Records from 2007 to 2026. Most recent: inspection, 5 March 2026.
Inspection history · 23
5 March 2026
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8320694
29 December 2025
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8282777
26 June 2025
Annual Inspection · ACP Annual Oversight · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8168395
30 August 2024
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7992459
12 July 2024
COI Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7943598
22 September 2023
Annual Inspection · ACP Annual Oversight · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7787536
31 August 2022
Annual Inspection · MTSA Verification · ACP Annual Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7547364
27 December 2021
ACP Annual Oversight · Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7372700
15 November 2021
Administrative Inspection · In-Service Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7351963
24 February 2021
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7145654
6 October 2020
Annual Inspection · Administrative Inspection · ACP Annual Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7072164
24 June 2019
ACP COI Oversight · MTSA/ISPS Verification · Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6724338
11 June 2018
MTSA/ISPS Verification · ACP Annual Oversight · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6441549
5 December 2017
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6339697
5 July 2017
ACP Annual Oversight · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6198800
14 September 2016
ACP Annual Oversight · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6000867
16 September 2015
ACP Annual Oversight · Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5720212
27 August 2014
Construction Oversight · Administrative Inspection · Examination of Repairs · ACP Handover Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4966910
24 September 2011
MTSA/ISPS Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Activities Europe · Activity 4050650
15 December 2010
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3911403
29 September 2010
Annual Inspection · DAPI Audit · MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 3864182
15 April 2009
Plan Review (Other than "T")
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3454568
26 November 2007
Welding Related Inspections Qualification Testing · Administrative Inspection · Construction Oversight · MARPOL Annex I Examination · Initial Certification · MTSA/ISPS Verification · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3104297
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 June 2025
Resolved
The crew shall have the necessary knowledge and skills to handle fire emergency cases.
Upon conducting the fire drill on-board, the vessel’s crew demonstrated a lack of familiarity with firefighting equipment and procedures, presenting a potential risk to both crew safety and the vessel. A follow-up fire drill was conducted; however, the crew failed to properly muster and left one crew member unaccounted for during the simulated CO2 discharge in the engine room.
74 SOLAS Cons 2004
II-2 Reg 15.1
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 July 2025
Resolution: Crew successfully performed fire drill with a galley fire in presence of Coast Guard inspectors
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 June 2025
Resolved
The fire integrity of the divisions shall be maintained at openings and penetrations.
The A-60 fire door leading to the electrical room was compromised, allowing free communication across the fire boundary.
74 SOLAS Cons 2004
II-2 Reg 9.1.3
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 July 2025
Resolution: Door was repaired to reinstate integrity for A60 boundry standards
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 26 June 2025
Resolved
General arrangement plans shall be permanently exhibited for the guidance of the ship’s officers, showing clearly for each deck fire extinguishing appliances.
The galley fire blanket was removed from the fire control plan without any documented authorization or approval by a recognized organization or the flag state.
Once corrected, resubmit the fire control plan for approval.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 January 2026
Resolution: Fire Fighting Equipment Plan (Drawing No. 235-555-01) has been approved as per ABS Engineering review letter WO0487640 Dated 30
December 2025. Fire Fighting Equipment Plan has been posted onboard, verified, and considered satisfactory.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 26 June 2025
Resolved
The bunker delivery note shall be accompanied by a representative sample of the fuel oil delivered taking into account guidelines developed by the Organization.* The sample is to be sealed and signed by the supplier’s representative and the master or officer in charge of the bunker operation on completion of bunkering operations and retained under the ship’s control until the fuel oil is substantially consumed, but in any case for a period of not less than 12 months from the time of delivery. Vessel was missing two of the last three fuel oil samples to accompany the associated bunker delivery notes and oil record book entry. Additionally, vessel is to obtain samples for the current load of fuel oil upon next bunkering and retain all fuel oil samples onboard in accordance with regulations which will be confirmed at next annual ACP annual oversight inspection by USCG.
MARPOL 73/78, Annex VI reg. 18-8.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2025
Resolution: Bunker samples were found and put back on the vessel along with accurate dates as oily record book noted
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 26 June 2025
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. The marking must enable passengers and crew to identify the routes of escape and readily identify the escape exits. Vessel had conflicting photoluminescent strip arrows which were not in accordance with the lifesaving plan’s identified escape routes from accommodation spaces.
