Records from 2014 to 2025. Most recent: inspection, 30 December 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 20
30 December 2025
Deficiency Check · Administrative Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8288587
22 July 2025
Annual Inspection · Deficiency Check
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8191961
25 September 2024
Examination of Repairs · Drydock Exam · In-Service Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Kailua Kona · USCG Oceania District (CGD-O) · Activity 8012214
4 June 2024
COI Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 7926625
27 February 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7871223
15 June 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7715432
17 May 2023
Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7690539
22 June 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7483501
28 July 2021
Deficiency Check · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7283748
21 July 2021
Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7261482
24 May 2021
In-Service Inspection · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7214637
24 June 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6724485
4 June 2019
Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6703517
25 April 2019
Administrative Inspection · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6682032
19 July 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6485689
8 May 2018
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6409165
2 August 2017
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6230030
25 April 2017
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6221790
23 August 2016
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6034334
6 June 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5934323
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 22 July 2025
Resolved
A catamaran vessel must be equipped with bilge pumps for each hull, as if each hull is a separate vessel, in accordance with Table 182.520(a). Port engine fixed bilge pump leak observed during operational test. Pump requires repair or renewal. Vessel restricted to carriage of 49 passengers with use of installed submersible electric bilge pumps until pump repaired and operating as intended. 46 CFR 182.520(j)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2025
Resolved 23 July 2025
Resolution: Pump repaired and opeationally tested. All sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 22 July 2025
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction. Starboard forward deck rail stanchion loose at deck plate. Requires repair. 46 CFR 177.900(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2025
Resolved 23 July 2025
Resolution: Deck rail secured and verified. All sat
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 June 2024
Resolved
All fiber reinforced plastic vessels constructed with general purpose resins must be fitted with a smoke activated fire detection system of an approved type installed in accordance with 76.27 in subchapter H of this chapter in accommodation spaces and service spaces. Vessel does not a have smoke activated fire detection system for required spaces. Provide smoke activated fire detection system and install to the satisfaction of the attending marine inspector.
46 CFR 177.410(c)(3)(ii)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 8 July 2026
Resolution: Received documentation verifying smoke detection had been installed on the vessel and cleared deficiency which inspector believed to be an outstanding oversight on behalf of USCG.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 June 2024
Resolved
Electrical equipment on a vessel must be installed to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Starter wires located in port engine room bilge. Remove port wire from engine room bilge.
46 CFR 183.200 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 31 July 2024
Resolution: Wires from engine room bilge removed. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 June 2024
Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Vessel crew did not follow there own Preventative Maintaince Plan and conduct annual turnbuckle head stay inspection. Remove furler and conduct turnbuckle head stay inspection.
46 CFR 176.840
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 31 July 2024
Resolution: Turnbuckle head stay inspected per PMP. PMP updated upon request. All Sat.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 4 June 2024
Resolved
The construction and arrangement of a vessel must allow the safe operations of the vessel in accordance with the terms of the COI giving consideration to provisions for a seaworthy hull, protections against fire, means of escape in case of sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Port forward space ladder is not secured to deck. Make ladder secured.
46 CFR 177.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 31 July 2024
Resolution: Port forward space ladder secured to deck. All sat
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 15 June 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of lifesaving equipment and systems, including the following: Inspection of each hydrostatic release unit to determine that it is in compliance with the servicing and usage requirements of 185.740 of this chapter. Hydrostatic release for EPIRB expired. Install new hydrostatic release.
46CFR176.808(a)(5)
Action required: 10 - Deficiency Rectified
Resolved 15 June 2023
Resolution: Hydrostatic release provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 June 2023
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Windlass not operational. Make windlass operational as designed.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2023
Resolved 29 August 2023
Resolution: New windlass motor installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Dead end wires found in port side fuel compartment. Remove dead end wiring and update electrical plans.
46 CFR 183.200 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2023
Resolved 29 August 2023
Resolution: Dead end wire removed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 June 2023
Resolved
The construction and arrangement of a vessel must allow the safe operations of the vessel in accordance with the terms of the COI. Port and starboard swim steps both have cracking at welds. Make permanent repairs to swim both swim steps.
46 CFR 177.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2023
Resolved 7 August 2023
Resolution: Swim steps reweleded.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 15 June 2023
Resolved
The owner shall be prepared to conduct tests and have the vessel ready for inspection of the following: On a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Vessel does not have a current inventory list in accordance with USCG NVIC 02-16. Provide updated Sail Rig PMP.
46 CFR 176.802 (a)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2023
Resolved 10 July 2023
Resolution: Updated PMP provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2023
Resolved
Electrical equipment on a vessel must be installed to protect the vessel from electrical hazards, including fire. Selector switches for inverters pulled from wall and one cracked. Replace damaged switch and permanently mount both switches.
46 CFR 183.200 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2023
Resolved 10 July 2023
Resolution: New switches mounted.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 June 2022
Resolved
Vessel does not currently meet the requirements of Work Instruction 31. Mandated crew posted on COI may not enter the water or act as lifeguard until policy and procedure provided. Provide written procedure.
