BW TYR

BW TYR is a 2008 tank ship. The Coast Guard has recorded 7 inspections since 2016, most recently in June 2026, along with 3 deficiencies and 1 operational control.

Records from 2016 to 2026. Most recent: inspection, 5 June 2026.

Built
2008
Last inspected
5 June 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 5 June 2026
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9346122
970257
Flag
MARSHALL ISLANDS
Maury page id
psix-970257

Documentation record

Tonnage as PSIX records it17309 - Regulatory (Subpart C or D), Net Ton
58564 - Dead Weight, Metric Ton
77523 - Displacement, Metric Ton
47197 - Convention (Subpart B), Gross Ton
17309 - Convention (Subpart B), Net Ton
47197 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 7

5 June 2026 COC-GAS Renew · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8382403
9 April 2021 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7171901
9 January 2021 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7121091
30 November 2020 COC-GAS Annual · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7100587
29 October 2019 Ballast Water Examination · ISPS II Exam · COC-GAS Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6834735
17 July 2018 Ballast Water Examination · ISPS II Exam · Deficiency Check · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6475705
23 February 2016 ISPS II Exam · COC-GAS Renew · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5818195

Deficiency record · 3

07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 17 July 2018 Resolved
0799 - ON SHIPS CARRYING FLAMMABLE PRODUCTS A WATER SPRAY SYSTEM FOR COOLING, FIRE PREVENTION, AND CREW PROTECTION SHOULD BE INSTALLED TO COVER CARGO TANK DOMES, CARGO LIQUID LINES AND VAPOUR MANIFOLDS AND BOUNDARIES OF SUPER STRUCTURES NORMALLY MANNED. THE SYSTEM SHOULD BE CAPABLE OF COVERING ALL AREAS WITH A UNIFORMALY DISTRIBUTED WATER SPRAY NO DECK WATER SPRAY COVERAGE OBSERVED ON TANK TOPS 1, 2, AND 3 OR PORT AND STARBOARD MANIFOLDS ON INITIAL PSC TEST OF DWS. UPON SECOND TESTING OF DWS AFTER FOUR HOURS OF MAINTENANCE, ALL TANK TOPS AND BOTH MANIFOLDS STILL DID NOT HAVE DECK WATER SPRAY COVERAGE 74 SOLAS (14) VII/13.1 REF 93 IGC 11.3
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 18 July 2018
Resolution: Received class report from LR. Engaged with onboard Marshall Island flag state inspectors. PSCOs re-attended the vessel and witnessed satisfactory operation of deck water spray with proper coverage for all required areas.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 17 July 2018 Resolved
2550- THE COMPANY SHOULD ESTABLISH PROCEDURES TO ENSURE THE SHIP IS MAINTAINED IN CONFORMITY WITH THE PROVISIONS OF THE RELEVANT RULES AND REGULATIONS AND WITH ANY ADDITIONAL REQUIREMENTS WHICH MAY BE ESTABLISHED BY THE COMPANY. THE MEASURES AIMED AT PROMOTING THE RELIABILITY SHOULD INCLUDE THE REGULAR TESTING OF EQUIPMENT THAT IS NOT IN CONTINUOUS USE. COMPANY SMS (###) REQUIRES MONTHLY CHECK AND FUNCTION TEST OF DECK WATER SPRAY SYSTEM TO INCLUDE “ISOLATION VALVE, ALL NOZZLES CLEAR AND SPRINKLER TESTED SAT”. RECORDS INDICATED THESE TESTS COMPLETED SATISFACTORILY. LAST TEST OF DECK WATER SPRAY WAS DOCUMENTED AS CARRIED OUT ON 15 JULY 2018, AND NOTED TO BE SATISFACTORY. THE CONDITION OF THE DWS IDENTIFIED IN DEFICIENCY ONE BY PSC EXAMINERS IN THE NORMAL COURSE OF COC EXAM PROVIDES OBJECTIVE EVIDENCE, AS WELL AS, DWS BRING IDENTIFIED AS CRITICAL EQUIPMENT IN THE COMPANY SMS (##), THAT THE PROCEDURES ESTABLISHED ARE INEFFECTIVE. AN INTERNAL AUDIT FOCUSED ON CARGO SYSTEMS IS RECOMMENDED. 74 SOLAS (14) IX/3.1 ISM CODE 10.1 & 10.3
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2018
Resolved 31 July 2018
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 17 July 2018 Resolved
1099-GAS DETECTING EQUIPMENT SHOULD BE SO DESIGNED THAT IT MAY BE READILY TESTED. SUITABLE EQUIPMENT AND SPAN GAS SHOULD BE CARRIED ON BOARD. DURING PSC EXAM, PSCOS WITNESSED BOTH TEST OF PORTABLE AND FIXED GAS DETECTION EQUIPMENT WITH SPAN GAS. LABEL ON SPAN GAS INDICATED 50% LEL, HOWEVER ALL TESTS OF EQUIPMENT RESULTED IN READOUT OF 35% LEL. CONSISTENT LEL READINGS PROVIDE OBJECTIVE EVIDENCE THAT SPAN GAS BOTTLE IS INCORRECTLY LABELED. 74 SOLAS (14) VII/13.1 93 IGC 13.6.6
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 July 2018
Resolution: Attended vessel with fixed gas detection technician. Verified proper span gas onboard. PSCOs witnessed function test of fixed gas detection equipment from remote location - 20 % and 30 % LEL alarms verified.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.