74 SOLAS Cons 2004
II-2 Reg. 13-3.2.5.1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2025
Resolved 1 July 2025
Resolution: Stickers were corrected with appropriate markings
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 June 2025
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. The door to the nitrogen release cylinder servicing the emergency generator room was broken and could not be opened until forced by the crew, resulting in it becoming more damaged. Vessel to repair/replace cabinet to ensure that it is in good working order and readily available for immediate use.
74 SOLAS Cons 2004
II-2 Reg 14-2.1.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2025
Resolved 1 July 2025
Resolution: Cabinet is replaced with appropriate door
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 26 June 2025
Resolved
Where penetrations of watertight bulkheads and internal decks are necessary for access; arrangements are to be made to maintain the watertight integrity. Vessel had one (1) incorrectly aligned class 1 quick-acting watertight door. Vessel corrected alignment on the spot to the satisfaction of attending marine inspectors.
74 SOLAS Cons 2004
II-1 Reg 13-1.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 26 June 2025
Resolution: Vessel corrected alignment on the spot to the satisfaction of attending marine inspectors.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 27 December 2021
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 10 January 2022
Resolved 31 December 2021
Resolution: Replacement Chief Engineer was provided with valid license.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 December 2021
Resolved
Lagging on bow thruster exhaust was loose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2022
Resolved 29 December 2021
Resolution: ABS Cleared.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 27 December 2021
Resolved
Electrical outlets in galley were grease covered.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2022
Resolved 29 December 2021
Resolution: ABS Cleared
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 December 2021
Resolved
shoretie cable box in engine room was missing bushing to make water tight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2022
Resolved 29 December 2021
Resolution: ABS Cleared
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 27 December 2021
Resolved
Fire alarm pull station was found broken and electrical taped together.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2022
Resolved 29 December 2021
Resolution: ABS Cleared
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 December 2021
Resolved
fuel line for e-generator was found dry rotted and cracked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2022
Resolved 29 December 2021
Resolution: ABS Cleared
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 27 December 2021
Resolved
Due to unlicensed crew unable to conduct drills. Conduct emergency drills
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2022
Resolved 31 December 2021
Resolution: Coast Guard attended and observed fire and abandoned ship drills.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 24 June 2019
Resolved
Renewal surveys incomplete, RO unable to issue vessel certificates and documents due to incomplete FMEA trials.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 25 June 2019
Resolved 25 June 2019
Resolution: All Certificates and Documents were issued by RO.
Construction/Loadline › Structures › Superstructure
Issued 25 September 2011
Resolved
Vessel's bridge wings do not extend to provide view of ship's side in accordance with SOLAS Reg V/22.1.6. Beemar has submitted drawings approved by MSC to add bridge wings. Ref MSC ltr C1-1201050 and referenced plan. Ensure approved plans onsite, verify installation does not impact float-free arrangements of liferafts. Due at drydock.
Condition: Improper Installation
Due 2 July 2012
Resolved 2 July 2012
Resolution: Cleared during annual exam.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 25 September 2011
Resolved
Amend fire control plan to identify fire protection ratings of decks within 30 days in accordance with SOLAS (2004 Consolidated ) Reg II-2/15.2.4. Received emailed FCP as amended---left def open to verify at next attendance.
Condition: Improper Installation
Due 2 October 2012
Resolved 2 July 2012
Resolution: Cleared during 2012 Annual Exam.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 25 September 2011
Resolved
Make wiring penetrations in bridge deck to electrical lockers one deck below compliant to deck/blkhead fire protection rating, materials must be CG approved for A-class penetration in locations identified, under main console fwd and in locker amidships. Due at drydocking, approved plans details should be available onsite, ref MSC ltr C1-1200699.
Condition: Improper Installation
Due 2 July 2012
Resolved 2 July 2012
Resolution: Cleared during 2012 Annual Exam.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 25 September 2011
Resolved
Fwd bulkhead of CO2 space is identified as A-15 on plans, and should be A-60, verify A-60 construction by next credit drydock.
Condition: Improper Installation
Due 2 July 2012
Resolved 2 July 2012
Resolution: Cleared during 2012 Annual Exam.
Documentation › Logs/Records › Logbook (official)
Issued 25 September 2011
Resolved
Maintain USCG Official Log book, vessel is on a foreign voyage until it returns to US. Submit as necessary (once log is completed, or periodically) to USCG Activities Europe Will be verified at next inspections.
