Records from 2012 to 2025. Most recent: operational control imposed, 21 November 2025.
Inspection history · 32
21 November 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8272452
21 November 2025
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8273335
24 October 2025
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8258505
28 April 2025
Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8121947
28 April 2025
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8126299
20 March 2025
Deficiency Check · Internal Structural Exam · In-Service Inspection · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8089644
15 November 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8035110
30 July 2024
Drydock Exam · Internal Structural Exam · In-Service Inspection · Hull Examination · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7969640
18 March 2024
Annual Inspection · Deficiency Check · In-Service Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7880947
1 June 2023
Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7703815
15 August 2022
Plan Review (Other than "T") · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7534113
26 May 2022
Deadweight Survey · Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7478690
28 March 2022
Plan Review (Other than "T")
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7420152
23 March 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7417493
12 January 2022
Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7378752
15 April 2021
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7176167
30 March 2021
Annual Inspection · Drydock Extension · Deficiency Check · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7154951
12 February 2021
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7139810
26 March 2020
DAPI Audit · COI Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6924967
19 November 2019
Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6929218
15 November 2019
Internal Structural Exam · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6856612
1 November 2019
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6849926
17 June 2019
Deficiency Check · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6717116
21 May 2019
Annual Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6688911
18 March 2019
In-Service Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6645213
11 September 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6537620
2 May 2018
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6403833
20 July 2017
Examination of Repairs · Deadweight Survey · Internal Structural Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6229538
8 June 2017
Annual Inspection · MTSA Verification · Internal Structural Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6168976
30 March 2017
Damage Survey · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6114454
17 May 2016
Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5879494
12 January 2016
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5795813
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 October 2025
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel reported loss of thrust from stbd side. Conduct repairs and satisfactory sea trial with MI prior to carrying passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2025
Resolution: Vessel replaced shaft and prop and conducted satisfactory sea trials.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 28 April 2025
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Vessel reported a crack in the starboard lazarette, causing water intrusion into internal hull. Vessel is authorized a one-time transit from WETA Central Bay Maintenance Facility to Bay Ship & Yacht Dry Dock in Alameda to conduct repairs. Submit repair proposal and conduct repairs to the satisfaction of the Marine Inspector.
46 CFR 116.100(a)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 May 2025
Resolution: MI witnessed final NDT of hull insert.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 20 March 2025
Resolved
At each initial and subsequent inspection for certification, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment, including the following: ... inspection and testing of ventilation shutdowns... Port E/R ventilation unable to close; repair to MI satisfaction prior to the carriage of passengers.
46 CFR 115.810 (a)(20)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 March 2025
Resolution: MI verified operation of ventilation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 March 2025
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of... piping systems, including the following: External inspection of fuel... piping, and pipe fittings. T-connection for fuel piping in STBD Gen Room leaking. Repair to MI satisfaction.
46 CFR 115.803(d)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 March 2025
Resolution: MI verified repair to fuel piping connection.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 20 March 2025
Resolved
Suitable means... must be provided... for shutting off the passage of air through the ventilation duct... Fwd main deck fresh air supply duct closure missing; missing gasket on upper deck aft vent cover. Install closure and gasket to MI satisfaction.
46 CFR 116.610 (d)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 20 March 2025
Resolution: Rectified on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 March 2025
Resolved
Nonmetallic piping materials, including nonmetallic flexible hose assemblies, must meet the requirements of § 56.60-25 in subchapter F of this chapter. Flexible hosing on port and stbd generator r/w intake did not have double hose clamps. Install clamps to MI satisfaction.
46 CFR 119.720
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 20 March 2025
Resolution: Rectified on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 March 2025
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests... including the following: Operational test of the means provided for pumping bilges. Pin hole leak found in hosing for stbd lazarette bilge. Repair to MI satisfaction.
46 CFR 115.804 (h)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 20 March 2025
Resolution: Rectified on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 March 2025
Resolved
Each pressure type wire connector and lug must meet UL 486A, “Wire Connectors and Soldering Lugs for Use With Copper Conductors,” or other standard specified by the Commandant... Twist-on type connectors may not be used for making joints in cables. Replace unauthorized connector for stbd fuel priming pump to MI satisfaction.
