Records from 1995 to 2026. Most recent: inspection, 29 July 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 57
29 July 2026
Type not recorded
No type recorded · USCGC OLIVIA HOOKER (WPC 1161) · USCG Heartland District (CGD-H) · Activity 8450551
30 April 2026
Administrative Inspection · Drydock Exam · Vessel Attendance · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8321174
20 May 2025
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8126896
14 May 2024
COI Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7912495
24 April 2024
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7900927
16 April 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7896434
23 May 2023
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7712686
16 June 2022
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7478986
1 December 2021
Administrative Inspection · Drydock Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7360271
26 March 2021
Administrative Inspection · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7162547
3 February 2021
Administrative Inspection · Drydock Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7135115
9 March 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6923056
1 May 2019
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6674072
26 March 2019
Hull Examination · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6649722
23 February 2018
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6360645
7 August 2017
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6233544
19 May 2017
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6150415
25 February 2017
Internal Structural Exam · Hull Examination · Examination of Repairs · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6094530
4 March 2016
DAPI Audit · COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5826900
28 August 2014
Type not recorded
No type recorded · Station Pensacola · USCG Heartland District (CGD-H) · Activity 4968518
25 June 2014
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4899559
29 May 2014
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4859511
21 May 2012
Deficiency Check · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4317389
31 January 2011
Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3936229
15 January 2009
Deficiency Check · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3386258
29 May 2008
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3221014
15 April 2008
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3168956
30 May 2007
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2944569
17 May 2007
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2927100
5 April 2007
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2902471
3 January 2007
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2849303
21 March 2006
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2608342
21 February 2006
COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2560818
21 March 2005
Annual Inspection · Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2315883
27 September 2004
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2206237
19 February 2004
Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2009797
20 February 2003
Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1739456
7 November 2002
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1694065
21 February 2002
Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1484066
5 June 2001
Inclining Experiment
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1458897
30 March 2001
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1060030
8 February 2001
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1058539
8 February 2001
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1058656
3 March 2000
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1046481
17 February 2000
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 815427
15 February 2000
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1381792
9 February 1999
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1408249
11 December 1998
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1397031
16 October 1998
Drydock Extension
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1450212
3 March 1998
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 774911
11 February 1998
COI Inspection · Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1416643
24 March 1997
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1425885
25 November 1996
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 872087
21 October 1996
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1367934
29 March 1996
Re-Inspection · Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1409476
12 April 1995
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1178256
27 March 1995
Hull Examination · Initial Certification · Plan Review "T" Boat
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1460775
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 16 April 2024
Resolved
Vessel's COI has been revoked due to being past dry dock date
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2024
Resolution: COI inspection complete
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 23 May 2023
Resolved
Crew members were not listed as being part of the random drug testing through vessel's drug consortium.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 June 2023
Resolved 26 June 2023
Resolution: Received satisfactory documentary evidence; vsl cleared.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 March 2021
Resolved
Fixed fire detection system is not securing the starboard diesel engine when tested as required. Show proper operation of the fire detection system and provide service report.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 March 2021
Resolved 26 March 2021
Resolution: Fixed fire detection system repaired, burn wire from system being in override since last Coast Guard inspection. Additionally, one of the relays in the system was nonoperational. Service report is in documents.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 26 March 2021
Resolved
Life jackets have worn reflective tape. Renew life jacket reflective tape or replace life jacket.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 March 2021
Resolved 26 March 2021
Resolution: Replaced worn reflective tape with SOLAS grade reflective tape.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 26 March 2021
Resolved
Life floats have worn reflective tape and grab lines show signs of dry rotting. Replace tape and grab lines or replace floats in kind.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 March 2021
Resolved 26 March 2021
Resolution: Life floats were replaced in kind.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 26 March 2021
Resolved
