MAURY USCG vessel records Sign in
← All vessels

HSV 2 SWIFT

HSV 2 SWIFT is a 2003 freight ship. The Coast Guard has recorded 6 inspections since 2008, most recently in January 2011, along with 19 deficiencies and 2 casualty investigations between 2012 and 2013.

Records from 2008 to 2013. Most recent: casualty investigation, 8 May 2013.

Built
2003
Last inspected
14 January 2011
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9283928 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDE6487
960683
Flag
UNITED STATES
367380870 (licence lapsed)
Maury page id
psix-960683

Inspections, by type

…with no type recorded1
Years with a record 4 calendar years (2008–2011)
The 6 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 15 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it1780 - Convention (Subpart B), Net Ton
5936 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDE6487MMSI 367380870 · cancelled · compulsorily equipped · granted 16 October 2008, cancelled 27 July 2018
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 6

14 January 2011 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3926555
9 November 2010 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3888089
26 October 2010 Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3877775
14 January 2010 Annual Inspection
Physical examination · Activities Europe · Activity 3662428
14 December 2009 Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3884311
15 September 2008 Hull Examination · Internal Structural Exam · Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3325614

Deficiency record · 19

Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 26 October 2010 Resolved
Add to the ISM the Fixed Fire Detection periodic inspection procedures.
Due 26 January 2011
Resolved 14 January 2011
Resolution: ISM amended.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 26 October 2010 Resolved
Add to the ISM the dry type fixed sprinkler system periodic flushing and fresh water flushing procedures and reporting.
Due 26 January 2011
Resolved 14 January 2011
Resolution: ISM amended.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 15 September 2008 Resolved
Provide to the Marine Safety Center JP-5 /diesel fuel systems fill and vent piping plans for approval prior to January 24, 2009
Due 24 January 2009
Resolved 13 February 2009
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 15 September 2008 Resolved
Replace JP-5/diesel fuel systems fill and vent piping with approved materials as per submitted and approved plans prior to August 1, 2009.
Due 1 August 2009
Resolved 5 June 2009
Engineering › Fuel Oil Service System › Tank
Issued 15 September 2008 Resolved
Provide a Coast Guard approved CO2 system in the space containing the JP-5 fuel storage tank prior to tank being used to store JP-5. Tank shall remain gas free until new CO2 system is installed and approved by an attending Coast Guard inspector. No helicopter operations are permitted.
Due 1 August 2009
Resolved 25 March 2009
Engineering › Steering Gear System › Piping
Issued 15 September 2008 Resolved
Provide to the Marine Safety Center hydraulic systems plans and bill of materials for steering and ramp hydraulic systems for approval prior to January 24, 2009.
Due 27 February 2009
Resolved 22 May 2009
Engineering › Steering Gear System › Piping
Issued 15 September 2008 Resolved
Ensure all materials in steering and ramp hydraulic systems are replaced with approved materials as per submitted plans prior to August 1, 2009.
Due 1 August 2009
Resolved 22 May 2009
Accommodation/Occupational Safety › Washroom/Toilet › Hot and Cold Running Water
Issued 15 September 2008 Resolved
Provide to the Marine Safety Center detailed drawings of the black and gray water drains piping with bill of materials for approval prior January 24, 2009.
Due 27 February 2009
Resolved 25 March 2009
Accommodation/Occupational Safety › Washroom/Toilet › Hot and Cold Running Water
Issued 15 September 2008 Resolved
Replace all plastic piping with approved plastic piping and penetrations as per submitted and approved plans prior to August 1, 2009.
Due 1 August 2009
Resolved 5 June 2009
Fire Fighting › Fixed Deck Foam System › Piping
Issued 15 September 2008 Resolved
Provide to the Marine Safety Center plans on the helicopter deck foam system for approval prior to January 24, 2009. No helicopter operations are permitted until an approved deck foam system is installed on the vessel.
Due 27 February 2009
Resolved 6 March 2009
Fire Fighting › Fixed Deck Foam System › Piping
Issued 15 September 2008 Resolved
Install a Coast Guard approved deck foam system for the helicopter deck to the satisfaction of an attending Coast Guard inspector prior to conducting helicopter operations.
Due 1 August 2009
Resolved 5 June 2009
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 15 September 2008 Resolved
Provide to the Marine Safety Center piping arrangement and bill of materials for the Oily water separator and Sewage systems prior to January 24, 2009.
Due 27 February 2009
Resolved 27 March 2009
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 15 September 2008 Resolved
Install approved oily water seperator and sewage piping and materials as per submitted and approved plans prior to August 1, 2009 to the satisfaction of an attending Coast Guard inspector.
Due 1 August 2009
Resolved 5 June 2009
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 15 September 2008 Resolved
Provide a second distribution transformer for DB1 essential, DB 2 essential, and DB 2 normal prior to August 1, 2009.
Due 1 August 2009
Resolved 22 May 2009
Electrical › Electrical Distribution System (emergency) › Distribution Panel Bus
Issued 15 September 2008 Resolved
Porvide an alternate source of supply for the starboard main engine governor power supply and the port main engine governor power supply prior to August 1, 2009.
Due 1 August 2009
Resolved 22 May 2009
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 15 September 2008 Resolved
Submit for approval maintenance testing procedures and the testing frequency interval for the 70 amp diodes located after each of the 220VAC/24VDC 40A power supplies prior to August 1, 2009.
Due 1 August 2009
Resolved 6 March 2009
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 15 September 2008 Resolved
Provide a Failure Mode and Effects Analysis (FMEA) program/report that addresses as a minumum the failures listed in 4.3, Annex 8 of the HSC code prior to August 1, 2009.
Due 1 August 2009
Resolved 22 May 2009
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 15 September 2008 Resolved
Provide a working toilet for the hospital space as required by 46 CFR 92.20-35(d).
Due 21 December 2008
Resolved 18 December 2008
Resolution: Parts delivered to vessel in Panama and repairs were completed.
Electrical › Electrical Distribution System (service) › Fuse
Issued 15 September 2008 Resolved
Test the 70 amp diode located after each of the 220VAC/24VDC 40A power supplies as per procedures referenced in Marine Safety Center letter dated March 5, 2009.
Due 1 August 2009
Resolved 22 May 2009

Casualty record · 2

23 September 2012Routine · role: Involved in a Marine Casualty · activity 4451320
8 May 2013Routine · role: Involved in a Marine Casualty · activity 4603703
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.