MAURY USCG vessel records
← All vessels

SEMISUB ONE

SEMISUB ONE is a 2010 passenger vessel (inspected). The Coast Guard has recorded 25 inspections since 2017, most recently in December 2025, along with 86 deficiencies — 1 with no resolution recorded — and 1 operational control.

Records from 2017 to 2025. Most recent: inspection, 5 December 2025.

Built
2010
Last inspected
5 December 2025
Documentation
Expired · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 5 December 2025
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 9 calendar years (2017–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDF7840
934437
Flag
UNITED STATES
Maury page id
psix-934437

Documentation record

Registered dimensions (L × B × D)72.0 ft × 25.0 ft × 9.8 ft
Registered tonnagegross 93 / net 69
ITC dimensions (L × B × D)72.0 ft × 25.0 ft × 9.8 ft
ITC tonnageNot recorded
BuilderSEMISUB INC · LONG BEACH, CA, UNITED STATES · built 2010
Hull materialAluminum
PropulsionDiesel Outdrive
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHONOLULU, HI
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 7 December 2010
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it93 - Regulatory (Subpart C or D), Gross Ton
69 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 25

5 December 2025 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8278398
11 March 2025 Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8090299
21 February 2025 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8082851
7 November 2024 Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8031959
23 April 2024 Deficiency Check · COI Inspection · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7900449
1 April 2024 Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7888430
16 March 2023 Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7647874
22 December 2022 Internal Structural Exam · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7607840
20 October 2022 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7580084
22 June 2022 Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7484607
1 October 2021 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7324823
18 May 2021 Internal Structural Exam · Drydock Exam · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7195678
13 November 2020 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7094911
24 June 2020 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6985830
29 January 2020 Deficiency Check · Administrative Inspection · In-Service Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6899104
27 November 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6868374
23 October 2019 Internal Structural Exam · Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6842129
31 August 2019 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6830929
17 July 2019 Internal Structural Exam · Administrative Inspection · Hull Examination · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6753752
28 February 2019 Examination of Repairs · Administrative Inspection · Excursion Permit · Internal Structural Exam · Initial Certification · DAPI Audit · Deficiency Check · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6633831
4 February 2019 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6622091
1 February 2019 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6619808
6 July 2018 Examination of Repairs · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6469917
10 July 2017 Internal Structural Exam · Drydock Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6201281
7 June 2017 Administrative Inspection · Examination of Repairs · Plan Review "T" Boat · Construction Oversight
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6168724

Deficiency record · 86

02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 March 2025 No resolution recorded
The owner or managing operator shall make a vessel available for drydock examinations. The vessel has not completed its drydock inspection and has re-entered the water. The vessel will need to complete a drydock prior to carrying passengers. 46CFR176.600(a)
Action required: 701 - Prior to carriage of passengers/cargo
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 June 2024 Resolved
The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. Fireboy servicing tags marked by servicing facility as "unsatisfactory" due to overdue hydrostatic pressure test. 46 CFR 176.810(b)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2024
Resolution: Provided servicing reports from A GOW dated 6AUG2024.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 12 June 2024 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of lifesaving equipment, including the following: Inspection of each hydrostatic release unit to determine that it is in compliance with the servicing requirements of 185.740. Hydrostatic release unit for EPIRP not marked with expiration date. 46 CFR 176.808(a)(5)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2024
Resolution: Cleared.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 June 2024 Resolved
Each collision bulkhead required by 179.210, must be constructed in accordance with 179.320, except that a collision bulkhead: (2) Must not be fitted with any type of penetration or opening except penetrations may be made if they are located as high and and as far inboard as practicable and they have a means to make them watertight. Unknown pipe penetrating collision bulkhead on port-side compartment is sheered off with no watertight fitting. Determine origin and piping system of unknown pipe and make the thru-hull penetration watertight. 46 CFR 179.310(a)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2024
Resolution: Cleared.
