MAURY USCG vessel records
← All vessels

HARVEY HURRICANE

Built
2009
Last inspected
13 July 2026
Documentation
No record in the NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 2016.

Inspection record

Last inspected 13 July 2026
Operational controls None recorded without a removal date
Years with a record 7 calendar years (2017–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9536246
949504
Flag
MEXICO
Maury page id
psix-949504

Documentation record

Tonnage as PSIX records it1596 - Convention (Subpart B), Gross Ton
1150 - Displacement, Gross Ton
587 - Convention (Subpart B), Net Ton
2800 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 10 inspections, each with its date, unit and type; 29 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 10

13 July 2026 In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8437425
15 April 2025 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8117558
19 November 2024 Deficiency Check · PSC A
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8037189
26 October 2021 In-Service Inspection · Random ISPS/MTSA/PSC
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7339406
16 March 2021 MARPOL Annex I Examination · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7156724
21 November 2019 Administrative Inspection · Internal Structural Exam · Cargo Tank Internal · Drydock Exam · COI Inspection · Examination of Repairs · MTSA/ISPS Verification · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6859737
7 March 2019 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6637496
27 February 2018 Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6362322
6 November 2017 Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6307330
8 February 2017 Deficiency Check · MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6085124

Deficiency record · 29

03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 15 April 2025 Resolved
The ring, lines, and letters shall be painted in white or yellow on a darke background or in black on a light background. They shall be permanently marked on the side of the ship to the satisfaction of the administration. PSCO observed deficiency wasnt rectified prior to the next U.S. port after sailing foreign. This form B supersedes Form B issued on 07JAN2025. ICLL 8
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 April 2025
Resolution: Vessel punched the hull to permanently mark the load line. Vessel also submitted report from recognized organization.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 January 2025 Resolved
The inspection and survey of ships, so far as regards the enforcement of the provisions of the present regulations and the provisions of the present regulations and the granting of exemptions therefrom, shall be carried out by officers of the administration. The administration may, however, entrust the inspections and surveys either to surveyors nominated for the purpose or to organizations recognized by it. Vessel's previous Classification Society Certificate expired 10DEC2024. SOLAS 20 I/6 (a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2025
Resolution: Recieved copy of new Class Certificate.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 7 January 2025 Resolved
The ring, lines and letters shall be painted in white or yellow on a dark background or in black on a light background. They shall be permanently marked on the sides of the ships to the satisfation of the administration. PSCO observed the load lines were not permanently marked. ICLL 8
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 April 2025
Resolution: New Def Issued
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 7 January 2025 Resolved
Oil fuel pipes, which, if damaged, would allow oil to escape from a storage tank, having a capacity of 500L and above situated above a double bottom, shall be fitted with a cock or valve directly on the capable of being closed from a safe position outside the space. PSCO observed remote valve seized in the open position for the tank supplying the emergency generator. SOLAS 74 (2009 cons. ed.) II-2/4.2.2.3.4
Action required: 10 - Deficiency Rectified
Resolved 5 February 2025
Resolution: The remote valve spun freely because of a broken cotter pin connecting it to the reach rod. Vessel personnel replaced cotter pin which re-connected the reach rod with the remote valve.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 26 October 2021 Resolved
04103 – The emergency source of electrical power is a generator it shall be started automatically, connected to emergency switchboard and services shall then be connected automatically to emergency power source. Emergency generator starts but emergency power is not distributed throughout the vessel. 74 SOLAS (04 Cons.) II-1/43.3.1.2 – 17b,c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: verified proper operation of emergency generator and emergency switchboard, and emergency power distribution system.