DAPI Letter with crewmembers enrolled is not available. Provide list with crewmembers enrolled.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 April 2021
Resolved 1 April 2021
Resolution: Documentary evidence with letter sent from gulf south resources verifying enrollment.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 26 March 2021
Resolved
Alcohol strips are expired. Provide alcohol strips that are not expired.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 April 2021
Resolved 6 April 2021
Resolution: Documentary evidence submitted with new alcohol test strips.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 3 February 2021
Resolved
Vessel must undergo a drydock examination and internal structural examination at least once every two years. Vessel did not complete drydock and internal structural examination by the date listed on the COI, 31JAN21. Vessel shall not operate until a complete examination has been conducted by a CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2021
Resolution: Vessel completed drydock examination satisfactorily.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 22 May 2019
Resolved
Coast Pilot and Light list are out of date. Provide updated publications.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 31 May 2019
Resolution: Received picture of publications
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 22 May 2019
Resolved
EPIRB not currently operational. Provide functional EPIRB with applicable NOAA registration. Without operational EPIRB vessel is restricted to 3NM from shore.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 31 May 2019
Resolution: Received picture of EPIRB and registration
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 26 March 2019
Resolved
Vessel drydock date has passed. Vessel must complete a hull examination once every two years prior to the exam drop-dead date of 31JAN of the exam year as listed on the COI. Vessel shall not carry passengers until the hull examination is completed. Vessel may transit to Nelson's Boatyard for haul-out.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 April 2019
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 11 April 2018
Resolved
Gauges to provide L/O pressure must be provided for both main engines.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2018
Resolved 23 May 2018
Resolution: Gauges work as designed
Electrical › Electric Supply System (service) › Cable
Issued 11 April 2018
Resolved
Install proper cable gland for the live well motor in the E/R
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2018
Resolved 23 May 2018
Resolution: Cable gland installed
Communications › Radio Communications › VHF Radiotelephone
Issued 11 April 2018
Resolved
VHF-DSC radios must have GPS capabilities or be connected to an electronic position fixing device.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2018
Resolved 23 May 2018
Resolution: Installed new radio; ALL SAT
Operations/Management › Drills/Instruction › Not Conducted
Issued 22 June 2017
Resolved
Conduct drills and log accordingly, IAW 46CFR185.420
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2017
Resolved 7 August 2017
Resolution: Drills and logs are now being logged accordingly.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 22 June 2017
Resolved
Test and log EPIRB IAW 46 CFR 184.502
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2017
Resolved 7 August 2017
Resolution: EPIRB is now being tested and logged monthly.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 22 June 2017
Resolved
Mount EPIRB IAW 46 CFR 185.604
Action required: 705 - Other - as specified
Due 15 July 2017
Resolved 7 August 2017
Resolution: EPIRB is mounted.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 22 June 2017
Resolved
Attach one water light to life float IAW 46 CFR 185.604
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 July 2017
Resolved 7 August 2017
Resolution: Waterlight is attached to the body of the lifefloat.
Lifesaving › Lifefloat › Paddle
Issued 22 June 2017
Resolved
Label life float paddles with vessels name IAW 46 CFR 185.604
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 July 2017
Resolved 7 August 2017
Resolution: Lifefloat paddles are labeled and lashed to lifefloats.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 22 June 2017
Resolved
Relabel life jackets stowage IAW 46 CFR 180.78
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 July 2017
Resolved 7 August 2017
Resolution: Life jacket stowage has been properly relabeled.
Operations/Management › Navigation Safety › Proper Use of Navigation/Anchor Lights
Issued 22 June 2017
Resolved
Make anchor light operable IAW 46 CFR 183.420
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2017
Resolved 7 August 2017
Resolution: Anchor light is operable.
Fire Fighting › Structural - A Class Divisions › Windows
Issued 4 May 2017
Resolved
Repair window in starboard parlor IAW 46 CFR 176.800
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 June 2017
Resolved 23 May 2018
Resolution: Resolved
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 28 March 2016
Resolved
FCC Safety Radio Certificate expired. Provide current document IAW 46 CFR 184.502.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 18 April 2016
Resolution: New Safety Radio cert provided.
Documentation › Certificates/Documents › FCC SSL
Issued 28 March 2016
Resolved
Copy of FCC Station License onboard. Provide original IAW 46 CFR 184.502.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 18 April 2016
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Engineering › Generator (propulsion-electric) › Circuit Breaker (overload/over current protection)
Issued 28 March 2016
Resolved
GENs not labeled as DERATED. Mark as DERATED to 80% IAW 46 CFR 183.320.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 19 April 2016
Resolution: Derated stickers on generator.
Stability › Watertight Integrity › General
Issued 28 March 2016
Resolved
Worn gasket on laz hatch cover. Replace IAW 46 CFR 171.124.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 18 April 2016
Resolution: Replaced gasket.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 28 March 2016
Resolved
Emergency hatch not labeled. Mark outside of hatch "EMERGENCY EXIT, KEEP CLEAR" IAW 46 CFR 185.606.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 18 April 2016
Resolution: Hatch properly labeled.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 28 March 2016
Resolved
STBD RPM guage inoperable. Make operable IAW 46 CFR 182.410.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 18 April 2016
Resolution: Verified proper operation of RPM gauges.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 28 March 2016
Resolved
No evidence of EAP trng onboard. Provide documentation IAW 46 CFR 16.401.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 19 April 2016
Resolution: Certificate of training provided.