09 - Working and Living Conditions › 092 - Working Conditions › Other (mooring)
Issued 12 June 2024 Resolved
A vessel must be fitted with ground tackle and mooring lines necessary for the vessel to be safely anchored or moored. The vessel's aft starboard cleat broke off. The vessel is currently using the central beam in the aft staircase for their aft mooring line. 46 CFR 184.300
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 August 2024
Resolution: Cleared.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 12 June 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment and electrical shock. Several unauthorized surge protector power strips installed onboard. 46 CFR 183.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 August 2024
Resolution: Cleared.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 12 June 2024 Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure and have either:(1) A pressure type connector on each conductor; (2) A solder lug on each conductor; (3) A splice made with a pressure type connector to a flexible lead or conductor; (4) A splice that is soldered, brazed, or welded to a flexible lead or conductor. Multiple instances of incorrectly spliced wires onboard for electrical equipment. 46 CFR 183.340(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2024
Resolved 13 September 2024
Resolution: New cable was installed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 12 June 2024 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and it appurtenances. Aft-most viewing port on starboard side is leaking from bottom-aft corner. Remove excessive silicone/caulking for reinspection by attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2024
Resolution: Cleared. Will monitor regularly and repair during next dry docking.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 1 April 2024 Resolved
A hatch exposed to the weather must be watertight. Gasket on port forepeak hatch was wasted and no longer watertight. Renew gasket. 46 CFR 179.360 (a) 705 C
Action required: 705 - Other - as specified
Resolved 12 June 2024
Resolution: Gaskets were found to be renewed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 1 April 2024 Resolved
At each inspection of a vessel, the owner or managing operator shall be prepared to conduct tests including the following: Inspection and operation of through hull fittings and sea valves. Main engine raw water butterfly valve had wasted support mount. Replace valve. 46 CFR 176.802 (a)(2) 705 C
Action required: 705 - Other - as specified
Resolved 23 April 2024
Resolution: Support mount determined not to be in service ballast water actuator removed with decommissioning of active waterballast system.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 1 April 2024 Resolved
The freeing ports or scuppers on a well deck vessel must be located to allow rapid clearing of water in all probable conditions of list and trim. Port side well deck scupper had corrosion in piping leading overboard. Replace damaged section of piping. 46 CFR 178.430 (c) 705 C
Action required: 705 - Other - as specified
Resolved 12 June 2024
Resolution: Piping section was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2023 Resolved
Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and is subject to such requirements as determined necessary by the cognizant [name withheld] unusual types of propulsion machinery include: Hydraulic jets. Crack found on port bucket outboard support arm. Inboard support arm bearing shows excessive gap between arm and outboard propulsion duct housing. Repair in accordance with manufacturers specifications and conduct sea trial demonstrating proper operation of propulsion system. 46CFR182.220(c)(3) 705 c
Action required: 705 - Other - as specified
Resolved 14 April 2023
Resolution: Conducted repair in accordance with guidance send from manufacture. All sat.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 16 March 2023 Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Replace sealant around pipe in #2 port ballast void on forward bulkhead. 46CFR179.320(c) 705 c
Action required: 705 - Other - as specified
Resolved 8 March 2024
Resolution: All bulkhead penetrations sealed.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 16 March 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Dead end wires found in starboard forward void. 46CFR183.200(c) 705 c
Action required: 705 - Other - as specified
Resolved 12 June 2024
Resolution: Dead end wires were removed.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 March 2023 Resolved
A vessel must comply with the structural design requirements of one of the standards listed. In stbd #3 ballast void pipe was found with hole. Replace in kind. 46 CFR 177.300 705 c
Action required: 705 - Other - as specified
Resolved 12 June 2024
Resolution: Pipe section was replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 16 March 2023 Resolved
A vessel must comply with the structural design requirements of one of the standards listed. In stbd #3 ballast void, found deformation of longitudinal stiffener. Submit repair proposal to remove and replace in kind to good metal to the satisfaction of attending Marine Inspector. 46 CFR 177.300 705 c
Action required: 705 - Other - as specified
Resolved 14 April 2023
Resolution: Longitudinal stiffener replaced in kind.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 March 2023 Resolved
If foam is installed as flotation material on a vessel, the owner shall ensure that the following tests are conducted and requirements are met, to the satisfaction of the cognizant OCMI. In stbd #3 ballast void, areas of foam were removed. Reinstall in accordance with manufacturers specifications, refer to stability letter. 46 CFR 179.240 (b)(6)(ii) 705 c
