MAURY USCG vessel records Sign in
← All vessels

MSC VENEZUELA

MSC VENEZUELA is a 1996 freight ship. The Coast Guard has recorded 16 inspections since 2007, most recently in July 2009, along with 12 deficiencies and 4 operational controls.

Records from 2007 to 2009. Most recent: inspection, 13 July 2009.

Built
1996
Last inspected
13 July 2009
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9103697 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
925574
Flag
UNITED KINGDOM
—
Maury page id
psix-925574

Inspections, by type

…with no type recorded6
Years with a record 3 calendar years (2007–2009)
The 16 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 17 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it28073 - Simplified, Net Ton
51931 - Simplified, Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 16

13 July 2009 Ballast Water Examination · Random ISPS/MTSA/PSC
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3533080
29 April 2009 Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3463821
28 March 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3441667
27 March 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3441726
7 February 2009 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3413793
7 February 2009 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3413923
3 February 2009 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3411596
5 December 2008 PII Safety Exam · MARPOL Annex I Examination · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3372210
3 December 2008 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3373429
18 August 2008 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3302010
19 May 2008 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3210719
18 May 2008 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3209801
18 May 2008 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3210801
31 March 2008 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3174424
21 November 2007 Random ISPS/MTSA/PSC
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3102574
29 September 2007 MARPOL Annex V Examination · Ballast Water Examination · PII Safety Exam · MARPOL Annex I Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3069035

Deficiency record · 12

Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 13 July 2009 Resolved
Main machinery space has multiple fuel oil hazards (forward port side parts cleaning station). Written to satisfaction of USCG.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 August 2009
Fire Fighting › Means of Escape › Doorways
Issued 13 July 2009 Resolved
Vessel does not have ready means of escape form forecastle. Bolt and wing nut on forecastle door rusted and inoperable.
Action required: 705 - Other - as specified
Due 13 July 2020
Resolved 13 July 2009
Resolution: deficiency cleared
Fire Fighting › Ventilation Systems › Ducts
Issued 13 July 2009 Resolved
Vessel's automatic fire damper is not operational. Damper held open by wooden block.
Action required: 705 - Other - as specified
Due 13 July 2009
Resolved 13 July 2009
Resolution: Deficiency cleared.
Fire Fighting › Fire Hoses › Material
Issued 13 July 2009 Resolved
Fire hose not readily available for use, due to missing spanner wrench tool. Written to satisfaction of USCG.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 August 2009
Resolution: The fire station on the portside aft outside of bay 65 was equipped with a sparer wrench and extras were also provide in the vessels fire control room.
Engineering › Thrusters › Motor
Issued 13 July 2009 Resolved
Vessel bow thruster is inoperable. Master unable to provide documentation form company or class as to when it will be repaired. Written to satisfaction of USCG.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 August 2009
Resolution: Vessels Master presented the inspectors a letter from it operating company stating the bow thruster is not operational and the parts are on board to over haul the equipment. The company also stated that this item is not under its class certificates.
Engineering › Steam Boiler (auxiliary/waste heat) › Tube Header
Issued 27 March 2009 Resolved
Vessel had power irregularity due to damaged exhaust gas boiler tubes.
Action required: 705 - Other - as specified
Due 27 March 2009
Resolved 31 March 2009
Resolution: Received class report rectifying deficiency.
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 7 February 2009 Resolved
Steam Failure Alarm not functioning, must monitor until replaced and witnessed by Class Surveyor.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2009
Resolved 29 April 2009
Resolution: Recieved Class report attesting to the rapair of the Boiler Alarm.
Navigation › Collision/Grounding Avoidance › Radar
Issued 3 February 2009 Resolved
Received a letter of deviation from the vessel for the S-band radar being inoperable.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 February 2009
Resolution: Received tech report attesting to the proper repairs made and the full operation of the S-band radar.
Lifesaving › Lifeboat › Propulsion Starting System
Issued 5 December 2008 Resolved
The power starting system for the port lifeboat engine is inoperative. Only Manuel starting system is operative.
Condition: Unknown
Action required: 705 - Other - as specified
Due 4 January 2009
Resolved 7 February 2009
Resolution: Received Class report attesting to the repairs to the Port Lifeboat starting system
Engineering › Steam System (auxiliary) › Piping
Issued 5 December 2008 Resolved
Main boiler flame failure alarm is not operational. Manual supervision is required until repaired.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2009
Resolved 7 February 2009
Resolution: Condition of Class
Engineering › Compressed Air System (start air) › Valve
Issued 19 May 2008 Resolved
A defective limit switch on the starting air control system caused a power failure of the main engine.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 May 2008
Resolved 19 May 2008
Resolution: Valve was found and replaced by a new one from shipboard spare. Main Engine has now been tested several times ahead and astern and found in satisfactory working order.
Engineering › Bilge Water Management System › Not Operational
Issued 21 November 2007 Resolved
The vessel's bilge alarm would not work.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 November 2007
Resolved 21 November 2007
Resolution: PSCO''''s observed the alarm working properly after the vessel''''s engineering department worked on it for approximately 45 minutes.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.