46 CFR 120.340 (i)(2)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 20 March 2025
Resolution: Rectified on the spot.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 November 2024
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space, including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. Operator reported a 3-inch inboard fracture in the side shell of the starboard lazzarette. Provide details of repair plan and effect repairs to the satisfaction of the attending marine inspector.
46 CFR 115.600(d)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2024
Resolution: Verified sat repairs
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 November 2024
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an ISE in any affected space and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. MIs unable to fully assess condition and extent of reported inboard fracture in the starboard lazarette; remove temporary patch, deck plating, and any obstructions prior to re-inspection. Submit repair proposal to MI prior to commencement of work. 46 CFR 115.600(d)
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 November 2024
Resolution: Attended vessel for thorough inspection of damaged area and approved repair proposal
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 15 November 2024
Resolved
The owner or managing operator shall notify the cognizant OCMI as far in advance as possible whenever a vessel is to be hauled out or placed in a drydock in compliance with § 115.605 of this part or to undergo repairs or alterations affecting the safety of the vessel, together with the nature of any repairs or alterations contemplated. Hull repairs or alterations that affect the safety of the vessel include but are not limited to the repair of cracks in the hull. Crack in starboard lazarette was not reported in a timely manner and without prompting from MIs. 46 CFR 115.665
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 18 November 2024
Resolution: Discussed reporting requirements with vessel rep
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 August 2024
No resolution recorded
During the examination all accessible parts of the vessel's underwater body and all... appendages...shall be made available for examination. Temporary repair authorized to aft starboard shaft tube. Renewal of this component is required at mid life refurbishment or next drydock, whichever comes first. The same area on the port aft shaft tube requires MI inspection for determination of wastage and possible repair.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 6 August 2024
Resolved
An internal structural examination ... consists of a complete examination of the vessel's...main strength members. MI observed fractures to second and third main structural frames forward of steering pass through, outboard side which require crop and renewal.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 14 August 2024
Resolution: Verified sat repair.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 18 March 2024
Resolved
Penetrations in A-Class fire control boundaries for electrical cables... must be constructed to prevent the passage of flame and smoke for one hour. In addition, the penetration must be designed or insulated so that it will withstand the same temperature rise limits as the boundary penetrated. Cable run penetrations in port lazarette, and bridge technical spaces are missing insulation or contain differing insulation materials with improper bonding to existing insulation.(46 CFR 116.415(a)(2)(ii))
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 April 2024
Resolved 15 April 2024
Resolution: Attending MI verified correct installation of insulation for cable run penetrations. Verified material used was USCG approved or equivalent. Material is MFS Marine Firestop Sealant, SOLAS Approved.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 March 2024
Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. Panels for the HVAC motor controller unit, port and starboard bilge panel,and port generator control unit have missing latches and/or broken hinges, preventing proper closure. (46 CFR 120.330(b))
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 April 2024
Resolved 15 April 2024
Resolution: MI visually verified all panels had latches installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 March 2024
Resolved
Each pressure type wire connector and lug must meet UL 486A, “Wire Connectors and Soldering Lugs for Use With Copper Conductors,” or other standard specified by the Commandant. The use of twist-on type wire nuts is permitted under the following conditions: The connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration. Junction box/enclosure containing twist on wire nuts in port engine room locate inboard of engine does not have a front or fully enclose the connections. (46 CFR 120.340(i)(1))
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 April 2024
Resolved 15 April 2024
Resolution: Junction boxes with exposed wire connections have been closed with correct plates
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 18 March 2024
Resolved
Electrical equipment exposed to corrosive environments must be of suitable construction and corrosion-resistant. Marine inspector observed GPS antennae installation on uppermost deck missing protective covering with wiring exposed to elements. Additionally, Marine Inspector found a cover missing on an outlet in the port engine room.