46 CFR 176.100(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 21 July 2022
Resolution: Work Instruction 31 Procedures provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 June 2022
Resolved
Each vessel must have permanent draft marks at each end of the vessel or have permanent loading marks placed on each side of the vessel forward and aft to indicate the maximum trim and amidships to indicate the maximum allowable draft. No hull permanent markings on vessel. Provide permanent hull markings IAW stability letter.
46 CFR 185.602
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 13 July 2022
Resolution: Temp marking provided until drydock where perm markings will be provided.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 22 June 2022
Resolved
The name of the vessel must be marked in clearly legible letter on each life float paddle. Vessel name not on paddle. Provide vessel name on paddle.
46 CFR 185.604
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 13 July 2022
Resolution: Provided name of vessel on life flaot paddle
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 22 June 2022
Resolved
The name of the vessel must be marked on each life float. Name not on life float. Provide name on life floats.
46 CFR 185.604
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 13 July 2022
Resolution: Provided vessel name on life float.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 22 June 2022
Resolved
The number of persons capacity must be marked on each life float. Number not on life float. Provide number on life float.
46 CFR 185.604
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 13 July 2022
Resolution: Provided number of persons on life float.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 June 2022
Resolved
Alterations to the equipment that affect the safety of the vessel must not be made without the approval of the [name withheld] circuit installed from start battery to ECM controller without approval. Provide electrical drawings for review and approval to [name withheld].
46 CFR 176.700
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 22 July 2022
Resolution: Electrical circuit removed and system is as electrical drawing shows.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2022
Resolved
A propulsion engine control system must be designed so that a loss of power to the control system does not result in an increase in shaft speed. Electronic propulsion controller installed on vessel. QFA and DVTP not provided and test not completed. Provide QFA and DVTP in accordance with CVC-Policy Letter 17-07 and conduct testing IAW approved QFA and DVTP.
46 CFR 184.620
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 27 February 2023
Resolution: DVTP-QFA provided.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 22 June 2022
Resolved
Spanner wrench must be provided where a 1.5 inch fire hose is required. Spanner wrench not onboard vessel. Provide spanner wrench.
46 CFR 181.310
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 13 July 2022
Resolution: Spanner wrenchs provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 June 2022
Resolved
At each inspection the owner shall be prepared to have the vessel ready for inspection of the hull and chain plates. Space forward of collision bulkhead not made accessible for inspection. Provide video documentation of space and chain plates in space.
46 CFR 176.802
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2022
Resolved 13 July 2022
Resolution: Video of space and chain plate provided. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 July 2021
Resolved
An EAP training program must be conducted for the employer's crewmembers and supervisory personnel. The training program must include at least the following elements: the effects and consequences of drug and alcohol use on personal health, safety, and work environment; the manifestations and behavioral cues that may indicate drug and alcohol use and abuse; and documentation of training given to crewmembers and Supervisory personnel must receive at least 60 minutes of training. Provide proof of completed EAP training for all personnel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2021
Resolved 9 August 2021
Resolution: DER provided proof of training completed for all required personnel.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 21 July 2021
Resolved
A visual indicator must be provided at the operating station to indicate when any auto bilge pump is operating. Indicator was not visible in normal operating conditions. Provide indication that can be seen during normal operations for auto bilge pump at operating station.
46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2021
Resolved 1 September 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 July 2021
Resolved
Life buoy floating water light lanyard must be 3 to 6 feet. Lanyard was much longer than 6 ft. Provide appropriate length ring buoy water light lanyard.
46 CFR 180.70(d)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2021
Resolved 2 August 2021
Resolution: Proper length lanyard provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 July 2021
Resolved
Electrical equipment on a vessel must be maintained. Lighting under stairs port and starboard disconnected, not operational and has dead end wires. Either renew system and ensure that it is on vessel electrical drawing or remove.
46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2021
Resolved 2 August 2021
Resolution: Dead end wires removed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 July 2021
Resolved
Inspection of sail rigging completed. Crack found on starboard upper shroud turnbuckle. Renew/replace cracked turnbuckle. Vessel can still sail with a reefed main sail. Daily inspections of crack length, depth, width must be logged until new turnbuckle installed.
46 CFR 177.330
Action required: 705 - Other - as specified
Resolved 2 August 2021
Resolution: New turnbuckle provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 July 2021
Resolved
Sail Rigging Preventative Maintenance Plan (PMP) not updated with all current configurations. In PMP provide sail plan, description of rig, full rigging inventory, and inspection regime. Ensure to log all inspections in accordance with vessel PMP. Keep copy of PMP on board vessel at all times and submit revised version of PMP to [name withheld] 02-16
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2021
Resolved 1 September 2021
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 4 June 2019
Resolved
Port and stbd engine compartment ventilation closures did not close completely. Prove correct operation in accordance with 46 CFR 176.810(a)(2).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2019
Resolved 24 June 2019
Resolution: Pictures provided showing new latch mechanism the closes dampners completely.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 8 May 2018
Resolved
07109-Fixed gas extinguishing system ready for operation. Stbd eng room system was inadvertently discharged.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 9 May 2018
Resolution: Cylinder renewed.