Action required: 705 - Other - as specified
Resolved 8 March 2024
Resolution: Foam was installed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 March 2023 Resolved
A vessel must comply with the structural design requirements of one of the standards listed. One wash weld and one unseated weld round on stbd outboard interior plate in stbd forward void. One wash weld found on stbd inboard interior plate. Scarf and renew. 46 CFR 177.300 705 c
Action required: 705 - Other - as specified
Resolved 8 March 2024
Resolution: Scarfed and renewed.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 16 March 2023 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] found a soft patch on piping in near the bilge in an amidships compartment in the starboard hull. Have space cleared for entry by a marine chemist and make space available for inspection by attending USCG Marine Inspector. 46 CFR 176.700 705 c
Action required: 705 - Other - as specified
Resolved 31 March 2023
Resolution: Marine chemist cert provided for required spaces.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 March 2023 Resolved
A hatch cover must be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Port side, forward hatch hinge is missing. Repair hatch. 46 CFR 179.360 (b)(2) 705 c
Action required: 705 - Other - as specified
Resolved 14 April 2023
Resolution: Vessel attached hatch with chain.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 March 2023 Resolved
Repairs or alterations to the hull that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] external hull inspection, attending MI found a patch of fairing compound on bottom, outboard side of the port hull. Remove the perceived patch to reveal hull material underneath. 46 CFR 176.700 705c
Action required: 705 - Other - as specified
Resolved 27 March 2023
Resolution: Compound was removed and hull was in good condition.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 16 March 2023 Resolved
A hatch exposed to the weather must be watertight. Gasket seals for hatches are worn and brittle. Replace seals on 2 hatches, forward, port side hull. 46 CFR 179.360(a) 705 c
Action required: 705 - Other - as specified
Resolved 8 March 2024
Resolution: New gaskets provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2023 Resolved
During the examination all accessible parts of the vessels underwater body and all through hull fittings including sea valves shall be made available for examination. Sea valves must be opened for examination. A total of six through hull fittings were not available for examination. Make ready, sea valves for examination. 46 CFR 176.610(a) 705 c
Action required: 705 - Other - as specified
Resolved 27 March 2023
Resolution: All six through hull valves were made available and inspected sat.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 16 March 2023 Resolved
An internal structural examination conducted in compliance with 176.600 may be conducted while the vessel is out of the water and consists of a complete examination of the vessel’s main strength members. Where the internal framing, plating, or planking of the vessel is concealed, sections of the lining, ceiling or insulation may be removed, or the parts otherwise probed or exposed so that the inspector may be satisfied as to the condition of the hull structure. Remove water in bilge in both engine rooms to allow the attending Marine Inspector the ability to complete the internal structural exam. 46 CFR 176.610(b) 705 c
Action required: 705 - Other - as specified
Resolved 8 March 2024
Resolution: Water removed and area inspected sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 March 2023 Resolved
An internal structural examination (ISE) conducted in compliance with 176.600 may be conducted while the vessel is out of the water and consists of a complete examination of the vessel’s main strength members. Remove remote actuated switches and clear out water in both port and starboard forward peak compartments to allow the attending MI to complete ISE. 46 CFR 176.610(b) 705 c
Action required: 705 - Other - as specified
Resolved 23 May 2023
Resolution: Forward peak compartments were made available and inspected resulting in completion of insert on port bow.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 March 2023 Resolved
An internal structural examination conducted in compliance with 176.600 may be conducted while the vessel is out of the water and consists of a complete examination of the vessel’s main strength members. Where the internal framing, plating, or planking of the vessel is concealed, sections of the lining, ceiling or insulation may be removed, or the parts otherwise probed or exposed so that the inspector may be satisfied as to the condition of the hull structure. In accordance with the SEMISUB ONE Operations manual, during quarterly inspections and annual haul outs, measurements of the starboard forward bulkhead S1A, will be monitored by the vessel operator and verified by OCMI during inspections. Have forward spaces in port and starboard hulls, with bolted hatches, cleared for entry by a marine chemist and make space available for inspection by attending USCG Marine Inspector. 46 CFR 176.610(b) 705 c
Action required: 705 - Other - as specified
Resolved 14 April 2023
Resolution: Vessel rep completed measurement while USCG witnessed.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 22 December 2022 Resolved
At each internal structure exam the condition of all accessible internal portions of the vessel, including major hull plating and framing, shall be inspected. The vessels outboard hull and internal framing in way of the forward bulkhead of the starboard engine room is not watertight and is allowing sea water to ingress to the engine room. Provide a repair proposal to affect repairs to the satisfaction of the attending Coast Guard marine inspector. This repair must be approved by the OCMI prior to commencing work. 46 CFR 176.610(b) 46 CFR 176.700