46 CFR 120.210
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 April 2024
Resolved 15 April 2024
Resolution: Outlet cover has been installed
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 March 2024
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction, and a uniform load of 74 kilograms per meter (50 pounds per foot) applied to the top rail in any direction. Marine inspector identified cracked welds along railing IVO aft life-raft station and cracked/broken welds at removable gate on forward deck. Repair must be made to the satisfaction of the attending marine inspector
46 CFR 116.900
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2024
Resolved 15 April 2024
Resolution: MI verified damaged railings have been repaired satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 March 2024
Resolved
An internal structural examination conducted ... may be conducted while the vessel is afloat or out of the water and consists of a complete examination of the vessel's main strength members, including.. the hull plating. Observed pitting inboard of steering ram in starboard lazarette void between frames 1 and 2 and in fuel tank void aft of ladder.Make repairs prior to credit dry dock.
46 CFR 115.610
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 July 2024
Resolved 30 July 2024
Resolution: MI reinspected area during dry dock, unable to identify areas of pitting.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 March 2024
Resolved
An internal structural examination conducted in compliance with 115.600 of this part may be conducted while the vessel is afloat or out of the water and consists of a complete examination of the vessel's main strength members. Deteriorating welds observed in port sewage void at forward watertight bulkhead, and starboard lazarette between frames 5 and 6 outboard of sea chest.Make repairs prior to credit dry dock
46 CFR 115.610
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 July 2024
Resolved 30 July 2024
Resolution: MI reinspected areas during dry dock, unable to identify wasted welds.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 1 June 2023
Resolved
..A visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: A space with a through-hull fitting below the deepest load waterline, such as a lazarette; A machinery space bilge, bilge well, shaft alley bilge, or other spaces subject to flooding from sea water piping within the space... Audible alarm for the starboard engine room is not operational.
46 CFR 182.530
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2023
Resolved 15 June 2023
Resolution: Attended vessel verified Audible alarm
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 1 June 2023
Resolved
Penetrations in A-Class fire control boundaries for electrical cables, pipes, trunks, ducts, etc. must be constructed to prevent the passage of flame and smoke for one hour. In addition, the penetration must be designed or insulated so that it will withstand the same temperature rise limits as the boundary penetrated...Bulkheads between various spaces must meet the requirements of Table 116.415(b).... Cable transiting through vapor barrier in engine room space is not maintaining A-Class fire control boundary. Repair or replace vapor barriers in port and starboard engine rooms.
46 CFR 116.415
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2023
Resolved 15 June 2023
Resolution: Attended vessel, verified proper installation of vapor barrier.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 1 June 2023
Resolved
Each hatch exposed to the weather must be watertight, ..
Starboard bow hatch cover allows water intrusion,
replace gaskets on all hatches exposed to weather.
Hatches to be hose tested to the satisfaction of the
attending Marine Inspector.
46 CFR 174.220
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2023
Resolved 15 June 2023
Resolution: Attended vessel, verified new gaskets installed and watertight integrity
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 1 June 2023
Resolved
After loading and prior to departure, and at all other times necessary to assure the safety of the vessel, the master shall determine that the vessel complies with all applicable stability requirements in the vessel's stability letter, and Certificate of Inspection ... The vessel's bilges and voids shall be kept pumped to a minimum content at all times consistent with pollution prevention requirements.. Starboard collision void contained an excess amount of water.
46 CFR 122.3015
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 June 2023
Resolved 1 June 2023
Resolution: Operator pumped water out of Starboard collision void while CG was present.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 15 August 2022
Resolved
Periodic safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. While conducting DVTP's, actions conducted and the expected result were inconsistent with one another and not in accordance with DVTP procedures.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 August 2022
Resolution: DVTP’s were conducted to the satisfaction of the attending Marine Inspector and MSC. Minor changes to the procedures were submitted to MSC for official approval. All SAT.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 26 May 2022
Resolved
New stability letter has not yet been received from MSC. Must be on board prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 August 2022
Resolved 22 August 2022
Resolution: Vessel received new stability letter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 May 2022
Resolved
New engines have been installed and DVTP's must be performed to the satisifaction of the attending MI, prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 August 2022
Resolved 22 August 2022
Resolution: DVTP’s were conducted to the satisfaction of the attending Marine Inspector and MSC. Minor changes to the procedures were submitted to MSC for official approval. All SAT.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 28 March 2022
Resolved
A fire control plan must show escape routes, areas of refuge, embarkation stations, the location of fire protection/emergency equipment, compartment titles and hazard classification of accommodation and service spaces and structural fire protection boundries. FCP does not identify all required safety items.