Electrical › Electric Generation Source (service) › Generator
Issued 29 May 2014
Resolved
Generator windings and starboard alternator were covered in oil and required to be cleaned due to fire hazard. per 46 CFR 183.200(d)
Action required: 705 - Other - as specified
Due 29 June 2014
Resolved 25 June 2014
Resolution: Generator windings and alternator were cleaned and free of oil residue.
Engineering › Fuel Oil Service System › Hose
Issued 29 May 2014
Resolved
Replace unserviceable fuel hoses on both port and starboard MDE's with approved hoses. per 46 CFR 182.720(e)
Action required: 705 - Other - as specified
Due 29 June 2014
Resolved 25 June 2014
Resolution: Unserviceable hoses were replaced with approved hoses.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 29 May 2014
Resolved
Provide current charts for area of operation, provide current nautical publications to include light list, tide tables, and current tables per 46 CFR 184.420; extracts from the publications for the area to be transited is authorized.
Action required: 705 - Other - as specified
Due 29 June 2014
Resolved 25 June 2014
Resolution: Provided current charts and nav pubs for area of operation.
Operations/Management › Casualty Reporting/Post-Casualty Actions › Determination of Alcohol/Drug Use
Issued 29 May 2014
Resolved
Due to area of operation, provide valid means to test for alcohol post serious marine incident per 46 CFR 16.
Action required: 705 - Other - as specified
Due 29 June 2014
Resolved 25 June 2014
Resolution: Vessel had two valid alcohol test strips onboard.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 21 May 2012
Resolved
Replace cracked water tight cover in way of the starboard side emergency fuel shutoff IAW 46 CFR 179.360.
Condition: Damaged By Earlier Event
Due 23 June 2012
Resolved 19 June 2012
Resolution: Replaced cover
Operations/Management › Equipment Service/Testing › EPIRB
Issued 21 May 2012
Resolved
Provide a NOAA registration for the installed EPRIB IAW 46 CFR 185.604.
Due 23 June 2012
Resolved 19 June 2012
Operations/Management › Equipment Service/Testing › EPIRB
Issued 21 May 2012
Resolved
Relocate EPRIB to a float free position from under the installed canopy IAW 46 CFR 185.730 and 180.64
Due 23 June 2012
Resolved 19 June 2012
Resolution: EPIRB relocated to a float free position aft of canopy
Lifesaving › Lifeboat Equipment › First Aid Kit
Issued 21 May 2012
Resolved
Replace all expired contents in the provided first aid kit IAW 46 CFR 179.360.
Due 23 June 2012
Resolved 19 June 2012
Resolution: Replaced with new first aid kit
Lifesaving › Lifebuoys › Serviceable
Issued 21 May 2012
Resolved
Replace and repair the life ring due to the deteriorated retro tape and missing plug IAW 46 CFR 180.70
Due 23 June 2012
Resolved 19 June 2012
Resolution: Repaired plug with marine grade adhesive and applied new retro reflective tape
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 21 May 2012
Resolved
Replace the expired battery in the float light provided for the life float IAW 46 CFR 180.175
Due 23 June 2012
Resolved 19 June 2012
Resolution: Replaced battery with new one that expires June 2014
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 21 May 2012
Resolved
Make repairs to the stern light to replace the missing lens and prove proper operation IAW 72 COLREGS.
Due 23 June 2012
Resolved 19 June 2012
Resolution: Replace stern light with brand new one of a different model
Engineering › Freshwater System (jacketwater cooling) › Valve
Issued 15 January 2009
Resolved
Replace valve handle on generator cooling water intake valve
Action required: 705 - Other - as specified
Due 15 February 2009
Resolved 21 January 2009
Resolution: The valve handle was replaced.
Construction/Loadline › Hull › Transverse Frame
Issued 15 January 2009
Resolved
Prove structural integrity of the second frame aft of the forward engine room bulkhead on the starboard side.
Action required: 705 - Other - as specified
Due 15 February 2009
Resolved 21 January 2009
Resolution: The frame is structural sound.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 15 April 2008
Resolved
Prove operation of the fire boy's engine shut down system as per 46 CFR 181.420.
Due 15 May 2008
Resolved 29 May 2008
Lifesaving › Lifefloat › Serviceable
Issued 15 April 2008
Resolved
Repair the coating on the life float as per 46 CFR 180.200.
