 CFR 42.15-30(c)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 April 2026
Resolved 13 April 2026
Resolution: MI's verified visually that hatch was adjusted to be made weathertight.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2026 Resolved
The termination of each cable must be sealed to prevent the entrance of electrolyte by spray or creepage. Dead end cable located in the starboard side shaft alley space with no seal on the termination. 46 CFR 111.15-20(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 April 2026
Resolved 13 April 2026
Resolution: Cable removed.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 30 March 2026 Resolved
Each general emergency alarm signal must be an electrically-operated bell, klaxon, or other warning device capable of producing a signal or tone distinct from any other audible signal on the vessel. 02 alarms located in the port fire pump and port steering spaces were hanging from the overhead. 46 CFR 113.25-12(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2026
Resolved 13 April 2026
Resolution: Both alarms in port fire pump and steering spaces have been re-attached.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 March 2026 Resolved
The approved buoyant work vests shall be stowed separately from the regular stowage of approved life preservers. The locations for the stowage of work vests shall be such as not to be easily confused with that for approved life preservers. Recreational approved inflatable work vests are stored in the same storage container as commercial approved life jackets for rescue boat operations. 46 CFR 196.34-15(a)(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2026
Resolved 13 April 2026
Resolution: Workvests relocated and stored away from type approved life preservers.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 30 March 2026 Resolved
Bulkheads of the B Class shall be constructed with approved incombustible materials and made intact from deck to deck and to shell or other boundaries. They shall be so constructed that, if subjected to the standard fire test, they would be capable of preventing the passage of flame for one-half hour. 02 doors leading into the mess deck did not properly self close. Doors were fixed prior to completion of the inspection. 46 CFR 190.07-5(c)
Action required: 10 - Deficiency Rectified
Resolved 30 March 2026
Resolution: Corrected during inspection
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 February 2026 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work except as modified by § 189.45-1. Vessel replaced Fixed Fire Detection System with out Marine Safety Center review/approval.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2026
Resolved 30 March 2026
Resolution: Fixed fire detection system has been reviewed and approved by ABS. Plans are currently with MSC and being reviewed for approval.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 January 2026 No resolution recorded
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Marine Vessel Rules (incorporated by reference, see § 58.03-1), except as otherwise provided by this subchapter. Vessels port and stbd propellers were found to have excessive erosion and cavitation. Vessel is required to provide report every 6 months from diver on condition of propellers until new ABS approved props are installed at next dry dock (2029).
Action required: 705 - Other - as specified
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 July 2025 Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. The fire main isolation valve on the starboard side main deck forward of the DC locker is stuck in the open position. 46CFR196.15-60(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2025
Resolved 21 August 2025
Resolution: Cutout valve was freed up, and demonstrated open/closing.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 28 July 2025 Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Previous revisions of the Fire Control Plan indicate fire detection in Laundry Space 1-38-2 is a smoke detector, and when tested this detector did not alarm on the fire alarm control panel located on the navigation bridge. 46CFR196.15-60(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2025
Resolved 21 August 2025
Resolution: Galley has a heat sensor located in the space, the FSP was updated to show a heat sensore above the galley prep table.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 28 July 2025 Resolved
Vessels assigned a load line shall have the deck line and the load line marks permanently marked or embossed as required by Subchapter E (Load Lines) of this chapter. Found port side hull deck line location is not marked. 46CFR196.40-15(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2025
Resolved 21 August 2025
Resolution: A deck reference line was painted in contrasting color onto the hull.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 July 2025 Resolved
The general construction of the vessel shall be such as to minimize fire hazards. Found the following self-closing doors fire doors that will not close on their own nor latch; Navigation Bridge 01-10-2, and the door leading to the Galley 1-13-2. 46CFR190.07-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2025
Resolved 21 August 2025
Resolution: Both fire doors were tested in presence of MI, and closed/latched properly
11 - Life Saving Appliances › N/A - No Subsystem › Stowage of rescue boats
Issued 28 July 2025 Resolved
Rescue boats must be stowed to be ready for launching in not more than 5 minutes. The vessel crew attempted to prove proper operation of rescue boat davit, winch and fall but was unable to due to the activation of the limit switch. 46CFR199.140(a)
Action required: 10 - Deficiency Rectified
Due 28 July 2025
Resolved 28 July 2025
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 11 September 2024 Resolved
Each vessel must carry not less than 12 rocket parachute flares approved under approval series 160.136. The crew could not locate the 12 rocket parachute flares during the annual inspection. 46 CFR 195.06-1 46 CFR 199.60(c)
Action required: 17 - Rectify deficiencies prior to departure
Due 11 September 2024
Resolved 20 September 2024
Resolution: New flares onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Emergency equipment for 2-way comm.
