Records from 1996 to 1997. Most recent: operational control imposed, 14 February 1997.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Documentation
Issued 3 December 1996
Resolved
Provide a licensed mate prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Documentation
Issued 3 December 1996
Resolved
Install "discharge of oil prohibited" placard in engine room prior to return to U.S.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 3 December 1996
Resolved
Secure batteries in engine room and remove screwdrivers wedged into the connectors prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Unknown
Issued 3 December 1996
Resolved
Remove cement patch in fwd cargo hold aft prt side and make aft cargo hold available for inspection. Vsl is not to load ANY cargo until CG has examined the two cargo holds to clear this def. If any cargo in hold have it removed.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 3 December 1996
Resolved
Protect forepeak water hose in fwd cargo hold from being damaged by cargo (either protective guard or hard pipe) and install a valve at the water tank bulkhead prior to return to U.S.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 3 December 1996
Resolved
Remove cargo from fwd cargo hold to make hull plate accessible for CG examination prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Unknown
Issued 3 December 1996
Resolved
Remove cargo stored in stbd passageway prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Unknown
Issued 3 December 1996
Resolved
Remove cargo stored in aft steering space prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Navigation
Issued 3 December 1996
Resolved
Prove proper operation of main steering, can only go approx 5 degrees to port and full stbd. Prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Construction/Loadline
Issued 3 December 1996
Resolved
Install draft marks on bow and stern both sides prior to return to U.S.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 3 December 1996
Resolved
Provide 6 red hand flares and 6 orange smoke distress signals or 12 combination signals prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Documentation
Issued 3 December 1996
Resolved
Provide a waste management plan and a garbage disposal log prior to return to U.S.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 3 December 1996
Resolved
Provide fuel tank vents w/ goosenect and 30x30 mesh flame screens prior to return to U.S.. Vent goosenecks were cut off and capped and are fwd port/stbd sides.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 3 December 1996
Resolved
Properly install weak link/painter on liferaft and provide lights/whistles/vsl name on all life preservers (total of 5) prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Fire Fighting
Issued 3 December 1996
Resolved
Install fire extinguisher in engine room and provide one other for a total of three (one existing extinguisher is empty) prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Documentation
Issued 3 December 1996
Resolved
Provide a copy of vsl crew list, crew licenses, ship's registry and drydockreport prior to departure.
Condition: Unknown
Due 3 December 1996
Resolved 3 December 1996
Engineering
Issued 3 December 1996
Resolved
Remove rubber fuel hose from tanks and install adequate hard pipe in way offuel manifold in fwd area of engine room. prior to return U.S.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 3 December 1996
Resolved
Remove dead end wires in eng room and secure all loose/dangling cables prior to return to U.S.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 3 December 1996
Resolved
Make lube oil tank usable and remove portable 5 gallon oil bucket from engine room prior to return U.S.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 3 December 1996
Resolved
Install rotating machinery guards on alternator pulley in engine room priorto return to U.S.
Condition: Unknown
Due 3 December 1996
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past