Due 15 May 2008
Resolved 29 May 2008
Engineering › Bilge Water Management System › Interface Detector
Issued 15 April 2008
Resolved
Prove operation of the light for the lazarette bilge high level alarm as per 46 CFR 182.530.
Due 15 May 2008
Resolved 29 May 2008
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 15 April 2008
Resolved
Provide an approved first aid kit as per 46 CFR 184.710.
Due 15 May 2008
Resolved 29 May 2008
Navigation › Piloting/Steering › Magnetic Compass
Issued 16 April 2007
Resolved
Provide light for the magnetic compass in accordance with 46 CFR 184.402.
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 17 May 2007
Resolution: Provided a light for the magentic compass in accordance with 46 CFR 184.402.
Communications › Radio Communications › EPIRB
Issued 16 April 2007
Resolved
Relocate the epirb in order to provide a float free arrangement in accordance with 46 CFR 180.64.
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 17 May 2007
Resolution: Relocated the EPRIB in order to provide a float free arrangement in accordance with 46 CFR 180.64.
Engineering › Sea-water System (primary cooling) › Piping
Issued 16 April 2007
Resolved
Provide insulation for exhaust piping on both engines up to the water injection ports in accordance with 46 CFR 182.425.
Action required: 705 - Other - as specified
Due 1 June 2007
Resolved 30 May 2007
Resolution: Provided insulation for exhaust piping on both engines up to the water injection ports in accordance with 46 CFR 182.425.
Fire Fighting › Ventilation Systems › Ducts
Issued 16 April 2007
Resolved
Provide a means to shutdown ventilation to the machinery space in accordance with 46 CFR 182.465.
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 17 May 2007
Resolution: Provided a means to shut down ventilation to the machinery space in accordance with 46 CFR 182.465.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 16 April 2007
Resolved
Provide guards for rotating machinery in the engine room in accordance with 46 CFR 177.960.
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 17 May 2007
Resolution: Provided guards for rotating machinery in the engine room in accordance with 46 CFR 177.960.
Documentation › Markings/Placards › Garbage Placard
Issued 16 April 2007
Resolved
Provide a MARPOL V (trash) placard in accordance with 33 CFR 151.59.
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 17 May 2007
Resolution: Provided a MARPOL V (trash) placard in accordance with 33 CFR 151.59.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 April 2007
Resolved
Remove dead ended wires from underneath the pilot house in accordance with 46 CFR 183.340.
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 17 May 2007
Resolution: Removed dead ended wires from underneath the pilot house in accordance with 46 CFR 183.340.
Construction/Loadline › Hull › Hull Plating
Issued 3 January 2007
Resolved
Replace the 10th plank from the keel on the starboard side that has a fracture and is rotting in accordance with NVIC 7-95.
Action required: 705 - Other - as specified
Due 3 February 2007
Resolved 17 January 2007
Resolution: Replaced the 10th plank from the keel on the starboard side.
Construction/Loadline › Structures › Manhole
Issued 3 January 2007
Resolved
Prove proper operation of the hatch leading into the lazarette in accordance with 46 CFR 176.802.
Action required: 705 - Other - as specified
Due 3 February 2007
Resolved 17 January 2007
Resolution: Proved proper operation of the hatch leading into the lazarette.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 21 February 2006
Resolved
Mark emergency exit so that it is visible to passengers and crew in lower accommodation space to the satisfaction of the attending marine inspector in accordance with 46 CFR 185.606
Due 21 March 2006
Resolved 21 March 2006
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 21 February 2006
Resolved
Mark upper deck to prohibit passengers on upper deck as required by 46 CFR 185.602 to the satisfaction of the attending marine inspector.
Due 21 March 2006
Resolved 21 March 2006
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 21 February 2006
Resolved
Secure freezer to vessel in main deck cabin to prevent movement as required by 46 CFR 177.800(c) to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 21 March 2006
Communications › Alarms/Indicators › Bilge Alarm
Issued 21 February 2006
Resolved
Mark high bilge visual alarm at the operating station as required by 46 CFR 182.530 to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 21 March 2006
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 21 February 2006
Resolved
Tighten all deck rail courses to maintain its integrity as required by 46 CFR 177.900 to the satisfaction of the attending marine inspector.
