13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 April 2026
Resolved
Provide a means to make the port forward electronic submersible bilge pump operate automatically or mark the switch "Manual Only".
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2026
Resolved 12 May 2026
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 29 April 2026
Resolved
Mark the life jacket stowage locations with the number and identification of life jackets stowed inside in numbers and letters at least 2" high (15 Adult Life Jackets).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2026
Resolved 12 May 2026
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 April 2026
Resolved
Mark the fuel shut off valve locations in a visible location.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2026
Resolved 12 May 2026
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 28 May 2025
Resolved
The hydrostatic release for the Cat 1 EPIRB is expired. Replace, mark, and install the hydrostatic release so the EPIRB will automatically float free.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 May 2025
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 28 May 2025
Resolved
Provide 6 additional red flare signals or 6 additional orange smoke signals so a total of 12 distress signals are on board.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 May 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 May 2025
Resolved
Provide 2 additional adult life jackets. Vessel restricted to carrying 38 passengers and 40 total persons.
Action required: 705 - Other - as specified
Resolved 28 May 2025
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 May 2025
Resolved
Provide 1 additional 2.5 gallon fire bucket, label, and attache a lanyard long enough to reach the waterline.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 28 May 2025
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 28 May 2025
Resolved
Provide an operational port navigation light prior to operating during periods of reduced visibility.
Action required: 705 - Other - as specified
Resolved 4 June 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 28 May 2025
Resolved
Replace gasket material and repair latches and hinges on identified deck hatches to make them watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 28 May 2025
Resolved
Seal all deck penetrations and former screw holes to make the deck watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 May 2025
Resolved
Service or provide a new 10-B:C fire extinguisher. Mount extinguisher in a proper bracket and label location if not readily visible.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 May 2025
Resolved
Mount the 40-B:C fire extinguisher in a proper bracket.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 28 May 2025
Resolved
Provide a visual indicator for the high water alarm.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 28 May 2025
Resolved
Provide 100 aspirin.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 May 2025
Resolved
Replace the retro-reflective material on the ring life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 May 2025
Resolved
Mark the life jacket storage locations with the type and number of life jackets in letters at least 4 inches.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 28 May 2025
Resolved
Strengthen the deck rail bases as identified.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 4 June 2025
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 22 June 2022
Resolved
The battery in the vessel's FCC Type Accepted Category 1, 406 MHz EPIRB is expired. Provide proof of the current EPIRB properly serviced with a new battery installed or purchase a new Category 1, 406 MHz EPIRB and show proof of registration prior to carrying passengers.
Action required: 10 - Deficiency Rectified
Resolved 22 June 2022
Resolution: Vessel rep purchased new EPIRB and registered it with NOAA prior to the end of the inspection.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 7 November 2019
Resolved
Repair all soft spots, blisters and crack locations identified (i.e. port side aft deck aft of head compartment, areas marked on both port and starboard hulls, cross members, tabbing in forward compartment on starboard side, and two locations identified in port hull, and all other self identified locations), submit repair proposal to include material type (Glass type, weight, and resin). Area must be properly prepped and ground down to good glass and reinspected by marine inspector prior to carrying out repairs.
Action required: 705 - Other - as specified
Resolved 5 December 2019
Resolution: repaired gouge in sideshell and crossmember
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 7 November 2019
Resolved
Thru hull valve is not securely seated against the hull. Hull must be watertight. Re-seat thru hull valve and retest with a marine inspector in attendance.
Action required: 705 - Other - as specified
Resolved 3 December 2019
Resolution: replaced and retested
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 April 2019
Resolved
Provide properly sized over-current protection for power assist hydraulic steering pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 3 April 2019
Resolved
Provide a metallic positive shutoff valve at the hull penetration for each installed submersible bilge pump (04) total.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 April 2019
Resolved
Electrical equipment exposed to corrosive environments must be of suitable construction and corrosion resistant. Provide documentation for 50amp Blue Sea breakers in Port and STBD hulls are suitable for installed location or relocate fuses waterproof/drip proof enclosure.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 April 2019
Resolved
Provide fuses that are cartridge type and UL listed for breaker panel in console. Fuses are of the automotive type (ATO). Electrical plans approved on April 9th, 2009 do not indicate the type that were installed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 October 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 3 April 2019
Resolved
Installed SeaStar hydraulic power assist attached to main ungrounded conductor supplying breaker panel with no over-current protection. Electrical Plans approved on April 9th, 2009 does not indicate power assist steering system, provide owners manual/installation manual to confirm proper installation. Submit Electrical plans of installation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 October 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 April 2019
Resolved
Provide hose specifications for hydraulic steering
lines. Orginal plans do not indicate power assist
steering system. Specs needed to verify properly sized
burst pressure for hoses is 4x maximum working pressure of steering system.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 3 April 2019
Resolved
Provide electrical plans for installed batteries (02)in console, to include switches, length of wires, and size. Electrical plans approved on April 9th, 2009 do not indicate installed batteries in console, no records of notifying USCG to conduct alterations.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 October 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 April 2019
Resolved
Replace ring buoy; mark new buoy with reflective tape and vessels name.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 April 2019
Resolved
Label automatic bilge pump indicating lights
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 April 2019
Resolved
Repair/replace automatic bilge indicating light for Portside forward compartment, light was weak when tested.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 3 April 2019
Resolved
Provide light for magnetic compass, vessel restricted to daylight operations.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 3 April 2019
Resolved
Provide valid FCC Station license for vessel
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 3 April 2019
Resolved
Provide up to date publications to include US. Coast Pilot [name withheld] for area operated.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 April 2019
Resolved
Provide 03 Fire buckets, buckets shall be 2.5 gallons, with lanyard and labeled "fire bucket".