Action required: 705 - Other - as specified
Resolved 23 May 2023
Resolution: Repair completed with sat insert.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 22 December 2022 Resolved
At each internal structure exam the condition of all accessible internal portions of the vessel, including major hull plating and framing, shall be inspected. Three frames in the starboard engine room present cracked, undercut, or improper welds. Gouge and reweld to the satisfaction of the attending Coast Guard marine inspector. 46 CFR 176.610(b)
Action required: 705 - Other - as specified
Resolved 8 March 2024
Resolution: Welds ground back and inspected, sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 22 December 2022 Resolved
Each vessel that relies on electricity to power vital systems listed in 46 CFR 182.710 must be arranged so that the loads can be energized from two sources of electricity. Only one of the provided generators is operational. Prove proper operation of both electrical generators. 46 CFR 183.310
Action required: 705 - Other - as specified
Resolved 8 March 2024
Resolution: Tested generators on load, sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 22 December 2022 Resolved
At each inspection for certification an operational test of the means provided for pumping bilges shall be conducted. Conduct an operational test of the vessel's bilge pumps in both hulls to the satisfaction of the attending Coast Guard marine inspector. 46 CFR 176.804(g)
Action required: 705 - Other - as specified
Resolved 12 June 2024
Resolution: Bilge pump test was satisfactory in both compartments.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 October 2021 Resolved
The owner or managing operator shall make a vessel available for internal structural examinations required by his section. Vessel did not complete quarterly internal structural examination by due date of September 30, 2021. Vessel shall not carry passengers for hire until successful completion of internal structural examination, to inlcude the correction of all identified worklist items. 46 CFR 176.600
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 October 2021
Resolved 14 April 2023
Resolution: Completed ISE.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 24 June 2020 Resolved
Fire pump outlet must be fitted with a pressure gauge. Discharge side of the fire pump is missing a pressure gauge.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2020
Resolved 18 May 2021
Resolution: Pressure gauge fitted to discharge side of the fire pump.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 13 March 2020 Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which that are to be employed. Vessel was reported to have grounded since the last USCG credit dry-dock examination. Vessel must dry-dock to conduct a post grounding damage survey to the satisfaction of the attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 August 2020
Resolution: Post Grounding Survey Completed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 January 2020 Resolved
A vessel must carry one floating waterlight. The forward port and starboard ring buoy floating water lights do not work. Provide one floating waterlight and demonstrate its proper operation to the satisfaction of the attending USCG Marine Inspector. Vessel limited to daylight operations until deficiency rectified and cleared by USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 August 2020
Resolution: Verified the proper operation of the port and starboard ring buoy floating waterlight
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 30 January 2020 Resolved
The owner of managing operator shall make a vessel available for internal structural examinations required by this section. Make the center aft void, 3 starboard ballast tank, 3 port ballast tank available for completion of the vessel's required quarterly internal structure examination.
Action required: 705 - Other - as specified
Resolved 13 August 2020
Resolution: Entered and inspected the center aft void, #3 starboard ballast tank, and #3 port ballast tank.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 January 2020 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. Attended vessel to deliver CG-835V from previous inspection. Noted foam from starboard aft ballast tank on main deck. Crew stated that the raw water suction from the seachest to the starboard propuslion engine had seperated and the tank was taking on sea water. Crew wrapped pipe with "flexseal" tape and intended to make repairs without notifying OCMI. Have space cleared for entry by a marine chemist and make space available for inspection by attending USCG Marine Inspector prior to conducting repairs.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 August 2020
Resolution: Satisfactory repairs completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 November 2019 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during and emergency. The ballast pump clutch air system's port air compressor is not functional. Complete permanent repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 November 2019
Resolution: Verified replacement in kind port machinery space air compressor was installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 November 2019 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. The ballast pumps clutch air compressors are not functional. Complete permanent repairs or submit a detailed plan that outlines temporary measures that provides an equivalent level of safety to that of operating with a USCG approved permanently installed system prior to conducting ballast operations.
