← All vessels
INDEPENDENCE OF THE SEAS
INDEPENDENCE OF THE SEAS is a 2008 passenger vessel (inspected). The Coast Guard has recorded 33 inspections since 2008, most recently in March 2026, along with 41 deficiencies and 3 operational controls.
Records from 2008 to 2026. Most recent: inspection, 12 March 2026.
- Built
- 2008
- Last inspected
- 12 March 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 41 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9349681 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
C6WW4
936339
Flag
BAHAMAS, THE
—
Maury page id
psix-936339
Inspections, by type
…with no type recorded1
Years with a record
15 calendar years (2008–2026)
The 33 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Tonnage as PSIX records it154400 - Simplified, Gross Ton
155889 - Convention (Subpart B), Gross Ton
135083 - Convention (Subpart B), Net Ton
155889 - Convention (Subpart B), Gross Ton
135083 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 33
12 March 2026
Administrative Inspection
Administrative · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 8325071
9 March 2026
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8333081
30 October 2025
Administrative Inspection · PSC A · COC-CVE Annual
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8259877
13 February 2025
COC-CVE Quarterly · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8072298
22 July 2024
COC-CVE Annual · PSC A
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7963332
25 January 2024
PSC B · COC-CVE Quarterly
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7854028
2 August 2023
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7758811
24 July 2023
COC-CVE Annual · PSC A · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7749772
23 July 2023
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7749668
27 February 2023
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7642387
17 February 2023
COC-CVE Quarterly · PSC B
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7637297
29 July 2022
COC-CVE Annual · PSC A
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7516648
16 March 2022
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7412691
31 January 2022
COC-CVE Quarterly · PSC B
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7387667
31 July 2021
PSC B · COC-CVE Annual
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7270564
26 January 2021
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7130871
26 January 2021
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7130892
3 April 2020
In-Service Inspection
Physical examination · USCG Southeast District (dp) · USCG Southeast District (CGD-SE) · Activity 6935048
3 February 2020
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6901379
6 December 2019
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6868709
5 November 2019
ISPS III Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6844404
29 April 2019
COC-CVE Quarterly · Ballast Water Examination · ISPS III Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6670179
7 November 2018
Ballast Water Examination · COC-CVE Annual · ISPS III Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6573095
13 November 2017
ISPS III Exam · Ballast Water Examination · COC-CVE Annual · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6303856
23 November 2016
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6046472
10 November 2016
Ballast Water Examination · COC-CVE Annual · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6035724
27 April 2016
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5864103
20 November 2015
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5767569
7 November 2015
Ballast Water Examination · ISPS II Exam · COC-CVE Annual
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5759150
23 March 2014
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4821226
20 March 2014
NPV Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4819771
6 December 2009
Ballast Water Examination · MARPOL Annex I Examination · COC-CVE Annual · ISPS II Exam · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3644824
19 November 2008
COC-CVE Initial · ISPS II Exam · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Activities Europe · Activity 3157204
Deficiency record · 41
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 October 2025
Resolved
Fire doors in main vertical zone bulkheads, galley boundaries and stairway enclosures, the approximate time of closure for hinged fire doors shall be no more than 40 s and no less than 10 s from the beginning of thier movement. FD TT.7.15 did not close fully after 40 s. Additionally, multiple fire doors at the boundaries between main vertical zones closed less than 10 s.
74 SOLAS (2020) II-2/9.4.1.1.5.2
Code 40ac
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 30 October 2025
Resolved
The following functional requirements shall be met: escape routes shall be maintained in a safe condition, clear of obstacles. Engress from the suite lounge was blocked by a sofa.
74 SOLAS (2020) II-2/13.1.2
Code 10c
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 30 October 2025
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. The marking must enable passengers/crew to identify the routes of escape and readily identify the escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. In MVZ 8 stairway between deck 1 and 0, multiple low location light bulbs were not lit.
74 SOLAS (2020) II-2/13.3.2.5.1
Code 10c
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 February 2025
Resolved
The construction of doors and door frames in "A" class divisions, with means of securing them when closed shall provide resistance to fire as well as to the passage of smoke and flame equivalent to that of the bulkheads in which the doors are situated. Fire door 7.02 between incinerator room and engine space would not maintain the boundary as door remained open due to ventilation.