Due 21 March 2006
Resolved 21 March 2006
Construction/Loadline › Hull › Bottom Plating
Issued 21 February 2006
Resolved
Prove watertight integrity of forward compartment in accordance with 46 CFR 176.802 to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Resolved 21 March 2006
Resolution: Bilge pump float switch was broken. Did not notice a rise in water once compartment was pumped out.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 21 February 2006
Resolved
Renew retroreflective material on nine adult lifejackets in accordance with 46 CFR 185.604 as identified by the attending marine inspector.
Due 21 February 2006
Resolved 21 March 2006
Communications › Radio Communications › EPIRB
Issued 21 February 2006
Resolved
Repair or renew EPIRB bracket to ensure a float-free release as required by 46 CFR 185.728 to the satisfaction of the attending marine inspector.
Due 21 March 2006
Resolved 21 March 2006
Engineering › Steering Gear System › Rudder Bearing
Issued 21 February 2006
Resolved
Repair leaking port rudder assembly packing as required by 46 CFR 182.610 to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 21 March 2006
Engineering › Shafting/Propeller Arrangements › Stern Gland
Issued 21 February 2006
Resolved
Repair leaking port shaft log as required by 46 CFR 176.802 to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 21 March 2006
Electrical › Electric Generation Source (service) › Generator
Issued 21 February 2006
Resolved
Repair and prove operation of ship service generator as required by 46 CFR 183.322 to the satisfaction of the attending marine inspector.
Due 21 March 2006
Resolved 21 March 2006
Engineering › Bilge Water Management System › Not Operational
Issued 21 February 2006
Resolved
Repair and prove operation of forward bilge pump float switch as per 46 CFR 182.500 to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 21 March 2006
Documentation › Certificates/Documents › FCC SSL
Issued 31 March 2005
Resolved
Provide valid FCC station license as required by 47 CFR 80
Action required: 705 - Other - as specified
Due 30 April 2005
Resolved 26 April 2005
Resolution: Valid station license was provided.
Documentation › Certificates/Documents › FCC SSL
Issued 31 March 2005
Resolved
Provide valid FCC marine radio operators permit as required by 47 CFR 80.
Action required: 705 - Other - as specified
Due 30 April 2005
Resolved 26 April 2005
Resolution: Valid marine radio operators permit was provided.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 31 March 2005
Resolved
Move one B-I fire extinguisher to the pilot house as required by 46 CFR 181.500
Action required: 705 - Other - as specified
Due 30 April 2005
Resolved 26 April 2005
Resolution: The pilot house had a B-I fire extinguisher appropriately mounted.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 31 March 2005
Resolved
Provide one additional B-II fire extinguisher IAW 46 CFR 181.500
Action required: 705 - Other - as specified
Due 30 April 2005
Resolved 26 April 2005
Resolution: An additional B-II was provided.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 31 March 2005
Resolved
Repair or renew and prove operation of anchor light as required by 72 COLREGS
Action required: 705 - Other - as specified
Due 30 April 2005
Resolved 26 April 2005
Resolution: Anchor light was installed and operational.
Engineering › Diesel Engine (propulsion-direct drive) › Crankshaft
Issued 31 March 2005
Resolved
Repair and prove operation RPM gauges on for main diesel engines as per 46 CFR 182.410
Action required: 705 - Other - as specified
Due 30 April 2005
Resolved 26 April 2005
Resolution: Gauges were repaired and operational.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 4 October 2004
Resolved
Repair or renew rotten bottom planking in way of starboard strut. In accordance with NVIC 7-95
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 25 October 2004
Resolution: Area around starboard strut repaired.
Construction/Loadline › Hull › Side Shell
Issued 27 September 2004
Resolved
Replace rotten planking detected on starboard aft quarter along the chine in accordance with NVIC 7-95
Action required: 705 - Other - as specified
Resolved 25 October 2004
Resolution: Rotted planking on staboard aft quarter along chine was replaced.
Documentation › Certificates/Documents
Issued 20 February 2003
Resolved
Provide current marine radio operator permit as per 47 CFR part 80 LEGACY COMPONENT DESC: Marine Radio Operator permit
Action required: 705 - Other - as specified
Due 28 February 2003
Resolved 28 February 2003
Resolution: Owner provided current marine operator permit
Documentation › Certificates/Documents
Issued 20 February 2003
Resolved
Provide original valid certificate of documentation as per 46 CFR 67.315 LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Action required: 705 - Other - as specified
Due 28 February 2003
Resolved 28 February 2003
Resolution: Original was misplaced but owner found original and provided to CG Inspector.
