Records from 2016 to 2025. Most recent: inspection, 2 May 2025.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 19
2 May 2025
Deficiency Check · Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8127582
11 March 2025
Administrative Inspection · Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8092114
5 March 2025
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8091593
23 April 2024
Annual Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7900401
21 September 2023
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7796256
24 July 2023
MARPOL Annex VI Survey · Annual Inspection · MARPOL Annex I Examination · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7751292
28 November 2022
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7597781
7 June 2022
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7465757
27 May 2022
Internal Structural Exam · Hull Examination · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7460371
5 August 2019
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6773947
7 February 2019
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6621681
8 January 2019
Annual Inspection · MTSA/ISPS Verification · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6607546
18 April 2018
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6395650
2 March 2018
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6364863
4 December 2017
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6317406
21 November 2017
Administrative Inspection · Hull Examination · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6310589
19 April 2017
In-Service Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6128481
23 January 2017
Administrative Inspection · Periodic Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6074259
6 July 2016
In-Service Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5931634
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 May 2025
Resolved
Each hull penetration for a non-integral keel cooler installation must be made through a cofferdam or at a seachest and must be provided with isolation valves fitted as close to the sea inlet as possible. Keel cooler valve handles missing.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2025
Resolution: Vessel rep provided photo documentation of newly replaced valves.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 2 May 2025
Resolved
Piping subject to internal head pressure from oil in the tank must be fitted with positive shutoff valves located at the tank. Port side emergency fuel shut-off valves inoperable.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 May 2025
Resolution: Emergency fuel shut-off's fixed and witnessed operation of it.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 May 2025
Resolved
Self-closing fires doors of the same fire integrity standards shall be fitted in the closure. Self-closing doors did not self-close completely.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2025
Resolution: Door adjusted and witnessed self-closing.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 May 2025
Resolved
Each panelboard must have a noncombustible enclosure that meets §§ 111.01-7 and 111.01-9. Engine room distribution panel had faulty closing device.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2025
Resolution: Item fixed, witnessed proper operation of locking mechanism.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 May 2025
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Marine Vessel Rules. Stbd main tailshaft packing allowing excess water ingress.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2025
Resolution: Shaft packing adjusted and verified no water ingress.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 May 2025
Resolved
Piping systems used where the fluid temperature exceeds 150 °F must be suitably insulated as necessary to preclude injury to personnel. Gap in lagging exposed hot surface of exhaust.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2025
Resolution: Gap fully and appropriately covered with lagging.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 2 May 2025
Resolved
Each master of a vessel shall ensure that the tests and inspections, of fire-extinguishing equipment, described by paragraph (b) of this section are performed—(1) Every 12 months. Portable fire-extinguisher in port engine room had lapsed inspection, last inspection conducted in 2022.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2025
Resolution: Fire-extinguisher serviced by attending service provider. Verified new tag.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 2 May 2025
Resolved
Initial inspection. The initial inspection of lifesaving appliances and arrangements for certification includes a demonstration of—. Davit had weighted pulley replaced, davit needs weight test prior to usage.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 May 2025
Resolution: Pictures and load test results provided to Marine Inspector for verification.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 2 May 2025
Resolved
Emergency instructions. Illustrations and instructions in English and any other appropriate language, as determined by the OCMI, must be conspicuously displayed at each muster station and in spaces where offshore workers are carried, to inform offshore workers of—The essential actions they must take in an emergency; The method of donning lifejackets.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2025
Resolution: Instructions for donning lifejackets and launching liferaft posted at muster station.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 May 2025