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 3 April 2019
Resolved
Provide up to date electrical drawings for installed electrical system. Current installed system does not match approved electrical plans dated April, 9th 2009.
Plans shall be sent to USCG Marine Safety Center; [email withheld] for approval.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 October 2019
Communications › Radio Communications › VHF Radiotelephone
Issued 22 June 2018
Resolved
Provide a valid FCC Safety Certificate.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 August 2018
Resolution: Safety Cert. onboard
Communications › Radio Communications › VHF Radiotelephone
Issued 22 June 2018
Resolved
Provide GPS for installed VHF Radio.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 August 2018
Resolution: GPS input operational
Stability › Watertight Integrity › General
Issued 22 June 2018
Resolved
Repair/replace gasket on STBD forward hatch.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 August 2018
Resolution: Gasket replaced
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 22 June 2018
Resolved
Clearly mark all PFD stowage locations for both Adult and Child.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 August 2018
Resolution: PFD locations marked.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 22 June 2018
Resolved
Provide adequate ventilation for Port and STBD aft compartments that are elevated 12inches from the weather deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 August 2018
Resolution: Ventilation provided that is elevated from the weather deck.
Stability › Watertight Integrity › General
Issued 2 November 2017
Resolved
Grind out to good glass at identified areas (4 areas) on port hull.
Action required: 705 - Other - as specified
Resolved 3 November 2017
Resolution: Completed repairs.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 3 July 2017
Resolved
Provide overcurrent protection for four submersible electric bilge pumps.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 13 July 2017
Documentation › Certificates/Documents › Stability Letter
Issued 3 July 2017
Resolved
Post all pages of Stability Letter
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 13 July 2017
Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 July 2017
Resolved
Post all pages of Certificate of Inspection
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 13 July 2017
Communications › Radio Communications › EPIRB
Issued 3 July 2017
Resolved
EPIRB hydrostatic release expired
Action required: 705 - Other - as specified
Due 3 July 2017
Resolved 3 July 2017
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 3 July 2017
Resolved
Replace one BI fire extinguisher. The extinguisher was discharged.
Action required: 705 - Other - as specified
Due 3 July 2017
Resolved 3 July 2017
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 22 June 2016
Resolved
Vessel had expired items in first aid kit.
Action required: 705 - Other - as specified
Due 29 June 2016
Resolved 24 June 2016
Resolution: Owner purchased new replacement first aid kit.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 22 June 2016
Resolved
Fire extinguishers require annual servicing.
Action required: 705 - Other - as specified
Due 29 June 2016
Resolved 29 June 2016
Resolution: Extinguishers serviced.
Construction/Loadline › Hull › Transverse Frame
Issued 7 March 2016
Resolved
Port transom had cracks on either side of motor. Required owner to grind back crack to reveal depth/severity of crack and determine repair plan.
Action required: 705 - Other - as specified
Due 7 April 2016
Resolved 8 March 2016
Resolution: Crack was ground back and determined to be superficial in nature, only penetrated through the gel-coat resin, not actually through any fiberglass. Resin filled in and re-sealed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 March 2016
Resolved
Found several dead-end wires throughout the vessel. Instructed owner to identify their purpose and either remove or re-employ the wires.
Action required: 705 - Other - as specified
Due 7 April 2016
Resolved 8 March 2016
Resolution: Each wire was identified and reattached to the appropriate equipment (power pole motors)
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 7 March 2016
Resolved
Fuel tank was not properly bonded to the hull to prevent build-up of static electricity.
Action required: 705 - Other - as specified
Due 7 March 2016
Resolved 8 March 2016
Resolution: Bonding strap was re-attached.