Engineering › Sea-water System (primary cooling)
Issued 20 February 2003
Resolved
Repair exhaust leak on starboard engine and make ready for inspection as per 46 CFR 182.430. LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 28 February 2003
Resolved 28 February 2003
Resolution: Exhaust leak was repaired on seam by preping surface and welding.
Communications › Radio Communications
Issued 20 February 2003
Resolved
Make EPIRB ready for inspection. (not availiable) as per 46 CFR 185.728 LEGACY COMPONENT DESC: EPIRB
Due 28 February 2003
Resolved 28 February 2003
Resolution: Epirb antenna was repaired and in new condition.
Construction/Loadline › Hull
Issued 7 November 2002
Resolved
Replace plank starboard side aft in way of aft bilge overboard . Provide fasteners for examination. LEGACY COMPONENT DESC: Plank
Action required: 705 - Other - as specified
Due 3 December 2002
Resolved 3 December 2002
Resolution: Plank replaced as required. Owner provided fasteners sixteen from the starboard sides below waterline for examination . Fasteners examined and found to be in excellant condition.
Construction/Loadline › Penetrations
Issued 7 November 2002
Resolved
Renew watertight hatch gasket to lazarette hatch LEGACY COMPONENT DESC: Gasket
Action required: 705 - Other - as specified
Due 3 December 2002
Resolved 3 December 2002
Resolution: Gasket in hatch replaced with new gasket.
Construction/Loadline › Hull
Issued 7 November 2002
Resolved
Treat and remove angel hair on structure members in way of portside engine room. LEGACY COMPONENT DESC: angel hair
Action required: 705 - Other - as specified
Due 3 December 2002
Resolved 3 December 2002
Resolution: Angle hair removed. Owner trying to improve ventilation to remove moisture from space using fans.
Engineering › Sea-water System (primary cooling)
Issued 7 November 2002
Resolved
Replace PVC pipe on sea suction on both MDE with rigid metalic piping. LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 3 December 2002
Resolved 3 December 2002
Resolution: Listed pipes were replaced with copper nickle piping.
Engineering › Freshwater System (air cooling)
Issued 7 November 2002
Resolved
Replace two air conditioner inlet sea valves and one generator sea valve. LEGACY COMPONENT DESC: Valve
Action required: 705 - Other - as specified
Due 3 December 2002
Resolved 3 December 2002
Resolution: Valves were replaced with suitable ball type valves.
Construction/Loadline › Hull
Issued 7 November 2002
Resolved
Repair or renew split frame portside main salon. LEGACY COMPONENT DESC: Transverse Frame
Action required: 705 - Other - as specified
Due 3 December 2002
Resolved 3 December 2002
Resolution: Frame was repaired by sistering using 7-95 NVIC as a guide.
Fire Fighting › Means of Escape
Issued 21 February 2002
Resolved
Mark emergency escape hatch. LEGACY COMPONENT DESC: Escape Route Signs
Due 8 March 2002
Resolved 25 February 2002
Communications › Radio Communications
Issued 21 February 2002
Resolved
Provide Proof of hydrostatic release replacement. LEGACY COMPONENT DESC: EPIRB/HYDROSTATIC RELEASE
Due 8 March 2002
Resolved 25 February 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 21 February 2002
Resolved
Repair RPM indicator on port main diesel engine LEGACY COMPONENT DESC: Tachmeter
Due 8 March 2002
Resolved 25 February 2002
Fire Fighting › Remote Fuel Shutoff
Issued 21 February 2002
Resolved
Stencil fuel shut-off valves.
