Records from 2016 to 2025. Most recent: inspection, 4 July 2025.
Inspection history · 13
4 July 2025
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8175031
9 June 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8155999
21 May 2025
COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8139777
25 April 2024
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7901329
24 April 2024
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7901001
24 August 2023
COC-CHEM & TVE Renew · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7775460
14 July 2022
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7499055
31 May 2022
VRP Review
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7469573
4 June 2021
PSC B · COC-CHEM & TVE Annual
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7215451
11 July 2020
PSC B · COC-CHEM & TVE Renew
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7001010
18 June 2019
COC-CHEM & TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6704552
2 May 2018
ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Renew
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6399755
15 April 2016
ISPS II Exam · COC-CHEM & TVE Annual · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5854705
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 27 May 2025
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD.
PSCO OBSERVED CARGO PUMP CONTROL PANEL IN CCR INOPERABLE. CREW WAS OPERATING PUMPS MANUALLY.
74 SOLAS (20)/I- 11(a)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 May 2025
Resolution: Recieved class and technician report attesting to repairs to cargo pumping system
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 May 2025
Resolved
THE INERT GAS SYSTEM IN 5.5.3.1 SHALL BE DESIGNED, CONSTRUCTED, AND TESTED IN ACCORDANCE WITH THE FIRE SAFETY SYSTEM CODE.
A GAS REGULATING VALVE SHALL BE FITTED TO THE INERT GAS MAIN. THIS VALVE SHALL BE AUTOMATICALLY CONTROLLED TO CLOSE AS REQUIRED IN PARAGRAPH 2.2.2.2.
PSCO OBSERVED GAS REGULATING VALVE CONTROLLER DETACHED FROM VALVE STEM. CREW DISASSEMBLED ON 29APR2025 AND DIDN'T REPORT TO CHIEF ENGINEER.
74 SOLAS(04) II-2/4.5.5.3.2
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 May 2025
Resolution: Recieved class report attesting to repairs. Witnessed satisfactory testing of IGG
01 - Certificates & Documentation › 012 - Crew Certificates › Endorsement by flagstate
Issued 21 May 2025
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 May 2025
Resolution: Crew was able to produce a valid Flag state endorsement prior to PSC team departing.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 May 2025
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD.
PSCO OBSERVED CARGO PUMP CONTROL PANEL IN CCR INOPERABLE. CREW WAS OPERATING PUMPS MANUALLY.
74 SOLAS (20)/I- 11(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 May 2025
Resolution: Reissued as a code 40ac and restricted vessel COC from discharging until def is cleared
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 21 May 2025
Resolved
THE PURPOSE OF THIS REGULATION IS TO PROVIDE MEANS OF ESCAPE SO THAT THE PERSONS ON BOARD CAN SAFELY AND SWIFTLY ESCAPE.
PSCO OBSERVED INOPERABLE LATCHING ARRANGEMENT ON EMERGENCY ESCAPE CONNECTING STEERING GEAR ROOM AND ENGINE ROOM PREVENTING IT FROM CLOSING. FITTER ON BOARD FIXED ARRANGEMENT, AND PSCO OBSERVED THE DOOR OPERATING CORRECTLY.
74 SOLAS (04)/II-2 13.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 May 2025
Resolution: Crew fixed the door latching mechanism prior to PSC team's departure.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 21 May 2025
Resolved
IN MEETING THESE REQUIREMENTS THE COMPANY SHOULD ENSURE
.2 ANY NON CONFORMITY IS REPORTED, WITH POSSIBLE CAUSE IF KNOWN.
.3 APPROPRIATE CORRECTIVE ACTION IS TAKEN
THE TECHNICAL AND OPERATIONAL NATURE OF DEFICIENCIES PROVIDE OBJECTIVE EVIDENCE OF A FAILURE, OR LACK OF EFFECTIVENESS OF THE IMPLEMENTATION OF THE ISM CODE.
AN INTERNAL AUDIT BY THE COMPANY WITH A CORRESPONDING REPORT OF FINDINGS SATISFACTORY TO THE OCMI MUST BE SUBMITTED WITHIN 90 DAYS.
74SOLAS (20) IX/13.1
ISM CODE 10.2
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 4 July 2025
Resolution: VESSEL SENT SUPPORTING DOCUMENTS TO CLEAR DEFS.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 June 2019
Resolved
SUFFICIENT FOAM CONCENTRATE SHALL BE SUPPLIED TO ENSURE AT LEAST 30 MIN OF FOAM GENERATION WHEN USING THE HIGHEST OF THE SOLUTION RATES STIPULATED IN 11.3.5.1, 11.3.5.2, AND 11.3.5.3.
DURING EXAMINATION OF THE VESSELS FOAM TANK, PSCO DISCOVERED FOAM CONCENTRATE LEAKING FROM THE SIGHT GAUGE WITH THE CURRENT QUANTITY READING 5.2 CUBIC METERS. AS PER MANUFACTURES INSTRUCTIONS/SPECIFICATIONS, VESSEL IS REQUIRED TO BE SUPPLIED WITH 6.8 CUBIC METERSOF FOAM CONCENTRATE IN ORDER TO MEET THE 30 MIN TIME REQUIREMENT SET FORTH IN IBC 11.3.6.
74SOLAS(14) VII/10.1
IBC 11.3.6
50ac - BEFORE CARGO OPS
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2019
Resolved 28 June 2019
Resolution: PHOTO DOCUMENTATION FROM VESSEL AND CLASS RECIEVED RECTIFYING DEFICIENCY.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 18 June 2019
Resolved
CONTROLLED TANK VENTING SYSTEMS FITTED TO TANKS TO BE USED FOR CARGOES HAVING A FLASHPOINT NOT EXCEEDING 60 DEGREES C SHALL BE PROVIDED WITH DEVICES TO PREVENT THE PASSAGE OF FLAME INTO THE CARGO TANKS (IBC 8.3.6). FLAME SCREEN MEANS A FITTED SINGLE SCREEN OF CORROSION RESISTANT WIRE OF AT LEAST 30 BY 30 MESH, OR TWO FITTED SCREENS BOTH CORROSION RESISTANT WIRE, OF AT LEAST 20 BY 20 MESH SPACED LESS THAN 1/2 INCH OR MORE THAN 1 AND 1/2 INCHES APART.
P/V VALVE FLAME SCREENS ON CARGO TANKS 6P, 4S, 2P, AND 2S HAVE APPROXIMATELY 1/2 INCH BY 1/2 INCH HOLES PROTRUDING THROUGH THE SCREENS CREATING A FLAME PATH.
74SOLAS(14)VII/10.1
IBC 8.3.6
REF 46CFR30 10.25
50ac - BEFORE CARGO OPS
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2019
Resolved 28 June 2019
Resolution: PHOTO DOCUMENTATION FROM VESSEL AND CLASS RECIEVED RECTIFYING DEFICIENCY.
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 18 June 2019
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD.
THE STARBOARD DRAFT READING INDICATOR LOCATED IN THE CCR IS INOPERABLE RENDERING THE VESSEL INCAPABLE OF ENSURING SUFFIENT CLEARANCE AROUND THE ENTIRETY OF THE VESSEL.
74SOLAS(14)I/11(a)
50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2019
Resolved 25 June 2020
Resolution: Received class report (ABS) attesting to correction of deficiency.