Records from 2008 to 2009. Most recent: inspection, 11 March 2009.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 10 March 2009
Resolved
Main ladder to the bridge has been replaced, no hand rail has been added.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2009
Resolved 11 March 2009
Resolution: Verified the construction of handrail to the bridge was complete and satisfactory.
Fire Fighting › Emergency Fire Pumps › Power Source
Issued 10 March 2009
Resolved
Vessel's fire pump is not operational, will not energize.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2009
Resolved 11 March 2009
Resolution: Received faxed paperwork from the Master confirming the vessel has a leased portable fire pump on board and verified the fire pump is fully operational.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 March 2009
Resolved
Vessel's navigation lights are not operational due to electrical work.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2009
Resolved 11 March 2009
Resolution: Verified all navigation lights are fully operational.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 9 January 2008
Resolved
MAKE OPERATIONAL ALL ENGINE ROOM VENT CLOSURES TO THE SATISFACTION OF FLAG STATE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Construction/Loadline › Structures › Transverse Bulkhead
Issued 9 January 2008
Resolved
REPAIR RUST HOLES IN ENGINE ROOM FORWARD AND AFT BULKHEADS TO THE SATISFACTION OF FLAG STATE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Construction/Loadline › Hull › Bottom Plating
Issued 9 January 2008
Resolved
ADRESS WEEOING RUST PATCHES IN BOTTOM PLATING IN ENGINE ROOM AND STEERING ROOM TO THE SATISFACTION OF FLAG STATE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Construction/Loadline › Structures › Manhole
Issued 9 January 2008
Resolved
MAKE VOID COVERS IN CARGO BAY WATERTIGHT TO THE SATISFACTION OF FLAG STATE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Construction/Loadline › Structures › Machinery Space Opening
Issued 9 January 2008
Resolved
MAKE OPERABLE ENGINE ROOM WATERTIGHT HATCH TO THE SATISFACTION OF FLAG STATE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Construction/Loadline › Structures › Air Pipe
Issued 9 January 2008
Resolved
REPAIR RUST HOLES IN CARGO BAY VOID VENTS AND SHELL PLATING TO THE SATISFACTION OF FLAG STATE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Construction/Loadline › Penetrations › Valve Flange
Issued 9 January 2008
Resolved
REMOVE OR SEAL UNUSED SIDE SHELL PENETRATIONS IN ENGINE ROOM TO THE SATISFACTION OF FLAG STATE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Lifesaving › Inflatable Liferafts › Servicing
Issued 9 January 2008
Resolved
SERVICE LIFERAFT
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Documentation › Certificates/Documents › Cargo Ship Safety Radio Certificate
Issued 9 January 2008
Resolved
PROVIDE VALID RADIO STATION LICENSE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 9 January 2008
Resolved
PROVIDE COAST PILOT, LIGHT LIST, AND TIDE TABLES
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Navigation › Piloting/Steering › Magnetic Compass
Issued 9 January 2008
Resolved
PROVIDE DEVIATION TABLE AND PROPERLY MOUNT MAGNETIC COMPASS
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Pump
Issued 9 January 2008
Resolved
MAKE OPERATIONAL STBD ENGINE ROOM BILGE PUMP TO THE SATISFACTION OF FLAG STATE
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2008
Resolved 4 February 2008