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Marine Vessel Rules. Stbd main engine over speed shutdown inoperable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2025
Resolution: Potentiometer replaced, overspeed alarm and engine shutdown verified by Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 May 2025
Resolved
Each hull penetration for a non-integral keel cooler installation must be made through a cofferdam or at a seachest and must be provided with isolation valves fitted as close to the sea inlet as possible. Port engine room generator had overhead cooling water valves with missing handles.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 May 2025
Resolution: Vessel rep provided photo documentation of newly replaced valves.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 2 May 2025
Resolved
A fixed fire detection and fire alarm system and a sample extraction smoke detection system required in this regulation and other regulations in this part shall be of an approved type and comply with the Fire Safety Systems Code. Port engine room smoke detector oversized to bracket and only holding on by one screw.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2025
Resolution: Smoke detector properly installed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 July 2023
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Vessel's CO2 system had 3 of 5 hose connections to the CO2 bottles that were loose and able to be turned by hand. Marine Safety Solutions inspected and certified the vessel's fire system on 19MAY2023. 74SOLAS(09) II-2/14.2.1
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 July 2023
Resolution: Vessel had Maritime Safety Solutions verify the loose connections and properly tighten the connections.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 24 July 2023
Resolved
External high-pressure fuel delivery lines between the high-pressure fuel pump and fuel injectors shall be be protected with a jacketed piping system. Engines did not have proper SOLAS tape on junction between the fuel pump and the fuel injectors. 74SOLAS(09)II-1/2.2.5.2
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 July 2023
Resolution: Vessel applied SOLAS fire tape to all oil hose connections.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 24 July 2023
Resolved
The emergency source of electrical power shall be capable of supplying simultaneous at the following services for the periods specified hereinafter: 18 hrs. Vessel was not able to prove that the E-Gen has sufficient fuel to run 18 hrs. Vessel had to manually sound the tank and had 2'9" in a 3'11" fuel tank. 74SOLAS(09)II-1/43.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 July 2023
Resolution: Vessel calculated and marked required 18hr fuel line and will be ensuring fuel tank is topped off.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 24 July 2023
Resolved
All access openings in bulheads shall be fitted with doors of steel...so that the whole structre is of equivalent strength to the unpierced bulkheads. Vessel had gasket spacers placed into the doors that would allow airflow and/or light, not properly seal and is not a good marine practice. ILLC 66 Reg 12
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 July 2023
Resolution: Vessel replaced all door gaskets.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 8 January 2019
Resolved
Rescue boat davit was not ready for immediate use due to maintenance being performed. 46 CFR 131.540
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 January 2019
Resolved
Emergency generator inoperable. 46 CFR 112.05-5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2019
Operations/Management › Cargo Transfer/Lightering › Person in Charge Presence/Supervision
Issued 18 April 2018
Resolved
Vessel was found to be using cranes to pull on objects that are not free of obstruction causing an expectation of creating a sudden accleration on the crane. This is against 22.2.3.c of API RP 2D.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 May 2018
Resolved 5 August 2019
Fire Fighting › International Shore Connection › Not on Board
Issued 4 December 2017
Resolved
Provide International shore connection IAW Fireplan
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 December 2017
Resolved 6 December 2017
Resolution: Attended vessel and verified International Shore Connection was onboard.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 4 December 2017
Resolved
Conduct and log tests and inspections IAW 46 CFR 131.560, 131.565, 131.570, 131.575. Vessel is currently only logging monthly checks.
Action required: 705 - Other - as specified
Due 4 December 2018
Resolved 8 January 2019
Engineering › Diesel Engine (propulsion-electric) › Injector (fuel injection)
Issued 4 December 2017
Resolved
Provide Proper operation of port generator to satisfaction of class surveyor.
Action required: 705 - Other - as specified
Due 11 December 2017
Resolved 4 December 2017
Resolution: Injector on Cylinder #6 on the port engine room was replaced to the satisfaction of attending ABS surveyor.
Lifesaving › Lifebuoys › Approval
Issued 4 December 2017
Resolved
Provide bridge buoy for stbd bridge
Action required: 705 - Other - as specified
Due 11 December 2017
Resolved 6 December 2017
Resolution: Attended vessel and verified a "Bridge Buoy" was in place in the stbd bridge bracket.
Lifesaving › Lifebuoys › Serviceable
Issued 4 December 2017
Resolved
Provide lifebuoys at stbd aft station (Plug cracked)
Action required: 705 - Other - as specified
Due 11 December 2017
Resolved 4 December 2017
Resolution: Corrected using spare.