14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 26 October 2021 Resolved
14108 – Any ship of 400 gross tons and above but less than 10000 gross tonnage shall be fitted with oil filtering equipment complying with paragraph 6 of this regulation oil filtering equipment shall ensure that any oil mixture discharged into the sea after passing through the system has an oil content not exceeding 15ppm. Vessel failed to verify proper operation of the system and components through testing procedures. 73/78 MARPOL (2017 Cons) Annex I/14.1 – 17b,c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Verified calibration of the system, and C/E conducted satisfactory test of the OCM and testing proceedures for proper operation of the OWS and components.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 26 October 2021 Resolved
03110 – Manholes and flush scuttles in position 1 or 2 shall be closed by substantial covers capable of being made weather tight. Daylight was observed from steering room escape hatch when dogs were in fully closed position. ICLL 66/88 part I/ 18.1 – 17bc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Vessel fixed the emergency escape scuttles, it was verified no light was passing through when fully dogged closed.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 16 March 2021 Resolved
Each vessel must be provided with a sound-powered telephone system to communicate between the pilothouse and the steering gear compartment. Sound-powered phone at steering station in engine room was not functional while attempting to communicate to the bridge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 April 2021
Resolved 15 April 2021
Resolution: Vessel Rep emailed copy of Workorders from third party stating that the third party has replaced the soundpowered phone and tested the system satisfactory.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 16 March 2021 Resolved
All ships of 150 GT and upwards are to be fitted with a Bridge Navigational Watch Alert System (BNWAS) whenever the ship is underway. The BNWAS was not functioning at the time of inspection. Third-party technician repaired system in presence of attending MI. 74 SOLAS (14) V/2.2.3
Action required: 10 - Deficiency Rectified
Due 16 March 2021
Resolved 16 March 2021
Resolution: Third-party technician repaired system in presence of attending MI.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 16 March 2021 Resolved
Emergency loads must transfer automatically to the final emergency power source within 45 seconds. The emergency generator automatically started when power was secured to the main generators, however, the final emergency power was not transferred within 45 seconds. Chief Engineer affected repairs in presence of attending MI and was able to demonstrate transfer to the emergency power source an additional (3) times during inspection.
Action required: 10 - Deficiency Rectified
Due 16 March 2021
Resolved 16 March 2021
Resolution: Chief Engineer affected repairs in presence of attending MI and was able to demonstrate transfer to the emergency power source an additional (3) times during inspection.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 November 2019 Resolved
VSL IS REQD TO HAVE TWO FIRE PUMPS. VSL EMERGENCY FIRE PUMP IS INOP. VSL MUST PROVIDE OPERATIONAL EMERGENCY FIRE PUMP. 46CFR132.120
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2020
Resolution: VSL CONTRACTED WITH BOLLINGER SHIPYARD TO FIND THAT A CHECK VALVE HAD BEEN INSTALLED UPSIDE DOWN PREVENTING THE PUMP FROM GETTING FIRE WAD. VALVE WAS TURNED AND ALL TESTS SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 November 2019 Resolved
NONMETALLIC FUEL LINES ARE REQUIRED TO BE SERVICEABLE. STBD SSDG F/O SUPPLY IS DRY ROTTED. VSL MUST PROVIDE SERVICEABLE NONMETALLIC FUEL LINE FOR STBD SSDG. 46CFR56.50-75
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2020
Resolution: Lines were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 November 2019 Resolved
ALL LIFE JACKETS MUST BE IN SERVICEABLE CONDITION. LIFE JACKET LOCATED IN ENGINE ROOM WAS NOT SERVICEABLE. VESSEL MUST PROVIDE A SERVICEABLE LIFE JACKET IN THE ENGINE ROOM. 46CFR133.70
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2020
Resolution: VSL PROVIDED NEW LIFE JACKET.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 November 2019 Resolved
LIFE JACKETS MUST BE PROPERLY STOWED. LIFE JACKET IN RUDDER ROOM WAS LAYING ON DECK. VSL MUST STOW LIFE JACKET IAW SAFETY PLAN. 46CFR133.70
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2020
Resolution: VSL PROVIDED PROPER STOWAGE FOR LIFEJACKET IN STEERING SPACE.
04 - Emergency Systems › N/A - No Subsystem › Low level lighting in corridors
Issued 21 November 2019 Resolved
