Records from 2016 to 2026. Most recent: inspection, 23 March 2026.
Inspection history · 16
23 March 2026
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8330307
13 March 2025
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8093478
12 March 2025
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8093745
20 February 2025
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8082179
29 July 2024
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7969900
2 May 2022
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7442089
18 November 2021
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7353863
11 February 2021
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7139678
11 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7110452
15 July 2019
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6751263
8 July 2019
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6742569
16 May 2018
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6415996
8 June 2017
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6169268
5 June 2017
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6166518
1 June 2017
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6161098
28 June 2016
In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5909079
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 July 2019
Resolved
EACH VESSEL MUST HAVE FIRE HOSES IAW 181.320; VESSEL'S FIRE HOSE RUPTURED, BECOMING NON FUNCTIONAL; REPLACE FIRE HOSE TO THE SATISFACTION OF THE COAST GUARD PRIOR TO DEPARTURE.
Action required: 60 - Rectify deficiencies prior to movement
Due 17 July 2019
Resolved 23 July 2019
Resolution: Vessel replaced fire hose
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 15 July 2019
Resolved
AT EACH INITIAL AND SUBSEQUENT INSPECTION FOR CERTIFICATION, THE OWNER OR MANAGING OPERATOR MUST BE PREPARED TO CONDUCT TEST AND HAVE THE VESSEL READY FOR INSPECTION OF ITS FIRE PROTECTION EQUIPMENT, INCLUDING:INSPECTION AND TESTING OF ALL SMOKE AND FIRE DETECTION SYSTEMS, INCLUDING SENSORS AND ALARMS;VESSEL MISSING THREE MODULAR SMOKE DETECTING UNITS; REPLACE MISSING UNITS TO THE SATISFACTION OF THE COAST GUARD WITHIN TWO WEEKS.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2019
Resolved 23 July 2019
Resolution: Vessel replaced fire detectors
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 15 July 2019
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2019
Resolved 23 July 2019
Resolution: Vessel replaced and installed new gaskets
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 July 2019
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 August 2019
Resolved 18 July 2019
Resolution: Vessel replaced first aid kit
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 15 July 2019
Resolved
ON A VESSEL THAT HAS A LOAD LINE, THE AMIDSHIPS MARKS REQUIRED BY PARAGRAPH (c)(2) OF THIS SECTION MUST BE THOSE REQUIRED BY THE INTERNATIONAL CONVENTION ON LOAD LINES 1996; VESSEL DID NOT HAVE DECK LINE; ADD DECK LINE IAW 46CFR185.602(e) TO THE SATISFACTION OF THE COAST GUARD WITHIN 30 DAYS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 August 2019
Resolved 23 July 2019
Resolution: Vessel painted deck line
05 - Radio Communications › N/A - No Subsystem › Performance standards for radio equipment
Issued 15 July 2019
Resolved
EACH VESSEL MUST BE EQUIPPED WITH A PUBLIC ADDRESS SYSTEM IAW 184.610(b); VESSELS PUBLIC ADDRESS SYSTEM DID NOT OPERATE PROPERLY; REPAIR IAW 46CFR184.610(b) TO THE SATISFACTION OF THE COAST GUARD WITH IN 30 DAYS
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 August 2019
Resolved 18 July 2019
Resolution: Vessel replaces mic on PA system
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 July 2019
Resolved
Ensure proper operation of fuel oil tank remote shutdown valve.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2019
Resolved 15 July 2019
Resolution: Inspector witnessed proper operation
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 July 2019
Resolved
Ensure proper operation of bilge valve and reach rod in forepeak.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2019
Resolved 15 July 2019
Resolution: Inspector witnessed proper operation
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 16 May 2018
Resolved
Flame shields non-existent.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 3 July 2018
Resolution: Parts were replaced.
Engineering › Diesel Engine (propulsion-electric) › Piping (exhaust)
Issued 16 May 2018
Resolved
All four main engines had exhaust leaks
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 3 July 2018
Resolution: Exhaust leak was corrected and lagging was replaced.