63 - Regulatory (Subpart C or D), Net Ton
93 - Regulatory (Subpart C or D), Gross Ton
Maury page id
psix-95524
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 March 2025Resolved
A towing vessel of at least 26 feet, but less than 79 feet, in length must carry a minimum of two lifebuoys located on opposite sides of the vessel where personnel are normally present. Lifebuoys must be at least 610 millimeters (24 inches) in diameter.(b) Each lifebuoy on a towing vessel must:
(1) Be approved under approval series 160.050 or 160.150;
(2) Be capable of being rapidly cast loose; Life ring is difficult to remove from aft station.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2025
Resolved 6 March 2025
Resolution: Crew modified life ring brackets for easy release.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 March 2025Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. Fuel shut off valves would not fully closed.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2025
Resolved 6 March 2025
Resolution: Cable connection and valve was serviced. Tested sat.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 22 February 2024Resolved
Each towing vessel operating in oceans and coastwise service must have a line throwing appliance approved under approval series 160.040. Vessel is required to have four rocket projectiles. Vessel only has 01.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2024
Resolved 1 April 2024
Resolution: Owner/Operator purchased 03 more line throwing devices.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 22 February 2024Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. The following alarms must be provided:High bilge levels;Be visible and audible at each operating station. The alarm located at the operating station may be a summary alarm; if the alarm at the operating station is a summary alarm, the specific alarm condition must be indicated at the machinery or bilge location;bilge alarms do not sound on the bridge.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2024
Resolved 7 March 2024
Resolution: MI witnessed proper operation of alarms.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 February 2024Resolved
(b) Pressure vessels must be externally examined annually. Relief valves must be tested in accordance with § 143.245. Crew was unable to test relief valve IAW 143.245.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2024
Resolved 7 March 2024
Resolution: MI witnessed proper testing of relief valves.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 February 2021Resolved
A 40-B portable fire extinguisher must be located near the storage room or cabinet used for the storage of flammable or combustible products. Additionally, the vessels TSMS states that an extinguisher shall be located within 5 feet of the cabinet The vessel does not have any fire extinguishers located near the flammable/combustible storage locker.
46CFR142.225(d)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 March 2021
Resolved 26 February 2021
Resolution: Operator purchased and installed correct fire extinguisher. Photograph provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 February 2021Resolved
Each lifebuoy with a floating electric water light must have a lanyard of at least 3 feet in length, but not more than 6 feet, securing the water light around the body of the lifebuoy. All three of the vessels ring life buoys have lanyards from the floating lights to the ring life buoys that are frayed and wasted. Replace all 3 frayed lanyards.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 March 2021
Resolved 26 February 2021
Resolution: Operator ppurchased line and attached to the floating electric lights. Picture provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 February 2021Resolved
If the marine inspector finds deficiencies or finds that a major change to the vessel has occurred, he or she will conduct a more detailed inspection to ensure that the vessel is in satisfactory condition and fit for the service for which it is intended. Unauthorized temporary repairs to the trunk leading to the forepeak hatch cover and to the starboard engine room ventilation duct. Submit repair proposal to be reviewed and approved by attending USCG marine inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 March 2021
Resolved 26 February 2021
Resolution: Operator provide photographs of the new vent bell replacment fan and ventilation duct repair. Also, provided photgraphs of forepeak hatch repair.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 February 2021Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. A conductor in the engine room has been spliced in several locations utilizing twist connections. Conductors shall be of adequate size and permanent connections shall be made that prevent the risk of exposure.
46CFR143.400(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 March 2021
Resolved 26 February 2021
Resolution: Operator intalled a new full length conductor that was not spliced. Photographs provided.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 2 February 2021Resolved
The emergency duties and duty stations required by this section must be posted at each operating station and in a conspicuous location in a space commonly visited by crewmembers. The emergency duties list does not cover the duties for man overboard.
46CFR140.405(b)(5)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 March 2021
Resolved 31 March 2021
Resolution: Operator provided a photograph of the new station bill posted.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 2 February 2021Resolved
The master of a towing vessel must ensure that drills are conducted and instructions are given to ensure that all crewmembers are capable of performing the duties expected of them during emergencies. This includes recovering persons from the water. Vessel’s crew failed to demonstrate proficiency in responsibilities during a man overboard drill. Briefed crew and repeated drill. After reviewing procedures crew was able to conduct a satisfactory drill.
46CFR140.420(a)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 2 February 2021
Resolved 2 February 2021
Resolution: Vessels crew discussed their roles and repeated the drill satisfactory.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 2 February 2021Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. The aft emergency fuel shutoff failed to function properly and was repaired by the crew while USCG marine inspectors were onboard.
46CFR143.260(b)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 2 February 2021
Resolved 2 February 2021
Resolution: Rectified on the spot by vessels crew.