Action required: 705 - Other - as specified
Resolved 13 November 2019
Resolution: New starboard cluth air system air compressor installed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 October 2019 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Pod A has a fractured weld on the upper mullion. Crop and renew.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 October 2019
Resolution: Fracture weld repaired satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 25 October 2019 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during and emergency. The following structural members were identified as needing repairs, 1. The overhead beam in forward machinery port side has a marked fractured weld. Crop and renew. (Cleared 8NOV2019 2. The outboard ballast water piping in forward machinery port side has as incomplete weld.. Crop and renew. 3. Port wing void has holes between welds and vertical frames. Fill the holes. (Cleared 8NOV2019) 4. Vertical frame in port wing void is marked and bent. (Agreed to continue monitoring the deflection, Cleared on 29OCT2019) 5. Stbd wing void has holes between welds and vertical frames. Fill the holes. (Cleared 8NOV2019) 6. The first frame upon entering the stbd wing void has a large crack and a smaller crack, both marked. Crop and renew. (Cleared 8NOV2019) 7. Stbd wing void has pitting welds. Crop and renew. (Welds reevaluated and are in satisfactory condition, cleared 8NOV19) 8. There is a marked crack in the overhead of the stbd wing void. crop and renew. (Cleared 8NOV2019) 9. Stbd fwd void inboard ballast intake pipe at the "t" has a weld that is weeping. Crop and renew. (Cleared 8NOV2019) 10. S2 Ballast tank's 2, 3, & 4 transverse web frames fwd of the aft bulkhead have fractured welds. Crop and renew. (Cleared 29OCT2019) 11. S1 ballast tank has 5 fractured welds as identified and marked. (Cleared 8NOV2019)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 August 2020
Resolution: All requirements completed to the satisfaction of the attending Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 October 2019 Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structure examination in affected space. The following spaces need to be de-scaled and re-inspected, 1. Salt exists on the bottom of wing voids. Remove salt for further inspection of pitting. 2. Overhead of port wing void is pitting. Clean up for further inspection. 3. There is pitting of at least 1/32" on the deck of the port side fixed ballast space. Drain water for further inspection. 4. Port wing void has ungrinded welds with plausible cracks. Grind for further inspection and crop and renew if cracks exits. 5. Salt exists on the bottom of the fwd port trim void. Remove salt for further inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 November 2019
Resolution: All areas descaled, reinspected, and found to be in satisfactory condition.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 July 2019 Resolved
Vessel's captain was unable to properly demonstrate operation of ballast control system. Prove proper operation of ballast system and crew competence in operation of ballast system to attending U.S. Coast Guard Marine Inspector prior to operating ballast system with passengers on board.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 August 2019
Resolved 15 July 2019
Resolution: Vessel's master and crew demonstrated proper operation of installed ballast system.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 July 2019 Resolved
Observed repaired weld weeping at main transverse watertight bulkhead 7 and the side shell below the water line. Submit repair proposal to OCMI for approval prior to conducting repairs. Conduct repairs prior to completion of next scheduled dry-dock.
Action required: 705 - Other - as specified
Due 31 July 2019
Resolved 17 July 2019
Resolution: Weld back gouged and welded from inside of the stbd void. Area to be monitored for weeping on future inspections.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 July 2019 Resolved
The discharge ends of fuel tank vent pipes must be fitted with removable flame screens or flame arresters. The vessel currently has a combination fill cap and vent installed. Per the manufatcture's documentation, these caps are not suitable for normal or emergency venting. Install proper vents with flame screens for both forward and aft tanks. Submit proposal to OCMI for approval prior to conducting repairs. Repairs are to be conducted prior to completion of next scheduled dry-dock.
Action required: 705 - Other - as specified
Due 31 July 2019
Resolved 29 July 2019
Resolution: Verified the correct installation of the fuel tank vents and fill caps.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 July 2019 Resolved
Vessel's approved drawings for vents and fills, dated November 06, 2017, do not represent the as built configuration. Resubmit drawing depicting as built configuration to MSC for approval.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 August 2019
Resolved 6 August 2019
Resolution: Received approved plans (E1-1902588 dated 6 Aug 2019) from the Marine Safety Center.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 8 July 2019 Resolved
Each vessel that complies with the stability requirements of 46 CFR 170.170, 170.173, 171.050, 171.055, and 171.057 must have permanent draft marks at each end of the vessel; or have permanent loading marks placed on each side of the vessel forward and aft to indicate maximum allowable draft. Vessel has no draft or loading marks. Properly mark vessel by completion of next scheduled drydock.
Action required: 705 - Other - as specified
Due 31 July 2019
Resolved 17 July 2019
Resolution: Verified draft marks were pemanently affixed to the hull of the vessel
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 29 March 2018 Resolved
Install ground detection system for 120/240 VAC dual voltage systerm per 46 CFR 111.05-27. 46 CFR 183.324(c)(1). MSC letter E2-1703084
Action required: 705 - Other - as specified
Due 29 April 2018
Resolved 11 December 2018
Resolution: Ground fault detection system installed in AC switchboard in the pilot house. MSC approved plans indicate ground fault detection. Verified condition of ground fault detection using multi meter.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 29 March 2018 Resolved
Ensure an approved generator breaker is installed that adewuately protects the LSTSGU-23 cables in port/starboard pilot house main breaker panel. 46 CFR 183.380(d)
Action required: 705 - Other - as specified
Due 29 April 2018
Resolved 17 January 2019
Resolution: Approved generator breaker installed that meets 46 CFR 183.380(d). Ref: MSC Approval Letter E2-1804792
Electrical › Electrical Distribution System (service) › Neutral Bus
Issued 29 March 2018 Resolved
Prove neutral bus is grounded for the 120/240 VAC dual voltage system. 46 CFR 183.324(a)(2).