Issued 11 September 2024 Resolved
Radio lifesaving appliance installations and arrangements must meet the requirements of 47 CFR part 80. At least three two-way VHF radiotelephone apparatus must be provided on every passenger ship and on every cargo ship of 500 tons gross tonnage and upwards. Batteries must be replaced if the transmitter has been used in an emergency situation. One of the battery tabs was broken off and indicated it was used on one of the portable survival craft radios. 46 CFR 195.06-1 46 CFR 199.60(a) 47 CFR 80.1095(a)(c)
Action required: 17 - Rectify deficiencies prior to departure
Due 11 September 2024
Resolved 27 September 2024
Resolution: New radios and batteries onboard.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 September 2024 Resolved
Portable fire extinguishers and their stations must be numbered in accordance with § 196.37-15 of this subchapter. Numerous portable fire extinguisher stations were not numbered (i.e. laundry room, workshop, computer room, etc.). 46 CFR 193.50-10(e)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2024
Resolved 30 September 2024
Resolution: Fire extinguisher locations numbered.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 September 2024 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work. Vessel completed a switch board change and plans that were submitted for approval have had multiple changes. Submit 1 line diagram & Switch board plans to Marine Safety Center or submit to ABS under NVIC 10-92 for review & final approval by cognizant OCMI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2024
Resolved 19 September 2025
Resolution: Approval completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 September 2024 Resolved
Grounded neutral and high-impedance grounded neutral alternating current systems must have a suitably sensitive ground detection system which indicates current in the ground connection, is able to withstand the maximum available fault current without damage, and provides continuous indication of current status to ground. A provision must be included to compare indications under fault conditions with those under normal conditions. Vessel is indicating ground in 208V switchboard and is not the right type of ground indicating device. 446CFR111.05-27
Action required: 17 - Rectify deficiencies prior to departure
Due 11 September 2024
Resolved 30 September 2024
Resolution: GFA Vessel provided tech report and checked circuits. Amount of resistance measured had been lowered and steady at 2 Amps GFA reading & appeared to be inherent to the overall system resistance/impedance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 September 2024 Resolved
Protection of passengers, crew, other persons and the vessel from electrical hazards. Ground indicated on Main Bus A traced down to Galley Equipment, secure circuit or rectify. 46CFR111.01(a)(2)
Action required: 17 - Rectify deficiencies prior to departure
Due 11 September 2024
Resolved 20 September 2024
Resolution: Circuit secured to the oven.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 September 2024 Resolved
Protection of passengers, crew, other persons and the vessel from electrical hazards. Ground indicated on Main Bus B. 46CFR111.01(a)(2)
Action required: 17 - Rectify deficiencies prior to departure
Due 11 September 2024
Resolved 30 September 2024
Resolution: No grounds were indicated while on Generator Power. Prevous indications shown were on shore power and different 3 phase ground dectection system was added to switchboard and was not indicating grounds.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 September 2024 Resolved
In addition to emergency power sources required under part 112, each vessel must have 2 electrical generation sources. STBD Generator would automatically shut down when turning on and coming up to speed.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 September 2024
Resolved 20 September 2024
Resolution: Tested STBD Generator onload. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 September 2024 Resolved
The material, design, construction, workmanship, and arrangement of Main Propulsion Machinery should meet ABS Steel Vessel Rules. RPM indicators for main propulsion shafts were inop. 46CFR58.05-1
Action required: 17 - Rectify deficiencies prior to departure
Due 11 September 2024
Resolved 20 September 2024
Resolution: Tested and RPM displays now functioning.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 11 September 2024 Resolved
Periodic Safety Test Procedures must demonstrate the proper operation of the primary and alternate controls, alarms, power sources and safety controls. Loss of Lube for both MDEs could not be demonstrated in accordance with PSTPs. 46CFR61.40-6
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2024
Resolved 30 September 2024
Resolution: Revision 7 updated and resubmitted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 September 2024 Resolved
Each enclosure of an overcurrent device must meet sections 240-30 and 240-33 of the NFPA NEC 2002. Panel LP203 in general workshop is being held close by duct tape. 46CCR111.50-7
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2024
Resolved 20 September 2024
Resolution: Latch installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 July 2024 Resolved
Your vessel must undergo an annual inspection within 3 months before or after anniversary date. Vessel is past window for inspection. 46CFR189.27
Action required: 17 - Rectify deficiencies prior to departure
Due 27 August 2024
Resolved 11 September 2024
Resolution: Vessel Completed Annual Inspection