Due 8 March 2002
Resolved 25 February 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 21 February 2002
Resolved
Repair leak in exhaust on port main diesel engine. LEGACY COMPONENT DESC: Piping (exhaust)
Due 8 March 2002
Resolved 25 February 2002
Engineering › Sea-water System (primary cooling)
Issued 21 February 2002
Resolved
Replace salt water suction line on port main diesel engine as required by 46 CFR 182.710-720 LEGACY COMPONENT DESC: Piping
Due 8 March 2002
Resolved 25 February 2002
Lifesaving › Emergency Outfit
Issued 21 February 2002
Resolved
Provide portable lights as required by 46 CFR 183.410 LEGACY COMPONENT DESC: Flashlight
Due 8 March 2002
Resolved 25 February 2002
Engineering
Issued 8 February 2001
Resolved
PROVE PROPER OPERATION OF PILOT HOUSE CONTROL AS REQUIRED BY 46 CFR 184.620
Condition: Unknown
Due 7 March 2001
Resolved 28 February 2001
Engineering
Issued 8 February 2001
Resolved
RENEW FLEXIBLE NON-METALLIC HOSES AS REQUIRED TO ALL INTERNAL COMBUSTION ENGINE FUEL OIL SYSTEM AS REQUIRED BY 46 CFR 182.720(E)(I)
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Engineering
Issued 8 February 2001
Resolved
LABEL EMERGENCY FUEL SHUT-OFFS AS REQUIRED BY 46 CFR 185.608
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Accommodation/Occupational Safety
Issued 8 February 2001
Resolved
INSTALL CABLE CLAMPS FOR A/C COOLING WATER PUMP LOCATED PORT SIDE OF E/R ASREQUIRED BY 46 CFR 183.340
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Construction/Loadline
Issued 8 February 2001
Resolved
MAKE FWD & AFT ENGINE ROOM BULKHEADS VAPOR TIGHT AS REQUIRED BY 46 CFR 185.612
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Navigation
Issued 8 February 2001
Resolved
PROVIDE CHARTS AND PUBLICATIONS AS REQUIRED BY 46 CFR 184.420
Condition: Unknown
Due 8 February 2001
Resolved 8 February 2001
Construction/Loadline
Issued 8 February 2001
Resolved
INSTALL DOUBLE HOSE CLAMPS ON ALL THRU HULL CONNECTIONS AS REQUIRED BY 46 CFR 182.720
Condition: Unknown
Due 7 March 2001
Resolved 28 February 2001
Construction/Loadline
Issued 8 February 2001
Resolved
REPAIR LEAK ON EMERGENCY BILGE PUMP AS REQUIRED BY 46 CFR 176.804(I)
Condition: Unknown
Due 8 February 2001
Resolved 8 February 2001
Fire Fighting
Issued 8 February 2001
Resolved
PROVIDE ANNUAL SERVICING FOR ALL FIRE EXTINGUISHERS AND FFES AS REQUIRED BY46 CFR 176.810(A)
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Engineering
Issued 8 February 2001
Resolved
REPAIR FUEL LEAK ON PORT ENGINE AS REQUIRED BY 46 CFR 182.20-30(D)_x001C_ CORRECT PRIOR TO CARRYING PASSENGERS FOR HIRE
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Lifesaving
Issued 8 February 2001
Resolved
PROVIDE EMERGENCY INSTRUCTION LIST AS REQUIRED BY 46 CFR 185.510
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Accommodation/Occupational Safety
Issued 8 February 2001
Resolved
PROPERLY STENCIL EMERGENCY ESCAPE HATCH AS REQUIRED BY 46 CFR 185.606
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Electrical
Issued 8 February 2001
Resolved
ADJUST GOVERNOR ON GENERATOR TO READ 60 HZ ON METER AS REQUIRED BY 46 CFR 183.720
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Lifesaving
Issued 15 February 2000
Resolved
RENEW HYDROSTATIC RELEASE ON EPRIB AS REQUIRED BY 46 CFR 185.740.
Condition: Unknown
Due 3 March 2000
Resolved 18 February 2000
Navigation
Issued 15 February 2000
Resolved
PROVIDE A BELL AS REQUIRED BY 72 COLREGS.
Condition: Unknown
Due 3 March 2000
Resolved 6 March 2000
Construction/Loadline
Issued 15 February 2000
Resolved
PROVIDE A MEANS TO MAKE THE HATCH IN COLLISION BULKHEAD WATERTIGHT AS REQUIRED BY 46 CFR 179.360.
Condition: Unknown
Due 3 March 2000
Resolved 6 March 2000
Electrical
Issued 15 February 2000
Resolved
PROVIDE FIXTURES FOR DEAD LIGHT COVERS AS REQUIRED BY 46 CFR 179.350
Condition: Unknown
Due 3 March 2000
Resolved 6 March 2000
Construction/Loadline
Issued 11 February 1998
Resolved
PROVIDE A 6 INCH COAMING FOR THE ESCAPE HATCH ON THE FORWARD DECK AS PER 46171.124.
Condition: Unknown
Due 11 March 1998
Resolved 20 March 1998
Construction/Loadline
Issued 11 February 1998
Resolved
PROPERLY REPAIR WEAPING SEAMS IN THE FORWARD COMPARTMENT NEAR THE WATERLINEIN ACCORDANCE WITH NVIC 7-95._x001C_
Condition: Unknown
Due 11 March 1998
Resolved 20 March 1998
Navigation
Issued 11 February 1998
Resolved
PROVIDE VALID CHARTS FOR THE OPERATING AREA AS PER 46 CFR 184.420.