74 SOLAS 20 II-2/9.4.1.1.2
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 February 2025
Resolved
Fire extinguishers shall be situated ready for use at easily visible places which can be reached quickly and easily at any time in the event of a fire... PSCOs observed locker 3.8.3 in the main galley which was incapable of being opened. This locker contained the portable fire extinguisher for this space.
74 SOLAS 20 II-2/10.3.2.4
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 13 February 2025
Resolved
Escape door from public spaces that are normally latched shall be fitted with a means of quick release. Such means shall consist of a door latching mechanism incorporating a device that releases the latch upon the application of a force in the direction of flow...3 Not be equipped with any locking device, set screw or other arrangement that prevents the release of the latch when pressure is applied to the releasing device. PSCOs observed two escape doors (4.7.6 & 4.7.3) that had installed locks that could prevent the release of the latch when pressure is applied.
74 SOLAS 20 II-2/13.3.2.6.2
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 22 July 2024
Resolved
The construction of doors and door frames in "A" class divisions, with the means of securing them when closed, shall provide resistance to fire as well as to the passaged of smoke and flame equivalent to that of the bulkheads in which the doors are situated. Fire Door 7.02 between incinerator room and engine space would not maintain the boundary as the door remained open.
74SOLAS20 CH. II-2 / REG. 9.4.1.1.2
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 22 July 2024
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photo luminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. The marking must enable passengers/crew to identify the routes of escape and readily identify the escape exits. Additionally, escape route signs and fire equipment location markings shall be of photo luminescent material or marked by lighting. PSCO's identified low location lighting that was out in front of the Johnny Rockets Galley, Deck 12 forward. Emergency escape signage was absent from the Carpenter workshop, Deck 1 forward.
74SOLAS20, CH. II-2 / REG. 13.3.2.5.1
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 22 July 2024
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Liferaft deployment team were not familiar with the procedures to safely deploy, inflate, and launch a liferaft.
74SOLAS20 CH. III / REG. 19.2.1
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 25 January 2024
Resolved
Crew members shall be trained to be familiar with the arrangements of the ship as well as the location and operation of any fire-fighting systems and appliances that they may be called upon to use. One mess cook in the Playmakers Galley was not familiar with the manual release for the HI-FOG system or how to extinguish a fire in the deep fat fryer using a portable extinguisher or where the portable extinguisher is located. 74 SOLAS (20) II-2/15.2.2.1
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 January 2024
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. The marking must enable passengers to indentify the routes of escape and readily identify the escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminenscent material or marked by lighting. PSCOs observed low location lighting not functioning properly on deck 8 near cabin 8336 and on deck 10 near cabin 1340. 74 SOLAS (20) II-2/13.3.2.5.1
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 24 July 2023
Resolved
11129 - Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be be in working order and ready for mmediate use. Life boats #12 and 14 could not swing the rudder to the full range of motion. Life boat #12 was corrected on the spot. #14 could not be fixed and remained slightly reduced maneuverability to stbd. 74 SOLAS 20 III/20.2
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 24 July 2023
Resolved
11110 - Eery life raft shall be stowed with its painter permanently attached to the ship. Life raft on stbd aft of embarkation deck had the painter line loose and on the deck. Painte must be connected to the weak link of the hydrostatic release. 74 SOLAS 20 III/13.4.1
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 24 July 2023
Resolved
11129 - Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Lifeboat #7's canopy light had a broken mount but was still operational. 74 SOLAS 20 III/20.2
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 17 February 2023
Resolved
11131 - Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. PCSO observed multiple stairways guides assigned to crew stairway 5A starboard were not familiar with actions to take in an emergency, nor ship's communication procedures during an emergency.
74 SOLAS 20 III/19.2.1
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 17 February 2023
Resolved
07101 - Spaces are classified according to their fire risk as shown in catagories (1) to (14). A/C space on deck 2 near stairway 2C port is a catagory 10 space, where storage of combustibles is prohibited. PSCO observed multiple cardboard boxes of A/C filters in the space.
