Records from 2008 to 2024. Most recent: inspection, 20 May 2024.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOUTHWEST SHIPYARD LP · GALVESTON, TX, UNITED STATES · built 2009
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 28 May 2026 · expires 30 June 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Gross Ton
735 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 21
20 May 2024
Drydock Exam · COI Inspection · Cargo Tank Internal · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7915718
25 July 2023
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7746973
19 May 2022
Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7448337
8 February 2019
MTSA Verification · Drydock Exam · Cargo Tank Internal · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6618254
20 March 2018
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6396670
27 February 2017
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6103226
15 April 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5854931
14 January 2016
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5797800
31 March 2015
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5874579
14 January 2014
MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4781638
28 November 2012
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4550653
9 March 2012
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4331712
10 January 2011
Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3923756
23 December 2010
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3915216
19 December 2010
Periodic Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3913593
29 December 2009
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3657681
22 December 2009
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3654352
22 December 2009
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3654407
8 December 2009
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3702183
13 February 2009
COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3417177
19 December 2008
Hull Examination · Construction Oversight · Cargo Tank Internal · Spot Check · Internal Structural Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3390419
Construction/Loadline › Hull › Sheerstrake
Issued 16 December 2010
Resolved
4.5-5 inch inset on port side deck knuckle in mid body of barge.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 December 2010
Resolved 19 December 2010
Resolution: repaired with 5'' x 6'' insert on deck gunnel. Soap and air test satisfactory.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 22 December 2009
Resolved
During any period of time that the Cargo Pump Prime mover is operating a live watch must be posted and capable of imediately securing. Anytime pump is not in operation all fuel valves must be remain secured. This requirement shall remain until satisfactory engine manufacture repairs have been made. (See MISLE Act. 3654407) for further details.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 23 December 2009
Resolved 29 December 2009
Resolution: Relief valve installed and tested sat.