Condition: Unknown
Due 11 February 1998
Resolved 12 February 1998
Lifesaving
Issued 11 February 1998
Resolved
PROVIDE AND POST LIFE JACKET DONNING PLACARD FRO EACH TYPE JACKET CARRIED ON BOARD AS PER 46CFR 185.516.
Condition: Unknown
Due 11 February 1998
Resolved 12 February 1998
Accommodation/Occupational Safety
Issued 11 February 1998
Resolved
PROVIDE AND POST A PLACARD RESTRICTING PASSENGERS FROM THE UPPER DECK. SEE 46 CFR 185.602(g).
Condition: Unknown
Due 11 February 1998
Resolved 12 February 1998
Engineering
Issued 24 March 1997
Resolved
THE VESSEL'S INTERNAL COMBUSTION ENGINE LOSS OF COOLING ALARM WAS INOPERABLE. REPAIR ALARM IN ACCORDANCE WITH 46 CFR 182.422.
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Lifesaving
Issued 24 March 1997
Resolved
THE OPERATOR COULD NOT PROVIDE EVIDENCE OF 50% OF DECKHANDS BEING CPR TRAINED IN ACCORDANCE WITH NVIC 1-91.
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Navigation
Issued 24 March 1997
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Engineering
Issued 21 October 1996
Resolved
RENEW GENERATOR FUEL HOSE AND FITTINGS USING SAE J1942 TESTED HOSE AND SAE J1475 TESTED FITTINGS IAW 46 CFR 182.455 (b)(5) AND 46 CFR 182.770 (4)(e).
Condition: Unknown
Due 21 November 1996
Resolved 26 November 1996
Electrical
Issued 21 October 1996
Resolved
PROPERLY CLEAN BATTERY TERMINALS ON BOTH MAIN ENGINE BATTERIES AND RENEW POSITIVE LUG ON STARBOARD SIDE BATTERY IAW 46 CFR 183.200.
Condition: Unknown
Due 21 November 1996
Resolved 26 November 1996
Fire Fighting
Issued 21 October 1996
Resolved
RENEW OR RECHARGE ONE EACH MAIN CABIN PORTABLE B-I FIRE EXTINGUISHER.
Condition: Unknown
Due 21 November 1996
Resolved 21 October 1996
Lifesaving
Issued 21 October 1996
Resolved
PROPERLY MARK BOTH LIFEFLOATS WITH VESSEL'S NAME AND CAPACITY IAW 46 CFR 185.604 (e).
Condition: Unknown
Due 21 November 1996
Resolved 26 November 1996
Lifesaving
Issued 29 March 1996
Resolved
PROVIDE 3EA INDATE RED DISTRESS FLARES.
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Construction/Loadline
Issued 29 March 1996
Resolved
MAKE REPAIRS TO STBD ENGINE DECK WASK DOWN PUMP AND PIPING .
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Lifesaving
Issued 29 March 1996
Resolved
ATTACH WATER LIGHT TO RING BOUY AND PROVIDE 60' OF POLY LINE.
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Navigation
Issued 29 March 1996
Resolved
PROVIDE AREA NAVIGATIONAL CHARTS,
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Documentation
Issued 29 March 1996
Resolved
PROVIDE COPY OF NEW T-BOAT REGULATIOS.
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Engineering
Issued 29 March 1996
Resolved
MAKE REPAIRS TO STBD EXHAUST WHERE EXHAUST GOES THRU STERN OF VESSEL.
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Fire Fighting
Issued 29 March 1996
Resolved
PROVIDE THREE 2.5 GALLON FIRE BUCKETS WITH LANYARD.
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Lifesaving
Issued 29 March 1996
Resolved
PROVIDE LIFE JACKET DONNING PLACARD AND POST.
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Documentation
Issued 29 March 1996
Resolved
PROVIDE FCC OPS LICENSE.
Condition: Unknown
Due 29 April 1996
Resolved 9 May 1996
Lifesaving
Issued 27 March 1995
Resolved
MOUNT LIFE FLOATS SO THAT THEY ARE FLOAT FREE.
Condition: Unknown
Due 27 April 1995
Resolved 1 May 1995
Electrical
Issued 27 March 1995
Resolved
PROVIDE DOCUMENTATION THAT GENERATOR HAS BEEN DE-RATED 80% AND INSTALL PLATE.
Condition: Unknown
Due 27 April 1995
Resolved 1 May 1995