Records from 2007 to 2018. Most recent: inspection, 25 June 2018.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 6
25 June 2018
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6450147
16 April 2016
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5855442
14 October 2015
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5742864
5 October 2015
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5735505
10 September 2011
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4133931
16 October 2007
ISPS II Exam · PII Safety Exam · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3081224
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 June 2018
Resolved
1410-Propulsion main engine- The purpose of this regulation is to prevent ignition of combustible materials or flammable liquids. For this purpose means shall be provided to control leaks or flammable liquids. PSCO observed teh MDE #5 cylinder fuel injector leaking excessively causing a fire hazard. SOLAS 74a(2004 Cons) II-2/4.1.1
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 June 2018
Resolution: Received NKK class report stating Fuel injector was replaced and no leaks.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 25 June 2018
Resolved
0735- Personal equipment - fire fighting- Ships shall carry at least two fire-fighters outfits. PSCO observed that 01 of the 02 fire fighter outfit where damaged. SOLAS 74a (2004 Cons) II-2/10.10.2.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 June 2018
Resolution: Received a Class Report from NKK stating the ship received new firemans outfit.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 25 June 2018
Resolved
9900- Other not clearly hazards - The access is by means of an airlock with the door of the machinery space being of "a-60" class standard and the other door being at least steel, both reasonably gas tight. PSCO observed oor on steering gear room had a hole. SOLAS 74a (2004 Cons) II-2/10.2.2.3.2.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 June 2018
Resolution: Received class report from NKK stating that the door had a steel patch welded and restoring it to original condition.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 June 2018
Resolved
1470-Insulation wetted through (0il)-The following fire protection system shal be kept in good working order. STructural fire protection, including fire resistant divisions. PSCO observed the structural fire protection for escape trunk in engine room workshop was soaked in oil. Crew was doing maintaince of injectors in the corner. SOLAS 74a (2004 Cons) II-2/14.2.1.1.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2018
Resolved 27 June 2018
Resolution: Received class report from NKK stating it was thoroughly cleaned and the above mentioned area was replaced where necessary.
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 5 October 2015
Resolved
0735- Personal equipment - Fire-fighter's outfits shall comply with the Fire Safety Systems Code. Personal equipment shall consist of protective clothing of material to protect the skin from the heat radiating from the fire and from burns and scalding by steam. Outter surface shall be water resistant. Fireman outfits had holes in them. 74 SOLAS (09 cons.) II-2/10.1 & FSS Code 2.1.1.1
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 5 October 2015
Resolved 7 October 2015
Resolution: Delivery receipt of 2 sets of fire-fighter outfits were received.
Engineering › Steam System (auxiliary) › Piping Drain
Issued 5 October 2015
Resolved
2050- Operations of machinery- Means shall be provided for draining every steam pipe in which dangerous water hammer action might otherwise occur. Steam return line from the fuel oil tank had multiple soft patches. 74 SOLAS (09 cons.) II-2/33.2
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 5 October 2015
Resolved 16 April 2016
Resolution: PSC NOLA received a class report from NKK satisfying the requirement.
Documentation › Logs/Records › Oil Record Book
Issued 10 September 2011
Resolved
2199 Master and crew not familiar with essential shipboard procedures relating to the prevention of air pollution recordkeeping for ships. Chief engineer is not following part 3 requirements of oil record book relating to prevention of air pollution from ships. Marpol Annex VI Ch. 2 Reg 10(1)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 August 2013
Resolution: Received class report from NKK satisfying requirement.