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 July 2024 Resolved
Tests must verify that automated vital systems are designed, constructed, and operate in accordance with all applicable requirements of part 62 of this subchapter. DVTPs & QFAs Rev C that was “Examined” by Marine Safety Center (MSC) had numerous variances & inconsistencies with how switchboards were configured. Revise DVTPs to accurately reflect installation & resubmit to MSC. Demonstrate testing after review to satisfaction of cognizant OCMI. 46CFR61.40-3(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2024
Resolved 23 June 2025
Resolution: Received MSC approval letter for Rev E of the DVTP.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 July 2024 Resolved
Automatic transfer to required backup or redundant systems or power sources must be alarmed in the machinery spaces. 24VDC when primary power is lost to the DEIF PPM300 is not installed with alarm as required (Tests 1.1 & 1.2 of DVTPs Rev C.) 46 CFR 62.25-20(d)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2024
Resolved 17 December 2024
Resolution: Witnessed satisfactory test of power source transfer and alarm.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 10 October 2023 Resolved
The main steering gear and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed, which must be demonstrated to the satisfaction of the cognizant Officer in Charge, Marine Inspection. Vessels port side rudder is inoperable. 46CFR58.25-10(b)(1)
Action required: 17 - Rectify deficiencies prior to departure
Due 10 October 2023
Resolved 20 October 2023
Resolution: Witnessed steering gear test
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 3 July 2023 Resolved
The main steering gear and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed, which must be demonstrated to the satisfaction of the cognizant Officer in Charge, Marine Inspection. Vessels port side rudder is inoperable. Provide a technician report attesting to repairs. 46CFR58.25-10(b)(1)
Action required: 17 - Rectify deficiencies prior to departure
Due 3 July 2023
Resolved 13 July 2023
Resolution: Vessel sent tech report stating operational status of equipment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 March 2023 Resolved
Rudder was impinging on the stops during max turn testing.
Action required: 10 - Deficiency Rectified
Due 28 April 2023
Resolved 28 April 2023
Resolution: Rudder angle sending units adjusted on the spot to prevent impinging the stops.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 July 2022 Resolved
Operating generators must provide a continuous and uninterrupted source of power for the ship's service load under normal operational conditions. Vessel reported STBD generator secured itself due to a high jacketwater temperature resulting from a previous failure to the automation system. Vessel must provide tech report providing proof/automation systems are in proper working condition.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 1 August 2022
Resolution: 705- Seven days. Reviewed tech report and preliminary report from ABS surveyor; all sat. Accepted both documents as objective evidence to clear the deficiency.
04 - Emergency Systems › N/A - No Subsystem › Emergency towing arrangements and procedures
Issued 9 March 2022 Resolved
Vessels in ocean service shall be fitted with anchors, chains, and hawsers in general agreement with American Bureau of Shipping standards. Vessel's starboard anchor windlass is malfunctioning. 46 CFR 195.07-5 (a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 March 2022
Resolution: Satisfactory test of the stbd anchor windlass & obtained tech report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 29 October 2021 Resolved
Vessel reported failure of both port and starboard generators. Each self-propelled vessel must have at least two electric generating sources. Repair or replace to satisfaction of attending CGMI and provide report from servicing representative. 46 CFR 111.10-3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2021
Resolution: Bay diesel repaired SSDGs
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 8 October 2021 Resolved
Found a four foot by one foot piece of insulation missing from overhead above starboard number one generator. Replace insulation IAW approved plans. 46 CFR 189.55-1
Action required: 705 - Other - as specified
Due 20 November 2021
Resolved 31 January 2022
Resolution: Insullation reinstalled about both SSDG's
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 February 2021 Resolved
Fire / heat damage suspected IVO steering control module. Prove operation of steering system.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2021
Resolution: steering check was conducted during COI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 February 2021 Resolved
09 portable fire extinguishers consumed in fire fighting. Provide proof of replaced extinguishers IAW COI and requirements.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2021
Resolution: extinguishers checked during COI
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 19 February 2021 Resolved
Fire occured within ventilation system in chart room. Clean / repair and make ready for inspection.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 April 2021
Resolution: Verified ductwork was re-installed and space has been restored. Vessel opted not to re-install duct heater.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 13 November 2020 Resolved
FCC Bridge to Bridge and Safety Radio Certificate were expired.