Due 2 October 2012
Resolved 2 July 2012
Resolution: Cleared during 2012 Annual Exam.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 September 2011
Resolved
Automation testing plan uses software 'simulation' vice testing of sensors. Provide test procedures to OCMI (ACTEUR) for approval that do not rely on simulation within 60 days. Extended def, new procedures submitted to MSC.
Condition: Improper/Lack of Maintenance
Due 6 May 2012
Resolved 2 July 2012
Resolution: Cleared during 2012 Annual Exam.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 September 2011
Resolved
Test emergency generator in accordance with 46 CFR 131.525(b), run under load "for at least two hours, at least once each month" To be verified at subsequent inspections.
Due 2 October 2012
Resolved 2 July 2012
Resolution: Cleared during 2012 Annual Exam.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 25 September 2011
Resolved
Conduct all overdue maintenance for launching appliance in accordance with manufacturer's instructions within 14 days, and implement davit maintenance per sfaety management system. 10/7/2011: Log of overdue maintenance received. Left deficiency open to be verified at next attendance.
Condition: Improper/Lack of Maintenance
Due 2 October 2012
Resolved 2 July 2012
Resolution: Cleared during 2012 Annual Exam.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 September 2011
Resolved
Weigh all cylinders for fixed CO2 system within 14 days. Annual servicing used liquid level measurement only (invalid).
Condition: Improper/Lack of Maintenance
Due 9 October 2011
Resolved 26 September 2011
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 29 September 2010
Resolved
Provide IAPP Technical files for SSDG's and bow thrusters. Provide EIAPP certificates along with Engines book of engine parameters and parts list for the same.
Due 29 October 2010
Resolved 18 October 2010
Resolution: Item reported cleared via E-mail dated 18Oct10 from [name withheld] providing objective documentation.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 September 2010
Resolved
Provide MSC Automation Test Procedure (ATP) approval letter and stamped copy of verified ATP booklet by Morgan City OCMI iaw 46CFR 130.410.
Due 29 October 2010
Resolved 10 October 2010
Resolution: Received email dated 10 Oct 10 from [name withheld], Port Captain, with photo copy stamped by Morgan City OCMI.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 29 September 2010
Resolved
Provide servicing report for the fixed fire fighting system including testing of the time delays, (including weighing cylinders), and portable extinguishers.
Due 29 October 2010
Resolved 8 October 2010
Resolution: Received servicing report via email from [name withheld], Port Engineer, on 8 Oct 10.
Navigation › Piloting/Steering › Notices to Navigation
Issued 29 September 2010
Resolved
Provide IAMSAR manual IAW 04 Cons. V reg. 20.
Due 29 October 2010
Resolved 2 July 2012
Resolution: Cleared annual 2012.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 29 September 2010
Resolved
Provide Index for power panels IAW IEEE std 45. (ampacity)
Due 29 October 2010
Resolved 19 October 2010
Resolution: Received statement that vessel has provided Indexes for power panels IAW IEEE std 45 via email from [name withheld], Port Engineer, on 19 Oct 10.
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 29 September 2010
Resolved
Provide storm rails in accommodation spaces. IAW 46CFR 127.320
Due 29 October 2010
Resolved 19 October 2010
Resolution: Received statement and photographic evidence of rail placement via email from [name withheld], Port Engineer, on 19 Oct 10.
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 29 September 2010
Resolved
Provide emergency lighting at the port and stbd embarkations stations.
Due 29 October 2010
Resolved 2 July 2012
Resolution: Cleared during 2012 Annual Exam.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 29 September 2010
Resolved
Provide a non tank vessel response plan.
Due 29 October 2010
Resolved 19 October 2010
Resolution: Issued in error.
Fire Fighting › Combustible Materials › Linings
Issued 29 September 2010
Resolved
Paint locker must be made of steel or wholly lined with steel. IAW 46CFR 130.210
Due 29 October 2010
Resolved 8 October 2010
Resolution: Received statement and photographic evidence removal of the paint locker via email from [name withheld], Port Engineer, on 08 Oct 10.
Fire Fighting › Structural Fire Protection - General › Cooking Area
Issued 29 September 2010
Resolved
Remove portable deep fat fryer from galley IAW 04 Cons chapter II-2/10.6.4
Due 29 October 2010
Resolved 19 October 2010
Resolution: Received statement from the master, [name withheld], about removal of the deep fat fryer via email on 19 Oct 10.