MAURY USCG vessel records
← All vessels

POINTE A LA HACHE

Built
1967
Last inspected
28 May 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 28 May 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDD9449
Flag
UNITED STATES
Maury page id
psix-94048

Documentation record

Registered dimensions (L × B × D)142.7 ft × 60.0 ft × 9.6 ft
Registered tonnagegross 656 / net 446
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderEQUITABLE EQUIPMENT COMPA · MADISONVILLE, LA, UNITED STATES · built 1967
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPLAQUEMINES PARRISH, LA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 25 February 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it656 - Regulatory (Subpart C or D), Gross Ton
446 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 47 inspections, each with its date, unit and type; 32 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 47

28 May 2026 Re-Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8382492
9 April 2026 MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8328130
25 November 2025 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8273685
26 September 2025 MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8230987
2 June 2025 Damage Survey · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8149867
1 April 2025 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8091747
2 January 2025 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8056702
9 October 2024 MTSA Verification · COI Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8004430
21 June 2024 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7939544
27 March 2024 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7885614
6 December 2023 MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7834638
19 September 2023 COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7794296
27 June 2023 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7724952
14 April 2023 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7668724
3 February 2023 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7611261
24 October 2022 Damage Survey · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7582678
14 October 2022 MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7559572
9 June 2022 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7472860
12 April 2022 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7429733
5 January 2022 Deficiency Check · Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7375962
4 March 2021 Internal Structural Exam · Drydock Exam · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7155250
23 November 2020 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7100376
17 November 2020 MTSA Verification · COI Inspection · Drydock Extension
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7096646
9 November 2020 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7092332
24 September 2020 Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7064458
22 September 2020 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7063002
12 June 2020 Periodic Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6966431
18 March 2020 Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6933234
16 March 2020 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6928457
24 February 2020 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6914590
21 November 2019 MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6844868
27 August 2019 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6796690
11 June 2019 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6717907
14 March 2019 In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6632416
27 November 2018 COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6587291
30 August 2018 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6520087
1 June 2018 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6431412
26 February 2018 Administrative Inspection · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6362177
20 November 2017 Examination of Repairs · Deficiency Check · Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6310380
15 September 2017 Periodic Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6265814
15 September 2017 Damage Survey · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6269571
16 June 2017 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6175921
10 March 2017 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6099852
2 December 2016 COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6049903
16 September 2016 MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5999669
10 June 2016 Administrative Inspection · Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5899988
18 March 2016 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5833907