74 SOLAS 09 II-2/9.2.3.3.2.2
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 17 February 2023
Resolved
Seafarers shall receive safety familiarization and basic training or instruction. Crew members assigned to aft galleys in deck 2, 3, and 5 were unfamiliar with the location and operation of manual call points, fire extinguishers, and ventilation shutdowns. Crew in coffee promenade and Sorrento's in deck 5 were also unfamiliar with the location and operation of the fire fighting equipment previously mentioned.
STCW 2017 VI/1.1
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 17 February 2023
Resolved
07120 - The means of escape, including stairways and exits, shall be marked by lighting. Low location lighting throughout multiple decks on stairwell 5A starboard was blocked by luggage.
74 SOLAS 09 II-2/13.3.2.5.1
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 17 February 2023
Resolved
07105 - The construction of door frames in A class divisions, with a means for securing them when closed, shall provide resistance to fire as well as to the passage of smoke and flame the equivalent to that of the bulkheads in which the doors are situated. A class fire doors 1.2.03, TT.7.15, and 1.5.16 did not latch properly.
74 SOLAS 09 II-2/9.4.1.1.2
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 29 July 2022
Resolved
07103- Fire Safety- The minimum fire integrity of all bulkheads and decks shall be as prescribed in tables 9.1 and 9.2. Two holes were observed in the A-0 boundary.
SOLAS 09 II-2/9.2.2.3.1
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 July 2022
Resolved
07105 - Fire Safety - Fire doors in main vertical zone bulkheads shall be self-closing and be capable of closing with an angle of inclination of up to 3.5 degrees opposing closure. Fire door 1.1.1 in crew stairway did not latch properly.
SOLAS 09 II-2/9.4.1.1.4.1
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 29 July 2022
Resolved
11- Life Saving Appliances- Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCOs observed broken bilge selector switches on the bilge pumping system on lifeboats 1 and 18.
SOLAS 20 III/20.2
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 January 2022
Resolved
13199- Other (machinery): Flexible fuel pipes and end attachements shall be of approved fire-resisting materials of adequate strength and shall be constricted to the satisfaction of the administration. Flexible fuel pipes on the emergency diesel generator found to be deteriorated.
Solas 09 II-2/4.2.2.5.1
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 31 January 2022
Resolved
11134- Operation of Life Saving Appliance: Every Crew member with assigned emergency duties shall be familer with these duties before the voyage begins. Several lifeboat commanders were observed to be unfamiler with lifeboat emergency systems to include emergency steering, fuel shutoff, and bilge de-watering systems.
Solas 20 III/19.2.1
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 31 July 2021
Resolved
OPENINGS IN BULKHEADS AND DECKS IN PASSENGER SHIPS. THE APPROXIMATE TIME OF CLOSURE FOR HINGED FIRE DOORS SHALL BE NO MORE THAN 40S AND NO LESS THAN 10S. [name withheld] FIRE DOORS THAT CLOSED FASTER THAN 10S.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 31 July 2021
Resolved
FIRE PROTECTION SYSTEMS AND FIRE-FIGHTING SYSTEMS AND APPLIANCES SHALL BE MAINTAINED READY FOR USE. [name withheld] SMOKE DETECTOR IN THE MAIN GALLEY AFT.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 January 2021
Resolved
9101- Safety In General- Times for submitted NOAs are as follows: if your voyage time is less than 96 hours then you must submit a NOA before departure but at least 24 hours before arriving at the port or place of destination. The P/V INDEPENDENCE OF THE SEAS entered Port of Miami on January 26, 2021 without submitting a notice of arrival in accordance with 33CFR 160.212(a)(4)(ii)
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 April 2019
Resolved
07210- Means of Escape- Doors in escape routes shall, in general open in the direction of escape. Found escape route to suite lounge has a door that does not open in way of escape. -74SOLAS(14 Cons.)II-2/13.3.1.5
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 April 2019
Resolved
07120-Means of Escape- Escape routes shall be maintained in a safe condition, clear of obstacles. Secondary escape route forward from suite lounge is obstructed by chairs and tables. -74SOLAS(2014 Cons.)II-2/13.1.2
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 7 November 2018
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Several galley workers were unfamiliar with ships installed fire fighting equipment and procedures. SOLAS 2014 III/19.2.1 - 10c
Fire Fighting › Means of Escape › Escape Route Signs
Issued 13 November 2017
Resolved
Escape route lighting is not working properly in the following locations-RCTV office deck 4, assembly station light near FD 1.6.15 deck 1, assembly station light in olive twist 14, assembly light deck 13 sports court, and exit light forward lobby deck 11. 74 SOLAS (09 CONS.) CH.II-2/13.3.2.5.1. Action Taken 16ac.