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2018
Resolved 11 December 2018
Resolution: Neutral bus is grounded for the 120/240 VAC dual voltage system. Ground detection installed in main switchboard providing the single ground in the AC electrical circuit.
Electrical › Electric Supply System (service) › Cable
Issued 29 March 2018 Resolved
Submit DC electrical system for MSC approval for port and starboard engine room and updaed electrical ballast.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2018
Resolved 11 December 2018
Resolution: DC electrical circuit plans submitted and approved by MSC.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 28 November 2017 Resolved
Add the following updates to AC Electrical Schematic from latest 06 Oct 17 MSC approval: 15 amp breaker for radar in pilot house distribution panel, remove water heater breaker, update generator local circuit breakers to 125 amp, update bilge pump ameperage to 20 amps, update galley distribution panel with galley reception 15 amp to 20 amp.
Action required: 705 - Other - as specified
Due 28 December 2017
Resolved 17 January 2019
Resolution: 15 amp breaker for radar in pilot house distribution panel added, water heater breaker removed, generator local circuit breakers updated, bilge pump ameperage updated to 20 amps, galley distribution panel with galley reception 15 amp to 20 amp updated.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 28 November 2017 Resolved
Remove welding cable in generators with approved UL boat cable or cable that meets requirements of 46 CFR 183.340.
Condition: Invalid
Action required: 705 - Other - as specified
Due 28 December 2017
Resolved 21 December 2017
Resolution: Welding cable replaced with UL boat cable.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 28 November 2017 Resolved
Replace overcurrent protection for air compressor clutch with approved overcurrent protection that meet the requirements of 46 CFR 183.380
Condition: Invalid
Action required: 705 - Other - as specified
Due 28 December 2017
Resolved 17 January 2019
Resolution: Overcurrent protection for air compressor clutch replaced. Meets 46 CFR 183.380.
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 November 2017 Resolved
DC electrical circuit in pilot house does not conform to approved plan dated 06 OCT 2017. Noted that operator removed wire from Monroe MILSPEC M24643 cable and installed in DC circuit. Unable to identify required markings once conductor is removed from Monroe cable. Cite: 46 CFR 183.220(d), DC Electrical Schematic Pilot [name withheld] 06 OCT 2017
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 December 2017
Resolved 17 January 2019
Resolution: Verified that DC electrical circuit in pilot house conformed to approved plan dated 12 Dec 18 referenced in MSC Plan Approval Letter E2-1804792, dated 27 Dec 18.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 17 November 2017 Resolved
Identified 12V DC breaker panel not indicated on approved DC electrical pilot house circuit plan dated 06 OCT 2017. 12V DC breaker panel includes 5 breakers for Navlite, maretron,PTO override, port view emergency, and starboard view emergency. Cite: DC Electrical Schematic Pilot [name withheld] 06 OCT 2017
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 December 2017
Resolved 17 January 2019
Resolution: Verified that 12V DC breaker panel installed in pilot house conformed to latest approved plan dated 12 Dec 18 referenced in MSC Plan Approval Letter E2-1804792, dated 27 Dec 18.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 17 November 2017 Resolved
Install overcurrent protection between the pilot house distribution panels and the two Lisco power distribution blocks. 46 CFR 183.380(a)
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 December 2017
Resolved 12 January 2018
Resolution: Operator installed UL listed class T 100 amp fuse after the battery switch and prior to the lisco distribution blocks on the 12 volt pilot house circuit.
Electrical › Electrical Distribution System (service) › Conductor
Issued 17 November 2017 Resolved
Conductors between the battery switches and pilot house distribution panels must meet 46 CFR 183.340(d). Conductors in the engine room DC circuits must meet 46 CFR 183.220(d) and 46 CFR 183.340(d). 46 CFR 183.340(d), DC Electrical Schematic Approved 06 OCT 2017
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 December 2017
Resolved 17 January 2019
Resolution: Conductors between the battery switches and pilot house distribution panels meet 46 CFR 183.340(d)
Electrical › Electrical Distribution System (service) › Cable
Issued 8 September 2017 Resolved
Remove unmarked cables in engine room. Currently, MIs cannot verify cables with approved electrical plans.
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 October 2017
Resolved 17 January 2019
Resolution: Unmarked cables replaced with cables that meet 46 CFR 183.340.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 8 September 2017 Resolved
Replace all blade type fuses in engine rooms with overcurrent protection that meets 46 CFR 183.380.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 October 2017
Resolved 20 March 2018
Resolution: Blade type fuses in engine room removed and replaced with cartridge type fuses that meet 46 CFR 183.380
Electrical › Electrical Distribution System (service) › Cable
Issued 8 September 2017 Resolved
Ensure all positive battery cables are rerouted so they are not touching bare metal.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 October 2017
Resolved 20 March 2018
Resolution: Positive battery cables rerouted.
