Records from 2007 to 2021. Most recent: inspection, 29 January 2021.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 14
29 January 2021
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7132904
6 June 2019
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6711520
26 July 2018
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6491076
23 March 2018
COI Inspection · Drydock Exam
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6377417
26 April 2017
Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6133615
21 April 2016
Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 5868999
26 June 2012
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 4357024
6 February 2012
Inclining Experiment · In-Service Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 4242184
1 December 2011
Administrative Inspection · Simplified Stability Test
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 4204346
1 December 2011
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 4248833
8 August 2011
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 4109351
13 May 2009
COI Inspection
Physical examination · Marine Safety Detachment Ft. Smith · USCG Heartland District (CGD-H) · Activity 3474680
1 April 2008
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3174521
11 June 2007
COI Inspection · Simplified Stability Test · Initial Certification
Physical examination · Marine Safety Detachment Ft. Smith · USCG Heartland District (CGD-H) · Activity 3048389
Lifesaving › Lifebuoys › Approval
Issued 26 June 2012
Resolved
Provide an approved CG ring life buoy.
Condition: Invalid
Action required: 705 - Other - as specified
Due 10 July 2012
Resolved 10 July 2012
Resolution: Cleared.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 26 June 2012
Resolved
Provide proper approved fire ext bracket.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 July 2012
Resolved 17 July 2012
Resolution: Cleared.
Documentation › Certificates/Documents › Stability Letter
Issued 1 December 2011
Resolved
Submitted CG-835 due to the dead line for submittal of the AAWPP certification of compliance the following vessels maximum persons allowed will be reduced to comply with the new 185lb AAWPP in accordance with CG 543 Policy Letter 11-03: Max person allowed 21.
Condition: Invalid
Action required: 705 - Other - as specified
Due 23 March 2012
Resolved 15 March 2012
Resolution: Vessel conducted incline test and issued new stability letter by USCG MSC.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 8 August 2011
Resolved
Install automatic engine and vent shutdowns IAW applicable regulations on a pre-engineered fixed fire fighting system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 October 2011
Resolved 27 September 2011
Resolution: Cleared.
Documentation › Certificates/Documents › Certificate of Number (state)
Issued 8 August 2011
Resolved
Provide state registration numbers.
Condition: Invalid
Action required: 705 - Other - as specified
Due 23 March 2012
Resolved 23 March 2012
Documentation › Markings/Placards › Warning Signs
Issued 8 August 2011
Resolved
[name withheld] Fuel shutoffs with proper size and visibility.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 September 2011
Resolved 27 September 2011
Resolution: Cleared.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 13 May 2009
Resolved
Freeboard markings needs to be visible from operating station
Condition: Unknown
Due 20 May 2009
Resolved 18 June 2009
Resolution: CORRECTED
Engineering › Bilge Water Management System › Piping
Issued 13 May 2009
Resolved
Bilge pump discharge pipe not properly secure.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2009
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 13 May 2009
Resolved
All fire extinguishers are in need of service.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 June 2009
Resolution: CORRECTED
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 13 May 2009
Resolved
Missing light.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 May 2009
Resolved 18 June 2009
Resolution: CORRECTED
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 13 May 2009
Resolved
Children lifejacket stowed location not appropriately marked as 46 CFR 180.78 (a) (5)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 June 2009
Resolution: CORRECTED
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 13 May 2009
Resolved
Name of the vessel must be permanetly marked on all lifejackets
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 June 2009
Resolution: CORRECTED
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 13 May 2009
Resolved
ER instructions not posted IAW 46 CFR 185.510 (a)
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2009
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 13 May 2009
Resolved
Bilges needs to be clean of debris and excessive oil.
Due 20 May 2009
Resolved 18 June 2009
Resolution: CORRECTED
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 13 May 2009
Resolved
Vapor detection system not working properly. Audible alarm not working.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 June 2009
Resolution: CORRECTED
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 April 2008
Resolved
Replace stern navigation light lens.
Due 30 April 2008
Resolved 15 April 2008
Engineering › Bilge Water Management System › Hose
Issued 11 June 2007
Resolved
Higgins pump discharge hose- not double clamped
Condition: Improper Installation
Due 5 September 2007
Resolved 14 March 2008
Electrical › Electrical Distribution System (service) › Junction Box
Issued 11 June 2007
Resolved
Wire inside JBox- at the Stern steering compartment, port side, not properly secure.
Condition: Improper Installation
Due 5 September 2007
Resolved 14 March 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 11 June 2007
Resolved
braket not properly installed.
Condition: Improper Installation
Due 5 July 2007
Resolved 1 August 2007
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 11 June 2007
Resolved
Missing 01 Adult lifejacket
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 April 2008
Engineering › Shafting/Propeller Arrangements › Flange/Thrust Collar Fillet
Issued 11 June 2007
Resolved
During the steering test, it was noted that the vessel was leaking from the carrier bearing flange.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 March 2008
Fire Fighting › Remote Fuel Shutoff › General
Issued 11 June 2007
Resolved
Aft fuel shut off valve not labeled.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 1 April 2008
Engineering › Bilge Water Management System › Pump
Issued 11 June 2007
Resolved
bilge pump contro swich incorrectly labeled.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 1 April 2008