Records from 2010 to 2016. Most recent: inspection, 19 October 2016.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 10
19 October 2016
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6159556
8 August 2016
COC-MODU Annual
Type not classified · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6004219
12 August 2015
COC-MODU Renew
Type not classified · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5213891
17 June 2014
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4901623
15 May 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4859496
22 June 2012
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4360064
1 February 2012
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4236167
5 December 2011
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4201997
31 August 2011
COC-MODU Renew
Type not classified · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4125974
17 September 2010
Administrative Inspection · Deficiency Check · COC-MODU Annual
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3853863
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 18 August 2015
Resolved
The starboard bulkhead in the mud pit room was penetrated with temporary wiring as was not properly sealed to maintain bulkhead integrity.
Due 1 September 2015
Resolved 24 August 2015
Resolution: Structural fire protection was repaired.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 18 August 2015
Resolved
Structural Fire Protection in stbd engine room and mud pump room had sections of SFP that were damaged or removed. Restore to original.
Due 1 September 2015
Resolved 24 August 2015
Resolution: Structural fire protection was repaired.
Lifesaving › Lifeboat › Capacity
Issued 18 August 2015
Resolved
Lifeboat had lifeboat equipment stored on seats near aft entrance.
Due 18 August 2015
Resolved 18 August 2015
Resolution: Lifeboat equipment was properly stowed.
Electrical › Electrical Distribution System (service) › Cable
Issued 18 August 2015
Resolved
Temporary wiring was installed for gas detection equipment. The temporary wiring was not properly supported as required.
Due 1 September 2015
Resolved 24 August 2015
Resolution: Wiring was properly installed using brackets and metal supports.
Lifesaving › Lifeboat › Markings
Issued 17 September 2010
Resolved
Provide proper labeling for equipment storage in #4 lifeboat
Condition: Improper/Lack of Maintenance
Due 15 October 2010
Resolved 28 October 2010
Resolution: Verified proper marking provided
Electrical › Lighting (service) › Outlet Box
Issued 17 September 2010
Resolved
Complete repairs to alarm system for mud pit room loss of ventillation alarm prior to conducting drilling operations.
Condition: Improper Installation
Due 15 October 2010
Resolved 29 October 2010
Resolution: Verified operation of alarm.
Lifesaving › Launching Appliances › Davit
Issued 17 September 2010
Resolved
Complete repairs to fast rescue boat davit and prove proper operation prior to conducting drilling operations.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 23 December 2010
Resolution: Received verification of completion via Class Survey Report.
Lifesaving › Inflatable Liferafts › Carriage Requirement
Issued 17 September 2010
Resolved
Complete re-positioning of aft life rafts so they are not positioned above the pontoons.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 23 December 2010
Resolution: Verified complete by reviewing the the ABS survey report.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 17 September 2010
Resolved
Provide documentation from Alfa Laval that modifications made to OWS, oil content meter piping system meets the requirements of MARPOL
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 23 December 2010
Resolution: Verified by reviewing ABS Class Surveyor Report
Engineering › Pressure Vessel › Relief Valve
Issued 17 September 2010
Resolved
Provide proof of two year testing of pressure relief valves on all pressure vessel's.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2010
Resolution: Validated setting and operation of PRVs of 50% of installed valves. None were found to be out of calibration. Did not require completion of the other 50% prior to issuance of COC. [name withheld]