ARIANE is a 2007 tank ship. The Coast Guard has recorded 44 inspections since 2008, most recently in August 2025, along with 23 deficiencies and 11 operational controls.
Records from 2008 to 2025. Most recent: inspection, 4 August 2025.
- Built
- 2007
- Last inspected
- 4 August 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 23 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9351464 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
D5FO5
941388
Flag
LIBERIA
—
Maury page id
psix-941388
Inspections, by type
…with no type recorded11
Years with a record
13 calendar years (2008–2025)
The 44 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it73784 - Dead Weight, Metric Ton
89344 - Displacement, Metric Ton
42010 - Convention (Subpart B), Gross Ton
22444 - Convention (Subpart B), Net Ton
89344 - Displacement, Metric Ton
42010 - Convention (Subpart B), Gross Ton
22444 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 44
4 August 2025
PSC B
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8196739
9 April 2025
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8109014
15 January 2025
PSC B · COC-TVE Renew · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8062730
10 January 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8060962
25 September 2023
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7792711
7 September 2023
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7786798
7 September 2023
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7786890
31 August 2023
COC-TVE Renew · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7781797
6 August 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7026075
5 August 2020
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7024548
2 November 2019
COC-TVE Renew · ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6846416
18 July 2018
ISPS II Exam · COC-TVE Renew · Ballast Water Examination · COE-Dockside
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6460571
9 October 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6284177
8 July 2017
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6201928
17 April 2017
Deficiency Check · ISPS II Exam · COC-TVE Annual · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6122404
13 July 2016
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5939910
22 April 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5860407
4 April 2016
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5846594
6 August 2014
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4946175
14 May 2014
Deficiency Check · COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4858369
19 February 2012
COE-Dockside
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4245649
19 January 2012
COC-TVE Renew · Ballast Water Examination · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4224351
19 August 2011
COE-Dockside
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4121104
8 August 2011
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4113681
25 January 2011
ISPS I Exam · Ballast Water Examination · COC-TVE Annual
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3928857
24 January 2011
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3928836
30 December 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3920132
13 December 2010
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3909872
13 December 2010
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3913654
10 December 2010
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3908264
12 October 2010
COE-Dockside
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3868618
15 September 2010
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3850606
26 January 2010
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3669946
20 January 2010
MARPOL Annex VI Survey · MARPOL Annex I Examination · COC-TVE Renew · Ballast Water Examination · NPV Safety Exam · MARPOL Annex V Examination · ISPS III Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3666817
12 January 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3662387
12 January 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3684452
11 January 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3664964
9 January 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3661380
21 December 2009
ISPS I Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3653644
28 July 2009
COE-Dockside
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3549080
13 April 2009
COE-Dockside
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3452008
29 March 2009
Ballast Water Examination · MARPOL Annex V Examination · MARPOL Annex I Examination · MARPOL Annex VI Survey · ISPS II Exam · COC-TVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3438689
17 August 2008
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3301917
26 March 2008
PII Safety Exam · MARPOL Annex V Examination · COC-TVE Renew · Ballast Water Examination · ISPS II Exam · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3171470
Deficiency record · 23
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 15 January 2025
Resolved
All the steering gear components and the rudder stock shall be of sound and reliable construction to the satisfaction of the admininstration. PSCO observed emergency steering local control component broken allowing actuating pin to fall out.
74SOLAS(20) II-1/29.2.1
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 15 January 2025
Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirments of a classificationj society. PSCO observed ventilation cable controlling high suction bent by-pass in puump room parted.
74SOLAS(20) II-1/3-1
01 - Certificates & Documentation › 013 - Documents › Conformance Test Report
Issued 15 January 2025
Resolved
Maintenance testing and inspections shall be carried out based on the guidelines developed by the organization and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. PSCO ovserved expired Foam analysis letter date 05JAN2025.
74SOLAS(20) II-2/14.2.2.1
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 15 January 2025
Resolved
Ship shall be designed, constructed and maintained in compliance with structural, mechanical and electrical requirments of classification society. PSCO unable to identify an alarm observced on broken emergency generator display screen.
74SOLAS(20) II-1/3-1
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 January 2025
Resolved
Each lifebuoy shall be marked in block capitals of the Roman alphabet with the name and port of registry of the ship on which it is carrried. PSCO observed 02 Bridge wing lifebouy missing required markings. 74 SOLAS (09)III/7.1.4
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 15 January 2025
Resolved
Before the ship leaves port and at all times durijng the voyage, all life-saving appliances shall be in working order and ready for imediate use. PSCO observed 02 life-rafts on starboard side were inproperly stowed in that thye were tied down to the cradle with rope and as a result, would not have deployed. 74SOLAS(20)II-2/14.2.2.1
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 31 August 2023
Resolved
FIRE PROTECTION SYSTEMS AND FIRE-FIGHTING SYSTEMS AND APPLIANCES SHALL BE MAINTAINED READY FOR USE. PSCO OBSERVED A DELAY IN THE IMMEDIATE ACTIVIATION OF THE EMERGENCY FIRE PUMP BY THE CREW., WHICH WAS ATTRIBUTED TO A MALFUNCTION IN THE FUSE BOX.
74SOLAS(2020 CONS.) II-2/14.1.1
CLEARED DEFICIENCY 31AUG23
08 - Alarms › N/A - No Subsystem › Inert gas alarm
Issued 31 August 2023
Resolved
MAINTENANCE, TESTING AND INSPECTIONS SHALL BE CARRIED OUT BASED ON THE GUIDELINES DEVLOPED BY THE ORGANIZATION AND IN A MANNER HAVING DUE REGUARD TO ENSUREING THE RELIABILITY OF FIRE-FIGHTING SYSTEMS AND APPLIANCES. PSCO OBSERVED DECKSEAL WATER PRESSURE LOW ALARM INOPERABLE.