Deficiency record · 32

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 April 2026 Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Port gen has oil leaks and breather tube leaking oil on windings. 46 CFR 72.03-5
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2026
Resolution: Recieved photgraphic evidence that vessel had fixed breather tube and oil leaks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 June 2025 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident or a defect is discovered which affects the safety of the vessel. Vessel experienced loss of starboard engine maneuverability while mooring up Belle Chasse Ferry Landing-West Bank, MM 76 and carrying 28 passengers. Vessel to provide document attesting to cause and affect to include operational testing to the satisfactory of attending CG Marine Inspector prior to carriage of passengers. 46 CFR 71.40-1
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 June 2025
Resolution: Starboard shaft replaced and port shaft reconditioned. Both re-installed with bearings. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 October 2024 Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. MI found both MDE's low L/O psi shutdown's outside of parameter IAW approved PSTPs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2024
Resolved 16 October 2024
Resolution: Received tech report. All sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 February 2023 Resolved
Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. On systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate. Each control valve to branch lines must be marked to indicate the related space served. MI thoroughly read posted instructions and determined that the listed local operating instructions may inadvertently bypass all installed safety and shut down systems. Vessel operator is required to have the required instructions validated by the servicing company and corrected as necessary. The issuing office understands that the servicing company is scheduled to attend vessel on 07FEB23. 46CFR76.15-10 16c.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 February 2023
Resolved 8 February 2023
Resolution: New instructions and valve labels posted and satisfactory pressure test of branch lines conducted.
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 18 October 2021 Resolved
On vessels required by 112.05-5(a) to have a temporary emergency power source, the following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency power source: Lighting, including… muster stations. There was no emergency lights installed on the aft deck in the vicinity of the muster station for the IBAs. 46 CFR 112.15-1(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Emergency Light was added to the embarkation are on the stern of the vessel near liferafts.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 18 October 2021 Resolved
General emergency alarm signal must: Be located in passenger and crew quarter areas where they can alert persons in spaces. The main deck port and starboard general alarms were not operating at the time of inspection. 46 CFR 113.25-9(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Port and stbd main deck general alarm bells are now functioning.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 18 October 2021 Resolved
Internal combustion engine exhausts, boiler and galley uptakes and similar source of ignition shall be kept clear of and suitably insulated from any woodwork or other combustible matter. The starboard main engine exhaust has missing lagging, exposing hot piping. 46 CFR 72.03-10
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Stbd main engine exhaust lagging was installed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 18 October 2021 Resolved
The general construction of the vessel shall be such as to minimize ire hazards insofar as is reasonable and practicable. There was excessive oily mixtures found below the main and auxiliary engines in the engine room. 46 CFR 72.03-5(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Oily mixture was removed from engine bay's underneath engines.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 18 October 2021 Resolved
If your vessel’s Certificate of Inspection is renewed annually, the marine inspector must check the stings of the safety or relief valves on all pressure vessels, except cargo tanks, at each inspection for certification. The vessel has three air receivers on board with three separate relief valves. There is no record of the relief valves having been tested to their set pressure. Additionally one of the relief valves in the engine room was painted over. Provide reports attesting to the accuracy of the relief valve’s set pressures. 46 CFR 61.10-5(i)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Relief valves for machinery space pressure vessels that was painted over was replaced new.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 18 October 2021 Resolved
Each machinery space must be ventilated to ensure that, when machinery or boilers are operating at full power in all weather including heavy weather, an adequate supply of air is maintained for the operation of the machinery and for the safety, efficiency, and comfort of the crew. The port engine room supply fan is currently not operational. The crew has been opening an access window on the port side of the superstructure to allow air supply to the engine room. 46 CFR 58.01-45
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2021
Resolved 14 January 2022
Resolution: Verified the port engine compartment supply fan had been replaced.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 18 October 2021 Resolved
Drills must, as far as practicable, be conducted as if there were and actual emergency. During the man overboard drill, the crew did not follow the vessel’s station bill located in the Approved Shipboard Safety Management and Contingency Plan. Specifically, the crew did not keep communications with the master, nor did they designate a lookout to monitor the location for the man overboard as stated in the plan. The crew, along with attending marine inspectors, reviewed the station bill and requirements for each crew member during the drill. Corrected on the spot. 46 CFR 199.180(c)
Action required: 10 - Deficiency Rectified
Resolved 18 October 2021
Resolution: Corrected on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 June 2020 Resolved
#1 SSDG low L/O did not shut down the prime mover when tested.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 June 2020
Resolved 12 June 2020
Resolution: Vessel rep provided video of the low L/O shut down working correctly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 June 2020 Resolved
#1 SSDG Overspeed trip did not shut down the prime mover when tested.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 June 2020
Resolved 12 June 2020
Resolution: Vessel rep submitted video of the overspeed trip working correctly.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 12 June 2020 Resolved
Each passenger vessel must have a public address system capable of broadcasting separately or collectively to the following stations:(g) Accommodation spaces and service spaces. Main deck accommodation space does not have a P/A system speaker and cannot be heard when general alarm is activated or announcements are made. Vessel's company shall rectify in a way as the general alarm and P/A system can be heard by passengers in accommodation space when activated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 16 July 2020
Resolution: Company rep submitted pictures of an installed P/A system in the space.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 24 February 2020 Resolved
