Records from 2010 to 2025. Most recent: inspection, 5 September 2025.
Documentation record
Registered dimensions (L × B × D)51.0 ft × 22.0 ft × 8.0 ft
Registered tonnagegross 75 / net 60
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSERODINO INC · GUILD, TN, UNITED STATES · built 2008
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeBox
Hull configurationMonohull
Hailing portCOVINGTON, KY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 1 December 2025 · expires 31 December 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it75 - Simplified, Gross Ton
60 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
5 September 2025
Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8215582
29 August 2024
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7992590
12 August 2024
Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7955751
27 July 2023
Hull Examination · COI Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7753438
9 August 2022
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7528948
10 August 2021
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7282490
27 August 2020
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7044445
21 August 2019
Deficiency Check · Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6791232
24 April 2019
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6691366
31 October 2018
Damage Survey
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6571844
5 September 2018
Deficiency Check
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6532750
27 July 2018
Initial Certification · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6492098
23 March 2017
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6123025
9 October 2015
Industry Initiated Exam
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 5739825
2 August 2012
Industry Initiated Exam
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4400003
14 February 2012
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4244313
4 January 2012
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4221392
24 March 2010
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3702482
17 February 2010
Industry Initiated Exam
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3681243
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 August 2022
Resolved
Vessel has a permanent battery trickle charger connected the battery using a extension cord. Extension cord must not be used as a permanent connection to a source of electrical power. Hard wire trickle charger so the is does not rely on a temporary extension cord to the satisfaction of the attending Coast Guard marine inspector.
Action required: 10 - Deficiency Rectified
Resolved 9 August 2022
Resolution: Received objective evidence charger was hard wired.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 August 2021
Resolved
Fire pump was leaking water from seal into bilge. Pump produced satisfactory pressure but requires maintenance in order that pressure is not reduced in the future. Each towing vessel must have a self primming fire pump, fire main and nozzles. Repair fire pump leak to the satisfaction of the attending Coast Guard Marine Inspector. Maintain portable fire pump onboard until repair of main fire pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 August 2021
Resolved 17 August 2021
Resolution: Received objective evidence fire pump is in normal operating condition.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 August 2021
Resolved
Port life buoy floating electric water light was extinguished. At least two lifebuoys on a towing vessel greater than 26 ft must be fitted with a floating electric water light in accordance with 161.010. Repair to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 10 - Deficiency Rectified
Due 10 August 2021
Resolved 10 August 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 August 2020
Resolved
Vessel was missing 4 out of 10 required PFD's. Master and compliance officer could not explain why the PFD's were removed. Provide 4 PFD's to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 August 2020
Resolution: MI verified 10 PFD's onboard.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 27 August 2020
Resolved
Steering gear was missing three bolts. Two missing bolts on linkage flanking rudders and one on main rudders. Install new bolts to the satisfaction of the attending Coast Guard Marine inspector
Action required: 10 - Deficiency Rectified
Due 27 August 2020
Resolved 27 August 2020
Resolution: MI observed installation of steering gear linkage bolts.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 27 August 2020
Resolved
Conducted test of ships installed fire pump with negative results. Fire pump was running but not sucking water or producing water at the hose nozzle. Conduct repairs on fire pump to the satisfaction of the attending Coast Guard marine inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 August 2020
Resolution: MI observed fire pump operational and discharge of seawater at the hose nozzle. Master stated the pump had been shut down improperly with led to the pump not being primed on start up.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 August 2019
Resolved
MI observed oil leak on the outboard aft end of starboard main engine. Oil leak originated from the the valve cover and was dripping into bilge. All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid. Make repairs to the satisfaction of the attending Coast Guard Marine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2019
Resolved 4 September 2019
Resolution: Received technical report from Cummins attesting to the repair of the valve cover leak
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 31 October 2018
Resolved
Starboard main rudder stock sheared off. Cross section showed evidence of cracks from earlier even.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 31 October 2018
Resolved 31 October 2018
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 27 July 2018
Resolved
Ensure that hydraulic hoses in steering system are arranged to prevent chaffing from moving steering system.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 September 2018
Resolved 5 September 2018
Resolution: Replaced hydraulic hoses, installed chaffing gear throughout steering system
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 27 July 2018
Resolved
A towing vessel must carry a combination of 3 day and 3 night visual distress flares. However, IAW with USCG D8 Towing Vessel Inspections Field Notice D8-TVIFN 18-1, enforcement of this requirement is delayed.
Action required: 705 - Other - as specified
Resolved 4 September 2019
Resolution: Flares on Board
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 July 2018
Resolved
Remove wire from port side lifebuoy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 September 2018
Resolved 5 September 2018
Resolution: Wired removed no further issues.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 27 July 2018
Resolved
Shaft-alleys on port and starboard sides are retaining grease from shaft which could potentially be pumped overboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 September 2018
Resolved 5 September 2018
Resolution: Removed grease, cleaned and santitized area to prevent pollution dishcharge overboard.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 27 July 2018
Resolved
Fire pumps must be capable of being energized remotely from a safe place outside the engine room and at the pump.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 September 2018
Resolved 5 September 2018
Resolution: New switch installed fire pump operable inside and outside engine room.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 27 July 2018
Resolved
A remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. Center tank pull cable is detached.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 September 2018
Resolved 5 September 2018
Resolution: Center tank cable reattached, cable fully operational.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 27 July 2018
Resolved
Essential systems as defined by 136.110 (dewatering) and all systems included in this definition must be tested at least every 3 months. The tests required by this section must be recorded in accordance with part 140 of this sub-chapter. Prpose effective way to test fixed bilge pumping system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 September 2018
Resolved 5 September 2018
Resolution: Test logs onboard and upto date.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 27 July 2018
Resolved
Vessel must carry adequate and up-to-date charts, maps, and nautical publications for the intended voyage. Charts, including electronic charts acceptable to the Coast Guard, of appropriate scale to make safe navigation possible.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 September 2018
Resolved 5 September 2018
Resolution: All required Navigation Charts and publications onboard.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 27 July 2018
Resolved
Must be equipped with an industrial type first aid cabinet or kit, appropriate to the size of the crew and operating conditions. Remove expired items from cabinet.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 September 2018
Resolved 5 September 2018
Resolution: Adequate first aid kit on board, all items in date.