Condition: Invalid
Action required: 15 - Rectify deficiencies by next port
Due 17 March 2021
Resolved 14 April 2021
Resolution: Verified certs were onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 November 2020 Resolved
Vessel could not demonstrate proper operation of Reverse Power Relays. Vessel has until 25May21 to demonstrate proper operation of RPLs. Vessel has implimented admin controls to prevent a reverse power situation (not operating in parrellel).
Action required: 705 - Other - as specified
Due 17 March 2021
Resolved 14 April 2021
Resolution: Reverse power relays were demonstrated to CG and ABS; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 13 November 2020 Resolved
Port Generator could not pass load test dur to overheating.
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Due 17 March 2021
Resolved 1 April 2021
Resolution: Vessel conducted a successfull load bank test after replacing turbo. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 November 2020 Resolved
Bilge Pump was not installed in STBD Engine room.
Action required: 60 - Rectify deficiencies prior to movement
Due 17 March 2021
Resolved 19 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 November 2020 Resolved
Blank was missing in circuit breaker panel LP205.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 1 April 2021
Resolution: Vessel installed a blank.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 November 2020 Resolved
MCT from CO2 Space to Garbage Room was damaged and had mixed materials.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 1 April 2021
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 November 2020 Resolved
Two Roxblock installations in Port and Starboard workshops were missing blocks & being repaired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 1 April 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 November 2020 Resolved
3 sets of deadend wires in the Garbage Room overhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 1 April 2021
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 13 November 2020 Resolved
Vessel could not complete PSTPs and was having mulitple sensors on Main Propulsion Engines inop.
Action required: 60 - Rectify deficiencies prior to movement
Due 17 March 2021
Resolved 19 March 2021
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 13 November 2020 Resolved
Lagging was missing on exhausts in both engine rooms.
Action required: 60 - Rectify deficiencies prior to movement
Due 17 March 2021
Resolved 19 March 2021
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 13 November 2020 Resolved
STBD Steering pump was leaking excessive hydaulic fluid.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 19 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 November 2020 Resolved
Vessel reported port generator not operating within OEM specifications (hunting +/- 10 rpm's when at low load). Repair to the satisfaction of CG. 46CFR111.10-3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 April 2021
Resolution: Vessel demonstrated operation of port generator. Cause of hunting was determined to be lube oil thickening causing the HEUI fuel pump to operate at erratic fuel pressure.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 October 2020 Resolved
In addition to the emergency power sources required under part 112 of this chapter, each self-propelled vessel must have at least two electric generating sources. On 20SEP2020, while underway, the FERDINAND R. HASSLER experienced a casualty of the #1 (STBD) ship's service diesel generator. No notice was made to the USCG as required by 46 CFR 4.05-1. The vessel's RO, ABS, was also not notified. Prove proper operation of #1 ship's service diesel generator to the satisfaction of RO and USCG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 April 2021
Resolution: #1SSDG was replaced in kind and tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 October 2020 Resolved
All [Diesel engine]installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. On 20SEP2020, while underway, the FERDINAND R. HASSLER experienced a casualty of the #1 (STBD) Main Diesel propulsion engine (MDE). No notice was made to the USCG as required by 46 CFR 4.05-1. The vessel's RO, ABS, was also not notified. Prove proper operation of #1 MDE to the satisfaction of RO and USCG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 April 2021
Resolution: Shutdown condition could not be replicated while the vessel was dockside for 1 month following DDX, including sea trials. Techs could not find a cause.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 11 August 2020 Resolved
Wastage on port interior hull/ aft compt. Crew claims the spot was "weeping" Perform NDT to the satisfaction of CG to determine hull integrity.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 August 2020
Resolution: NDT in presence of CG and ABS SAT.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 August 2020 Resolved
Numerous emergency lights are not working, Repair as needed and prepare ship for E-lighting test.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 August 2020
Resolution: E-lighting test SAT
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 11 August 2020 Resolved
Water tight door indicator for ER at frame 12 is not working. Repair as needed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 August 2020
Resolution: Test of indicators SAT
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 11 August 2020 Resolved
Provide appropriate line throwing gun for vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 August 2020