Construction/Loadline › Structures › Superstructure
Issued 8 September 2017 Resolved
Provide updated plans and approval letters for the following plans that are no longer valid due to the numerous unauthorized changes: Upper Deck Arrangement, Viewing Compartment Seating, Tank Capacity Plan, Construction Section, Pilot [name withheld]
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 October 2017
Resolved 12 January 2018
Resolution: Updated plans and MSC approval letter received for Upper Deck Arrangement, Viewing Compartment Seating, Tank Capacity Plan, Construction Section, Pilot [name withheld]
Construction/Loadline › Hull › Hull Plating
Issued 8 September 2017 Resolved
Install viewing pod window bolts in accordance with manufacturer's instructions.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 October 2017
Resolved 20 March 2018
Resolution: Viewing pod window bolts installed per manufacturer's instructions
Electrical › Electric Generation Source (service) › Number of Sources
Issued 31 August 2017 Resolved
Add ballast electrical circuit to DC electrical load analysis and submit to MSC for review.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 9 March 2018
Resolution: Received approval letter E2-1800866 for Maretron Computer Ballast Control System added.
Electrical › Electric Supply System (service) › Battery Installation
Issued 31 August 2017 Resolved
Provide MSC approved plans for electrical circuit (DC) related to the vessel's ballast system.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 9 March 2018
Resolution: Received approval letter for vessel's ballast system DC circuit (E2-1800866).
Electrical › Electric Supply System (service) › Battery Installation Ventilation
Issued 31 August 2017 Resolved
Provide battery ventilation and temperature compensation probe to prevent DC battery overcharging on DC batteries installed for the bow thruster circuit.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 20 March 2018
Resolution: Vessel owner installed ventilation and temperature compensation probe for bow thruster batteries.
Electrical › Electric Supply System (service) › Battery Installation
Issued 31 August 2017 Resolved
Install temperature compensation probe to monitor overcharging on DC batteries installed in the pilot house DC circuit.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 20 March 2018
Resolution: Vessel owner installed ventilation and temperature compensation probe for bow thruster batteries.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 31 August 2017 Resolved
Replace glass fuses with UL listed fuses required for branch protection. Glass fuses found in all DC circuits and must be replaced.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 12 January 2018
Resolution: Glass fuses in the DC circuits replaced with UL listed class cc, g, h, or j cartidge fuses.
Electrical › Electrical Distribution System (service) › Cable
Issued 31 August 2017 Resolved
Replace wire cable found in pilot house 12 volt DC ciruit connected to the battery switch. Wire cable found to be shore tie cable with red electrical tape around it to conceal. Replace with cable that meets 46 CFR 183.340.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 17 January 2019
Resolution: Cable replaced with cable that meets 46 CFR 183.340.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 31 August 2017 Resolved
Replace 100 amp breakers in 24 volt and 12 volt pilot house DC circuit with UL 489 breaker.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 12 January 2018
Resolution: (UL 489) 100 amp breakers installed as primary branch protection for the 24 volt and 12 volt pilot house DC circuits.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 31 August 2017 Resolved
Replace ANL 500 amp fuse in bow thruster DC circuit with UL listed fuse designed for branch circuit protection.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 12 January 2018
Resolution: Verified 500 amp UL listed RK-5 fuse installed for branch protection to the bow thruster DC circuit.
Construction/Loadline › Hull › Side Shell
Issued 3 August 2017 Resolved
Provide proof that all observation window bolts are in satisfactory condition. Multiple glued on stainless steel heads or hardware found installed over previous hardware, giving a false impression that 316 stainless bolts were installed. Comply with MSC approved plans for hardware installation.
Action required: 705 - Other - as specified
Due 4 September 2017
Resolved 20 March 2018
Resolution: All observation window bolts tested with 30 lb torque wrench.
Construction/Loadline › Hull › Side Shell
Issued 10 July 2017 Resolved
Remove all observation window bolts located below the waterline when vessel is in ballast condition. Multiple glued on stainless steel heads found installed overtop of previous hardware, giving false impressions that 316 stainless bolts were installed. Comply with approved MSC plans for bolt installation.
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 4 August 2017
Resolution: Satisfied through OCMI appeal letter and test method, new CG-835 issued.
Construction/Loadline › Hull › Weld
Issued 10 July 2017 Resolved
Crop and and renew forward hatch fractures in spaces V1 and V2.