46 CFR 116.530
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 14 October 2022
Resolution: Vessel corrected and posted FCP.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 12 January 2022
Resolved
"A fire control plan must be posted on the vessel and visible to all passengers. The plan must show escape routes, areas of refuge, embarkation stations, the location of the fire protection/emergency equipment, compartment titles and hazard classification of accommodation and service spaces, and structural fire protection boundaries." Fire control plan currently onboard is not approved/does not meet regulation. 46 CFR 116.530
Action required: 705 - Other - as specified
Due 12 February 2022
Resolved 22 February 2022
Resolution: Operator submitted fire control plan. Inspectors reviewed plan, with erros found and corrections to be made prior to final approval.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 12 January 2022
Resolved
"The Coast Guard will issue a medical certificate to a mariner meeting the medical and physical standards for merchant mariners. The medical certificate will be issued for various amounts of time based upon the endorsements the mariner holds." Master's medical card is expired, master will be replaced in the interim until appointment and medical card are approved. 46 CFR 10.301
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 April 2022
Resolved 23 March 2022
Resolution: Operator provided valid medical certificate.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 January 2022
Resolved
"Where provisions are made for charging batteries, there must be natural or induced ventilation sufficient to dissipate the gases generated" Port exhaust vent for battery space, would not open, remained closed. 46 CFR 120.350
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 12 January 2022
Resolved 12 January 2022
Resolution: Operator fixed port exhuast vent- now operable to open and close.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 12 January 2022
Resolved
"A hatch exposed to the weather must be watertight. A hatch cover must have securing devices." Lazarette space, water-tight hatch missing lanyard. 46 CFR 116.116
Action required: 10 - Deficiency Rectified
Due 12 January 2022
Resolved 12 January 2022
Resolution: Operator added sufficient lanyard.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 March 2019
Resolved
A fixed gas fire extinguishing system aboard a vessel must have a device to automatically shut down engines that draw intake air from the protected space prior to release of the extinguishing agent into the space. The vessel's main engine shutdown relay was corroded and caused the main engine to shutdown unexpectedly. Renew shutdown relay to proper operation IAW 46CFR118.410. Provide service technician report to satisfaction of Marine Inspector.
Action required: 10 - Deficiency Rectified
Due 18 March 2019
Resolved 18 March 2019
Resolution: Relays replaced and technician report provided to the satisfaction of the Marine Inspector.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 11 September 2018
Resolved
IMO: Vsl is broadcasting no IMO #, ZERO DRAFT: no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 4 November 2019
Resolution: Verified AIS errors were corrected via NAVCEN Vessel Database.
Engineering › Sea-water System (primary cooling) › Piping
Issued 8 June 2017
Resolved
Repair pinhole leaks on port and starboard main diesel engine exhausts. 46CFR119.430
Due 8 June 2017
Resolved 13 November 2017
Resolution: Observed installation of new exhaust. New exhausts fabricated out of pipe fittings that are 316L with a SCH 40 wall thickness. Observed during sea trial.
Engineering › Sea-water System (primary cooling) › Pump
Issued 30 March 2017
Resolved
Prove proper operation of port MDE prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 March 2017
Resolution: Completed satisfactory sea trials following repairs.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 17 May 2016
Resolved
Vessel had unathorized fiberglass patch repair on the port generator exhaust manifold.
Action required: 705 - Other - as specified
Due 17 July 2016
Resolved 7 June 2016
Resolution: Operator replaced section of pipe by crop/renew.