Resolution: Line throwing appliance provided.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 11 August 2020 Resolved
EDG room and port side engine room main air supply vents are not fully closing. Repair as necessary.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 August 2020
Resolution: Closures tested SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 August 2020 Resolved
Bridge wing life buoys are 2.5 kg and are not suitable to deploy attached smoke canisters. Provide proper 4 kg ring buoys.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2020
Resolved 19 August 2020
Resolution: Proper buoys provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 August 2020 Resolved
Numerous distribution panels have multiple label cards in them. Determine which cards are correct and remove the old ones.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2020
Resolved 19 August 2020
Resolution: Labeling corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 August 2020 Resolved
Main engines needs double hose clamps on cooling line off of heat exchanger.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2020
Resolved 19 August 2020
Resolution: Double hose clamps provided.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 11 August 2020 Resolved
Red general alarm light in STBD engine room is broke and hanging from ceiling by a wire, Repair/replace as necessary.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2020
Resolved 19 August 2020
Resolution: Light replaced.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 11 August 2020 Resolved
Label manual vent pulls on EDG vent.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2020
Resolved 19 August 2020
Resolution: Labeling complete.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 August 2020 Resolved
Loose electrical wire in bosun locker. Secure/remove as necessary.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2020
Resolved 19 August 2020
Resolution: Wire secured.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 11 August 2020 Resolved
Provide spare lifeboat radio batteries as needed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2020
Resolved 19 August 2020
Resolution: Batteries provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 October 2019 Resolved
Ship is to proceed to dry-dock for repairs to the port and starboard rudders as outlined in International Ship Repair & Marine Services Condition Report dated 24 Sep 19. Ship is permitted to operate following the parameters and limitations outlined in NOAA Memo dated 30 Sep 19 until the vessel can be dry-docked.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 December 2019
Resolved 18 January 2020
Resolution: Witnessed dockside steering test all appear satisfactory....vessel completed sea trials as reported by Port Engineer [name withheld]
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 September 2019 Resolved
The port and starboard rudders "jump" up to 1/8" of an inch in way of the upper bearing. Prior to getting underway for next port, submit to the OCMI for review and approval: a) detailed report identifying the issues causing the rudders to "jump", and b) proposal for addressing and correcting the identified issues. Getting underway for testing of the rudders locally is approved.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 October 2019
Resolved 1 October 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 September 2019 Resolved
Prove proper operation of the port and starboard aft capatans.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2019
Resolved 24 February 2020
Resolution: Parts are onboard...however the rudder repairs are in way of the capstans. NOAA asked for extension till rudder repairs are completed and tested satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 June 2019 Resolved
Dual voltage systems requires the neutral to be grounded in alternating current systems, provision must be included to compare indications under fault conditions with those under normal conditions. Install ground detection in the 208/120 panels. By next annual exam but no later than 23 August 2020
Action required: 705 - Other - as specified
Due 23 August 2020
Resolved 13 August 2020
Resolution: Cleared during 2020 annual; see Activity 7024741 for details.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 June 2019 Resolved
Non-conducting deck coverings such as mats or grating suitable for the specific switchboard voltage must be installed for personnel protection at the front and rear of the switchboard and must be sufficient for the operating space. Install non-conducting mat/grating in front of switchboard in space adjacent to XO's office.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2019
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 June 2019 Resolved
The general construction of the vessel shall be such as to minimize fire hazards. Make cable penetration in starboard workshop fwd bulkhead fire tight.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 June 2019 Resolved
Non-conducting deck coverings such as mats or grating suitable for the specific switchboard voltage must be installed for personnel protection at the front and rear of the switchboard and must be sufficient for the operating space. Install non-conducting mat/grating in front of switchboard in space adjacent to XO's office.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2019
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 June 2019 Resolved
The general construction of the vessel shall be such as to minimize fire hazards. Make cable penetration in starboard workshop fwd bulkhead fire tight.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2019