Action required: 705 - Other - as specified
Due 2 August 2017
Resolved 2 August 2017
Resolution: Fractures cropped and renewed.
Construction/Loadline › Penetrations › Valve Flange
Issued 10 July 2017 Resolved
Install sea valves in ballast piping located in compartments V3 and V4.
Action required: 705 - Other - as specified
Due 2 August 2017
Resolved 2 August 2017
Resolution: Sea valves and flanges installed IAW ABS standards.
Stability › Intact Righting Energy › General
Issued 10 July 2017 Resolved
Remove fixed ballast and rubber gasket material in spaces V3 and V4 for inspection. Reinstall fixed ballast and insulate for the structural aluminum using rubber gasket material and wood.
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 18 August 2017
Resolution: Fixed ballast installed in each compartment requred. Fixed ballast isolated from hull using rubber material and braced using wood material.
Construction/Loadline › Hull › Hull Plating
Issued 10 July 2017 Resolved
Open and remove paint blisters for inspection of hull material at centerline of hull between frames 6 and 11.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 3 August 2017
Resolution: Paint blisters removed. One hole found in crossdeck hull measuring less than 1/32" in diameter. Operator cropped and renewed.
Stability › Watertight Integrity › General
Issued 10 July 2017 Resolved
Remove paint around all thru hull fittings on vessel. Remove all thru hull fittings where inspection of the valve operation cannot be visually witnessed by Inspector.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 3 August 2017
Resolution: Thru hull valves visually inspected, removed, and placed back into service.
Construction/Loadline › Penetrations › Valve Flange
Issued 10 July 2017 Resolved
Remove two thru hull valves and fittings for inspection in compartment V4. Clean interior of hull around thru hull valves for inspection of pitting corrosion observed by inspector.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 3 August 2017
Resolution: Pitting corrosion found around the aft thru hull fitting. Operator installed a stainless steel thru hull fitting on the exterior of the hull without CG approval, CG notification, and against approved MSC plans. Fitting replaced with one from approved MSC.
Stability › Watertight Integrity › General
Issued 10 July 2017 Resolved
Inspector found bondo in place of welds at thru hull penetration for port and stbd main engine exhaust piping at transom. 40% of the interior welds for the main engine exhaust thru hull fittings are missing. Exhaust penetration does not conform to MSC approved plans or regulations.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 3 August 2017
Resolution: Exhaust peneterations are welded so that the complete penetration is covered by weld on either the exterior and interior. NDT method approved by OCMI through appeal. NDT method passed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 10 July 2017 Resolved
Make repairs to improper welds found in C1, V1, V2, V3, V4, starboard engine room transverse overhead support located outboard side, and remove temporary bondo on all piping or welds in port side engine room forward collision bulkhead inboard side.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 3 August 2017
Resolution: Completed.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 10 July 2017 Resolved
Replace port and starboard main engine exhaust lagging where found with improper installation for temperatures exposed to.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 3 August 2017
Resolution: Exhaust lagging installed on main engine piping.
Construction/Loadline › Structures › Deck Plating
Issued 10 July 2017 Resolved
Remove overhead panels for inspection on each deck and above observation windows.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 3 August 2017
Resolution: Panels removed for inspection. Found welds cracked addressed in CG-835.
Construction/Loadline › Penetrations › Gasket
Issued 10 July 2017 Resolved
Replace cracked glass cover for underwater lights on port side.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 3 August 2017
Resolution: Operator replaced cracked light cover as original.
Stability › Unintentional Flooding › General
Issued 10 July 2017 Resolved
Submit plan revisions to MSC for approval for new installations in the ballast water piping to include flanges and gaskets installed during dry dock.
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 18 August 2017
Resolution: Plan revisions for ballast piping sent to MSC and approved. New valve installations tested using dye for NDT and operationally tested under normal operating pressures; all sat.
Construction/Loadline › Hull › Weld
Issued 10 July 2017 Resolved
Cracked welds found in the starboard forward viewing pod at the bulkhead weld for the forward window overhead and in the starboard aft viewing pod at the diagonal weld on the aft window. Submit repair plan, crop and renew.
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 20 March 2018
Resolution: Weld found repaired in accordance with approved repair plan.
Stability › Intact Righting Energy › General
Issued 10 July 2017 Resolved
Reinstall foam in compartments identified to contain foam on stability letter. Foam must equal amounts specified on stability letter. MI must attend to measure foam installation.
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 20 June 2018
Resolution: Verified foam installation in accordance with approved stability letter and to the satisfaciton of the OCMI.

Ownership record