Fire Fighting › Means of Escape › Blocked
Issued 13 November 2017
Resolved
Secondary escape route in the conference room located on deck 10 as indicated on fire control is blocked off by structural fire protection. Means of escape from photo lab is locked and cannot be opened without a key. 74 SOLAS (09 CONS.) CH. II-2/13.1.2. Action Taken 16ac.
Fire Fighting › Means of Escape › Emergency Lighting
Issued 13 November 2017
Resolved
Stairways and exits, shall be marked by lighting or photo luminescent strip indicators. Multiple areas throughout the ships low location lighting is not working properly. 74 SOLAS (09 CONS.) CH.II-2/13.2.5.1. Action taken 16ac.
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 13 November 2017
Resolved
Passenger ships carrying more than 36 passengers shall be equipped with an automatic sprinkler of an approved type complying with the Fire Systems Safety Code. Multiple ampoules for sprinklers in the laundry spaces are empty, rendering the system ineffective.74 SOLAS (09 CONS.) CH.II-2/10.6.1.1. Action taken 40ac.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 13 November 2017
Resolved
"A" class divisions are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. Multiple cables running through “A” class boundary located between main engine room to diesel generator room 2. 74 SOLAS (09 CONS.) CH.II-2/3.2.4. Action Taken 16ac.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 10 November 2016
Resolved
Spaces are classified according to their fire risk as shown in caragories 1 to 14; space shall be treated as a space with the releveant category hacin ghte most stringent requirements. Pool Equipment Room on Deck 10 is categorized as a Category 10 Space, but contains equipment which make it a Category 13 Space Workshop. SOLAS (04) II-2/9.2.2.3.2.2
Fire Fighting › Means of Escape › Doorways
Issued 7 November 2015
Resolved
0960 - The widths, number, and continuity of escapes shall be in accordance with the requirements of the code. On decks 3 and 4 in the main theater, there is additional seating placed beyond the last row of fixed seating, increasing the total capacity of the compartment limiting escape for total volume. 74 SOLAS (04 Cons.), Ch. II-2 / 13.3.2.4.5.
Fire Fighting › Means of Escape › Blocked
Issued 7 November 2015
Resolved
0960 - Normally locked doors that form part of an escape route shall not require keys to unlock them from inside the room. Several fire doors were found with broken thumb latches on the opposite side of lock. Fire doors affected: 5.8.15, 5.8.01, and 6.3.04.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 7 November 2015
Resolved
0799 - The doors in class "A" divisions shall provide resistance to fire as well as the passage of smoke. The fire wall located on deck five forward did not fully close and fire door 5.8.02 would not fully close. Battery was found dead. 74 SOLAS (04 Cons.), Ch. II-2 / 9.4.1.1.2.
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 7 November 2015
Resolved
0999 - Furniture in stairway enclosures shall be limited to seating, and it shall be fixed. Furniture in aft deck number 3 passenger staircase was not a fixed installation and there is a metal locker in the aft starboard staircase in landing. 74 SOLAS (04 Cons.), Ch. II-2 / 5.3.3.
Construction/Loadline › Hull › Bottom Plating
Issued 20 March 2014
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea. The vessel has an approximate 10 cm hole in the bottom SW Tank for the scrubber, in the Port side, between frames 88 and 104.74 SOLAS (2009 Cons) Ch. I/11
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.