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 31 May 2019 Resolved
The vessel/NTVRP has no proof that there is a agreement with a salvage and marine firefighting resource provider. This written consent must be available to the Coast Guard for inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 31 May 2019 Resolved
he vessel/NTVRP doesn't have the geographic-specific contact for COTP New York. The NTVRP is approved for COTP New York however there is no information. The VRP must cover all geographic areas of the United States in which the vessel intends to handle, store, or transport oil, including port areas and offshore transit areas.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 31 May 2019 Resolved
The vessels AIS and GPS is not able to broadcast. At all times owner, master, or person in charge of each vessel underway shall ensure that that the required equipment listed is operational.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 May 2019 Resolved
Through-out the vessel various electrical ground detectors show faults/grounds. Remove all grounds to ensure that vessel is safe from electrical hazards.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 May 2019 Resolved
Remove pails and various supply in emergency generator space. The generator space is not considered a supply space and must be accessible.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 31 May 2019 Resolved
Various Fire Control Plans in containers have different revisions and shall all be up to the same revision
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 June 2019
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 31 May 2019 Resolved
Vent dampers closures to have the indication as to if the vent/damper is open or closed. [name withheld] the handle if the direction to pull handle to close vents/dampers.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 June 2019
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 31 May 2019 Resolved
Several of the manual vent closures are not labeled, ensure that all vents are label to provide guidance as to which covers are for which space.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 June 2019
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 31 May 2019 Resolved
Crew was not able to provide the inventory of oil discharge equipment. Ensure that the required inventory of discharge removal equipment for vessels less than 400 feet in length is on-board.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 May 2019 Resolved
Remove the spare battery kit form the aft CO2 space. The controls shall be easily accessible and not be blocked and ready for immediate use.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 31 May 2019 Resolved
On the aft open deck of the 01 deck there what appears to be the typical yellow plastic drums of oil spill kits. When opened there are 55 gallon drums stored inside. If the containers are to be used for the storage of 55 gallon drums or any thing else other that oil spill equipment label the plastic drums with whats inside, as this could slow down a oil spill response.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 31 May 2019 Resolved
Several of the emergency escape hatches up to open decks have gaskets that are crushed and twisted. these hatches are exposed to the weather must be watertight. Repair gaskets, in addition clean out all coaming of all debris and trash
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 31 May 2019 Resolved
Fire doors leading from chart room to bridge and from galley to mess deck need to be adjusted as they will not close on their own, doors need to be adjusted to make them a "A" class boundary
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 31 May 2019 Resolved
Main fire pump was not ready for immediate use as the Chief Engineer had to goto his stateroom to reset something.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 May 2019 Resolved
There are many emergency lights that are missing "E" to identify what light are on emergency power, mark E-lights.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 June 2019
08 - Alarms › N/A - No Subsystem › General alarm
Issued 31 May 2019 Resolved
General alarm bell in galley not identified by "GENERAL ALARM—WHEN BELL RINGS GO TO YOUR STATION"
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 June 2019
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 31 May 2019 Resolved
All distress signal required by 46 CFR 199.60 (c). All lifesaving shall be in working order and ready for immediate use.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 31 May 2019 Resolved
Sewage pump not working and needs to be replaced/repaired. This could limit the holding capacity of the system, if tank cannot be pumped down.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 May 2019 Resolved
Vessel port generator drops off line when put on a load. This has been identified in February 2019 and technician was on-board and witnessed the drop. Vessel must demonstrate proper operation of all generators under all conditions prior to departing berth underway and demonstrate that the installation can maintain the necessary services for safety under normal and emergency conditions.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 November 2018 Resolved
Vessel is 5 months overdue for an internal structural exam. Vessel is to complete exam twice in five years with no more than three years between. Prior dates: 29May13 & 31May16. Due 31May18. Vessel to complete during next drydocking period.
