BETTENDORF is a 1994 towing vessel. The Coast Guard has recorded 7 inspections since 2008, most recently in September 2025, along with 11 deficiencies.
Records from 2008 to 2025. Most recent: inspection, 10 September 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it352 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1980 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 7
10 September 2025Administrative Inspection · Annual Inspection
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 10 September 2025Resolved
Pressure vessels over 5 cubic feet... must be equipped with one or more spring-loaded relief valves....The total relieving capacity of such relief valves must prevent pressure from exceeding the MAWP. The pressure relief valve on pressure vessel in workshop is set to 200 PSI but the MAWP of the vessel is 175 PSI. 46 CFR 143.300(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2025
Resolved 21 January 2026
Resolution: Replaced valves with 175.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 10 September 2025Resolved
A towing vessel must carry a combination of day and night visual distress signals indicated in Table 141.370 of § 141.370 for specified areas where the vessel operates. Vessel operates on rivers route, and is required to carry 3 day and 3 night visual distress signals or 6 acceptable hand held rocket propelled parachute red signals. Vessel only has 2 orange day signals and 3 red parachute signals on-board. 46 CFR 141.370
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2025
Resolved 21 January 2026
Resolution: Procurred new flares
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 September 2025Resolved
A carbon dioxide system... meets the requirements of 46 CFR subpart 76.15...Each control valve to branch lines must be marked to indicate the related space served. Control valve for CO2 system in steering space is not labeled for space served. 46 CFR 136.110
46 CFR 76.15-10(h)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2025
Resolved 21 January 2026
Resolution: Labels identifying pulls for engine room and steering
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 September 2025Resolved
A carbon dioxide system... meets the requirements of 46 CFR subpart 76.15 shall be so mounted as to be readily accessible and capable of easy removal for recharging and inspection.46 CFR 136.110
46 CFR 76.15-20(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2025
Resolved 21 January 2026
Resolution: Removed tool chest from in front of bottles.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 8 August 2024Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. The following alarms must be provided: (5) High bilge levels, and must be visible and audible at each operating station. The vessels high bilge level alarms were audible at the control station. Provide proof of proper operation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 August 2024
Resolved 7 November 2024
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. The following alarms must be provided: (6) Low hydraulic steering fluid levels and Alarms must be visible and audible at each operating station. The vessel does not have low hydraulic steering fluid level alarms installed. Install low hydraulic steering fluid level alarms and provide proof of proper operation.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 August 2024
Resolved 1 October 2024
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 8 August 2024Resolved
Each towing vessel must perform the applicable tests in Table 143.245(b) of this section. Alarm set points Twice every 5 years, with no more than 3 years elapsing. Vessel has not completed required machinery alarm set point testing. Test and submit results.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2024
Resolved 13 November 2024
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 21 June 2023Resolved
Each Fire station must have a spanner wrench. Not all fire stations had a spanner wrench for the connection and disconnection of the fire hoses.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 20 July 2023
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 21 June 2023Resolved
Alarms must be visible and audible at each operating station. The alarm located at the operating station may be a summary alarm; if the alarm at the operating station is a summary alarm, the specific alarm condition must be indicated at the machinery or bilge location. The high water alarm was not audible in the pilot house.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 10 October 2023
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 21 June 2023Resolved
Each towing vessel must be equipped with an industrial type first aid cabinet or kit, appropriate to the size of the crew and operating conditions. The eye wash found on board were expired. Remove and replace.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 20 July 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 June 2023Resolved
All Bilge pumps must be tested at least every 3 months. Vessel had not tested the bilge piping system in the last 3 months. Test bilge pumps and piping capability of pumping water out of voids.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 20 July 2023
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.