EMERGENCY LIGHTING IS REQUIRED TO ILLUMINATE EGRESS ROUTES DURING POWER OUTAGES. VSL HAS MULTIPLE EMERGENCY LIGHTS WHICH ARE EXTINGUISHED ON THE 01 AND 02 DECKS. VSL MUST PROVIDE ADEQUATE EMERGENCY LIGHTING FOR EFFECTIVE EGRESS.46CFR129.440
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 January 2020
Resolution: VSL REPLACED ALL EXTINGUISHED E-LIGHTING.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 21 November 2019 Resolved
GENERAL ALARM MUST WORK WHILE VSL IS ON EMERGENCY POWER. VSL'S GENERAL ALARM WAS INOPERABLE ON E-POWER. VSL MUST PROVIDE AN ADEQUATE GENERAL ALARM WHILE VSL IS ON E-POWER. 46CFR112.15-1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 January 2020
Resolution: VSL REPLACED A FAULTY FUSE. GENERAL ALARM TEST SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2019 Resolved
ELECTRICAL CONNECTIONS ARE REQUIRED TO BE PROTECTECTED FROM ACCIDENTAL CONTACT. BATTERY CHARGER AND BATTERY LEADS IN EDG SPACE ARE EXPOSED. VSL MUST PROVIDE PROTECTION FROM ACCIDENTAL CONTACT. 46CFR111.05-3
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 January 2020
Resolution: VSL COVERED ELCTRICAL CONNECTIONS
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2019 Resolved
BATTERIES ARE REQUIRED TO BE ADEQUATELY SECURED. BATTERIES LOCATED ON 01 DECK ARE NOT SECURED AND EXPOSED TO THE ELEMENTS. VSL MUST SECURE BATTERIES. 46CFR129.350
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 January 2020
Resolution: VSL PROVIDED NEW STRAPS TO SECURE BATTERIES.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2019 Resolved
THERE MUST BE A MEANS OF GROUND DETECTION AT A CENTRALIZED MONITORING POSITION FO RTHE CIRCUIT AFFECTED. VSL'S 24V SYSTEM GROUND DETECTION SYSTEM IS INOP. VSL MUST PROVIDE AN OPERATIONAL GROUND DETECTION SYSTEM. 46CFR111.05-23
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 January 2020
Resolution: ALL GROUND DETECTION TESTS ARE OPERATIONAL FOR ALL THREE GENERATORS.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 7 March 2019 Resolved
Rescue boat davit wire rope was replaced and a load test was not witnessed by Coast Guard. Conduct load test in presence of CGMI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 March 2019
Resolution: Witnessed davit weight test.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 7 March 2019 Resolved
Fond several wasted wires and inadequate enclosures on rescue boat davit. Provide serviced winch and davit to satisfaction of attending CMGI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 March 2019
Resolution: Provided serviced winch and davit.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 March 2019 Resolved
Found C02 hose to paint locker wasted. Provide proper hose.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 March 2019
Resolution: Provided new hose for C02 extinguisher.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 March 2019 Resolved
Found life buoy with wasted plub. Provide approved life buoy.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 March 2019
Resolution: Provided new life buoy.
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 27 February 2018 Resolved
Embarkation light not working on emergency power
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 4 April 2018
Resolved 2 March 2018
Resolution: see attached document
Lifesaving › Rescue Boat › Propulsion Engine
Issued 8 February 2017 Resolved
Prove proper operation of rescue boat engine and conduct Man Overboard drill.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 February 2017
Resolved 10 February 2017
Resolution: Witnessed proper operation of rescue boat engine and satisfactory man overboard drill.
Electrical › Electrical Distribution System (emergency) › Switchboard
Issued 8 February 2017 Resolved
Prove proper operation of ammeter on emergency switchboard.
Action required: 705 - Other - as specified
Due 10 February 2017
Resolved 10 February 2017
Resolution: Witnessed satisfactory operational test of ammeter.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 8 February 2017 Resolved
Adjust self closing doors on O-2 deck and main deck to full close.
Action required: 705 - Other - as specified
Due 10 February 2017
Resolved 10 February 2017
Resolution: Doors adjusted to close properly.
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 8 February 2017 Resolved
Prove proper operation of fuel transfer pump and emergency shutoff.
Action required: 705 - Other - as specified
Due 10 February 2017
Resolved 10 February 2017
Resolution: Witnessed proper operation of fuel transfer pump and emergency shutoff.
Engineering › Pressure Vessel › Pressure Gauge
Issued 8 February 2017 Resolved
Provide appropriate gauge for air receivers.
Action required: 705 - Other - as specified
Due 10 February 2017
Resolved 10 February 2017
Resolution: Guages of proper scale installed.