Action required: 705 - Other - as specified
Resolved 31 May 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 November 2018 Resolved
Vessel is 5 months overdue for an internal structural exam. Vessel is to complete exam twice in five years with no more than three years between. Prior dates: 29May13 & 31May16. Due 31May18.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 November 2018
Resolution: Completed ISE in Norfolk, VA on 6Nov2018.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 November 2018 Resolved
Vessel is 5 months overdue for a dry dock exam. Vessel is to complete exam twice in five years with no more than three years between. Prior dates: 29May13 & 31May16. Due 31May18. Vessel shall submit a drydock extension to CVC through Sector Hampton Roads.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 November 2018
Resolved 31 May 2019
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 10 October 2018 Resolved
Rescue Boat davit will not properly slew to launch boat.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 October 2018
Resolution: Davit serviced by tech rep and repairs approved by ABS.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 10 October 2018 Resolved
Rescue boat release hook approval is expired.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 October 2018
Resolution: Replaced hook with approved hook to the satisfaction of ABS.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 1 August 2018 Resolved
Emergency generator not operational. Prove operational test of E-gen to attending CG Inspector to include all safety shut-downs.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 August 2018
Resolved 9 August 2018
Resolution: Attended vessel and cleared above deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 August 2018 Resolved
Main propulsion engines not available for testing. Prove operational test of both main propulsion engines to the satisfaction of attendiong marine inspector to include all safety shut-downs.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 August 2018
Resolved 9 August 2018
Resolution: Attended vessel and cleared above deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 1 August 2018 Resolved
Port ship generator prime mover inoperable. Prove proper operational test of generator after repair to the satisfaction of attending CG marine inspector to include all safety shut-downs.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 August 2018
Resolved 9 August 2018
Resolution: Attended vessel and cleared above deficiency.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 1 August 2018 Resolved
Numerous bulkhead cable ways found in engineering spaces with missing packing or improperly installed stuffing blocks.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 August 2018
Resolved 9 August 2018
Resolution: Attended vessel and cleared above deficiency.
Lifesaving › Launching Appliances › Winch
Issued 23 March 2018 Resolved
Repairs were done to rescue boat davit OEM rep performed empty boat weight test. Conduct 110% weight test of davit to the satisfaction of attending CG inspector.
Action required: 705 - Other - as specified
Due 23 May 2018
Resolved 9 August 2018
Resolution: Cleared and tested during dockside availabiltiy.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 22 January 2018 Resolved
Vessel ground detection inoperable
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 February 2018
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 22 January 2018 Resolved
Provide proper grounding for all ships service power, lighting and distribution systems.
Action required: 705 - Other - as specified
Resolved 9 August 2018
Resolution: Cleared after verifying during dockside availability.
Electrical › Electric Generation Source (service) › Generator
Issued 17 February 2017 Resolved
Vessel load sharing module is not functioning properly
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 22 January 2018
Resolution: Recieved email stating that load sharing module was replaced.
Electrical › Electric Generation Source (service) › Generator
Issued 13 February 2017 Resolved
Generator is unable to take a load
Condition: Invalid
Due 13 February 2017
Resolved 17 February 2017
Resolution: vessel by passed load sharing module
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 12 January 2017 Resolved
Vessels engineering alarm system and port MDE gauge panel inoperative.
Action required: 705 - Other - as specified
Resolved 1 February 2017
Engineering › Bilge Water Management System › Not Operational
Issued 1 April 2016 Resolved
Prove proper operation of port and stbd bilge pumping arrangements.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2016
Navigation › Piloting/Steering › Gryo Compass Repeater
Issued 1 April 2016 Resolved
Port bridge wing repeater inoperable
Action required: 705 - Other - as specified
Resolved 18 April 2016
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 1 April 2016 Resolved
Stbd side engine room vent louvres are inoperable
Action required: 705 - Other - as specified
Due 4 April 2016
Resolved 4 April 2016
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 1 April 2016 Resolved
Float light battery expired
Action required: 705 - Other - as specified
Resolved 4 April 2016
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 1 April 2016 Resolved
Fire door to stbd side machine shop does not fully close.
Action required: 705 - Other - as specified
Resolved 6 April 2016
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 1 April 2016 Resolved
Expired medications
Action required: 705 - Other - as specified
Resolved 4 April 2016
Electrical › Electric Generation Source (emergency) › Generator
Issued 9 March 2016 Resolved
Prove proper operation of emergency generator.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2016

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.