"All lifesaving appliances and arrangements on passenger vessels must be IAW 46 CFR Subchapter W (Lifesaving Appliances & Arrangements). Weekly inspections and tests: Each survival craft, rescue boat, and launching appliance must be visually inspected to ensure its readiness for use; Each lifeboat engine and rescue boat engine must be run ahead and astern for 3 minutes; The general alarm system must be tested." Upon talking with the master, crew, and company security officer, weekly visual checks of the general alarm, rescue boat and launching appliance, and the 4 on board inflatable liferafts are being done at variable intervals, but not being done at these required weekly intervals. Only logbook entries are seen are at monthly intervals, most two recent entries were 4MAR2020 and 9FEB2020. Conduct weekly visual inspections of all stated lifesaving items & weekly rescue boat engine test and appropriately log, as weekly checks would have identified the 4 liferaft hydrostatic release units were 1 month expired (Feb 2020). Deficiency will stay open for 3 months to be verified at the next quarterly reinspection. Ensure all Masters are aware of this. 46 CFR 70.28-1 and 46 CFR 199.190(d) and (e)
Condition: Invalid
Action required: 705 - Other - as specified
Due 6 June 2020
Resolved 12 June 2020
Resolution: Vessel created a weekly check list for the lifedaving items.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 24 February 2020 Resolved
"Each lifesaving appliance, including lifeboat equipment, must be inspected monthly using the checklists required under paragraph (b)(1)(i) of this section to make sure the appliance and the equipment are complete and in good working order. A report of the inspection, including a statement as to the condition of the equipment, must be recorded in the vessel's official logbook." Upon talking with the master, crew, and company security officer, they stated there are no monthly lifesaving appliance inspection checklists for the rescue boat, rescue boat launching appliance (davit), and 4 inflatable liferafts. Create three separate & detailed checklists to be used for the inspection of these different lifesaving equipment items. Furthermore, the 4MAR2020 and 9FEB2020 logbook entries are related to lifesaving drills, not the actual equipment/inventory checks, ensure this monthly check is conducted and properly logged. Create these checklists and provide them for our review no later than 12MAR2020. 46 CFR 70.28-1 and 46 CFR 199.190(d) and (e)
Condition: Invalid
Action required: 705 - Other - as specified
Due 12 March 2020
Resolved 12 March 2020
Resolution: see narrative
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 11 June 2019 Resolved
Prior to getting this vessel underway all missing void hatch gaskets must be replaced, gaskets that are not serviceable must be replaced as well. Excessive waster is to be removed for the void spaces where a lack of a gasket caused water to enter the space
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 18 June 2019
Resolved 11 June 2019
Resolution: All gaskets replaced as necessary and voids de watered.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 11 June 2019 Resolved
Prior to getting the vessel underway, all sounding tube caps on the main deck must be made usable, currently many cannot be opened and have not been opened for quite some time. Also on the main deck the caps for the bilge and ballast suction valves must be made usable.
Action required: 60 - Rectify deficiencies prior to movement
Due 18 June 2019
Resolved 11 June 2019
Resolution: All tubescaps and valve caps removed, cleaned and operated satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 November 2018 Resolved
Each generator must have an overspeed device that is independent of the normal operating governor and adjusted so that the speed cannot not exceed the maximum speed by more than 15 percent. Port generator overspeed device failed to shutdown engine completely. Generator ran at 600 RPM's (without load) while air shutdown was engaged.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 December 2018
Resolved 3 December 2018
Resolution: Engineers proved proper operation of overspeed device.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 November 2018 Resolved
Each equipment-grounding conductor must be sized in accordance with Section 250.122 of NFPA NEC 2002. STBD generator is missing grounding strap. Install appropriate grounding strap.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 December 2018
Resolved 3 December 2018
Resolution: New grounding strap was installed IAW manufacturers recomendations.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 27 November 2017 Resolved
Crew could not follow the posted instructions. Need to either update the instructions to make it easier to follow or train the crew on the differences on the two different sets of instructions.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 12 January 2018
Resolution: Vessel replaced signage in CO2 room, providing clarity. Conducted walk through with on duty ENG, was knowledgeable in operation and procedures.
Electrical › Electric Supply System (service) › Battery Installation
Issued 27 November 2017 Resolved
Remove fluids in e/r batt install. Repair holed batt box aft of bridge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 12 January 2018
Resolution: Battery box was thoroughly cleaned out.
Engineering › Pressure Vessel › Pressure Gauge
Issued 27 November 2017 Resolved
Replace pressure gauge would not display the MAWP of the pv or the relief valve settings.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 12 January 2018
Resolution: Pressure gauge was replaced with proper guage.
Electrical › Electric Generation Source (service) › Generator
Issued 15 September 2017 Resolved
Stbd SS Generator reported OOC. Prior to placing back in service, MI must attend for partial survey.
Action required: 705 - Other - as specified
Resolved 15 December 2017
Resolution: Attended vessel, all testing of newly installed generator was completed to satisfaction of attending MI.
Engineering › Compressed Air System (control) › Piping
Issued 15 September 2017 Resolved
Shutoff valve installed between electric air compressor and the air reciever, thereby leaving a section of the supply piping unprotected (relief valve on compressor was set higher than the air reciever).
Action required: 705 - Other - as specified
Due 15 October 2017
Resolved 23 October 2017
Resolution: Recieved pictures of the new relief valves installed.
Engineering › Compressed Air System (control) › Piping
Issued 15 September 2017 Resolved
Shutoff valve installed between deisel engine powered air compressor and the air reciever, thereby leaving a section of the supply piping unprotected (relief valve on compressor was set higher than the air reciever).
Action required: 705 - Other - as specified
Due 15 October 2017
Resolved 23 October 2017
Resolution: Recieved pictures of the new relief valves installed.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 15 September 2017 Resolved
High Pressure CO2 bottle for fire-suppression system was stored directly on the deck in the engine room.
Action required: 705 - Other - as specified
Due 18 October 2017
Resolved 18 October 2017
Resolution: Recieved picture of CO2 bottle resting on newly installed evavation grating.
Lifesaving › Lifebuoys › Stowage
Issued 10 March 2017 Resolved
Lifering filled with water. Replace lifering.
Due 10 March 2017
Resolved 10 March 2017
Resolution: Life ring replaced.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 10 March 2017 Resolved
Missing 1 required adult lifejacket from Stbd side forward stowage box - only 49 in box marked for 50. Replace the missing life jacket.
Due 10 March 2017
Resolved 10 March 2017
Resolution: Missing jacket was placed in wrong location - found in midship accomodation space cage - moved back to proper location. All life jacket storage boxes now have correct number of jackets as labels indicate.
Communications › Alarms/Indicators › General Alarm
Issued 10 June 2016 Resolved
Machinery space GA light not working
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2016
Resolution: fixed
Engineering › Bilge Water Management System › Strainer
Issued 10 June 2016 Resolved
no strainer on e/r bilge suction.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 June 2016
Resolution: expanded metal installed.
Engineering › Lubricating Oil Service System › Piping
Issued 18 March 2016 Resolved
1. Repair oil leak on auxiliary engine low oil pressure sending unit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 18 March 2016
Resolution: Resolved prior to completion of the inspection.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.