74SOLAS(2020 CONS.) II-2/14.2.2.2.2.1
CLEARED DEFICIENCY 31AUG23
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 August 2020
Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service which they are intended and shall be so installed and protected as to reduct to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. PSCO conducted damage survey following propulsion irregularity and issue of COTP 339-20 dated 05AUG20. C/E stated prior to departing St. Rose, LA, exhaust temp sensor on #1 ME cylinder was replaced, but found to be faulty and caused reduction in RPMs. #1 ME cylinder exhaust temp sensor has been replaced.
74 SOLAS (2014) II-I/26.1, 10c
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 2 December 2019
Resolved
74 SOLAS(14) II-2/4.5.5.3.2:
THE INERT GAS SYSTEM REFERRED TO IN PARAGRAPH 5.5.3.1 SHALL BE DESIGNED, CONSTRUCTED AND TESTED IN ACCORDANCE WITH THE FIRE SAFETY SYSTEMS CODE.
FSS 15.2.3.1.6.1:
SPECIAL CONSIDERATION SHALL BE GIVEN TO THE DESIGN AND LOCATION OF SCRUBBER AND BLOWERS WITH RELEVANT PIPING AND FITTING IN ORDER TO PREVENT FLUE GAS LEAKAGES INTO ENCLOSED SPACES. PSCO OBSERVED AN ATMOSPHERE IN THE IGG BELOW ACCEPTABLE LIMITS FOR OXYGEN.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 18 April 2017
Resolved
1899: The machinery and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. Manual bypass valve on Inert Gas System was fractured when crew member attempted to operate. The casing surrounding the valve stem broke off. Crew can still operate valve with a wrench. 74SOLAS(14) II-1/26.1 40(ac)
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 17 April 2017
Resolved
The condition of the ship and its equipment shall be maintained to ensure that the ship in all respects will remain fit to proceed to sea without danger to persons onboard. The inert gas plant has a leak in the IG room, creating an unsafe environment for personnel. Carbon monoxide reading from outside the space was measured at 50 ppm. Source of the leak is unknown. 74 SOLAS (14) I/11(a) (60a/c)
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 17 April 2017
Resolved
The inert gas system shall be capable of inerting, purging, and gas-freeing empty tanks and maintaining the atmosphere in cargo tanks with the required oxygen content. The IGG is not operational with re-occurring flame failures. 74 SOLAS (14) II-2/4.5.5.3 (60a/c)
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 4 April 2016
Resolved
0936 - Steering gear - The condition of the ship and its equipment shall be maintained ito confrom with the provisions of the present regulations. The rudder angle indicator in the steering gear room was showing a difference of 5 to 20 degrees compared to the fixed. 74 SOLAS (14) I/11 50a
Deck/Cargo › Inert Gas System › IGS Blower
Issued 19 May 2014
Resolved
1840- Instrumentation- Instrumentation shall be fitted for continuously indicating the oxygen content of the inert gas in the inert gas supply mains on the d/c side of the gas blowers. Oxygen analyzing unit would not stabilize on proper reading. 74 SOLAS(09 CONS) II-2/ 11.6.1
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 14 May 2014
Resolved
1835- Cargo Vent System- Venting arrangements shall be so designed and operated as to ensure that neither pressure nor vacuum in cargo tanks shall exceed design parameters. Flame screens on the vacuum side of PV's were saturated with cargo. 74 SOLAS(09 CONS) II-2/11.6.1
Electrical › Electric Generation Source (emergency) › Ground Detection
Issued 19 January 2012
Resolved
1430 - Auxiliary engines- The condition of the ship and it's equipment shall be maintained. PSCO observed that during testing of the Emergency Diesel Generator that a common ground fault is alarming to the local bus panel. SOLAS 74AM I/11
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 19 January 2012
Resolved
1430-Auxiliary Engines - The condition of the ship and it's equipment shall be maintained. PSCO observed that the 24V/DC charging arrangement for the Emergency Diesel Generator arrangement has been modified from original installation. SOLAS 74 AM I/11
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 15 September 2010
Resolved
Inert gas system was reported by the ship’s crew to not be operating fully and properly during cargo operations.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 20 January 2010
Resolved
High O2 content meter not sending visual or audible alarm for O2 levels exceeding 5% to cargo control room, engine control room, or bridge. Vessel is to provide means for a visual and audible alarm for the oxygen content meter of the inert gas system or provide an alternate safe discharging plan in writing to Coast Guard prior to discharging cargo.
Engineering › Lubricating Oil Service System › Piping
Issued 11 January 2010
Resolved
The main engine cylinder no. 5 lube oil line was air bound causing the vessel to auto slow down in the Lower Mississippi River.
Deck/Cargo › Cargo Stowage › General
Issued 26 March 2008
Resolved
During inspection of cargo tanks (5P, 3P, and 2P), Oxygen levels were above 8%. Using ship's Inert Gas Generator, sweep cargo tanks to bring oxygen levels below 8% prior to conducting cargo operations.
Operations/Management › Cargo Transfer/Lightering › Conducted IAW Vessel Transfer Procedures
Issued 26 March 2008
Resolved
Shipboard logkeeping was inconsistent with what was being sent to Owner in regards to Cargo Tank Inert Gas Report. The report being sent to owner differed from logs being kept by [name withheld] Have attending surveyor from Recognized Safety Management Organization ensure ship is carrying out proper Cargo IG procedures as per Safety Management Plan (5.03).
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.