Records from 2016 to 2017. Most recent: inspection, 22 November 2017.
Lifesaving › Lifefloat › Serviceable
Issued 24 October 2016
Resolved
Life Floats cracked/in need of repair for gouges and missing fiberglass. Repair or rpelace prior to 24NOV16. Vessel limited to no more than (3) NM from shore until replaced. Ensure complete life floats provided to include oars.
Action required: 705 - Other - as specified
Due 24 November 2016
Resolved 16 December 2016
Resolution: Life floats repaired.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 24 October 2016
Resolved
Replace or repair lenses on port and starboard running lights.
Action required: 705 - Other - as specified
Due 7 November 2016
Resolved 16 December 2016
Resolution: Light lenses renewed.
Lifesaving › Lifebuoys › Serviceable
Issued 24 October 2016
Resolved
Life ring plug dry rotted. Replace.
Action required: 705 - Other - as specified
Due 24 October 2016
Resolved 24 October 2016
Resolution: Corrected on the spot. New Life Ring purchased.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 24 October 2016
Resolved
Life ring waterlight waterlogged and inoperable. Demonstrate proper operation.
Action required: 705 - Other - as specified
Due 24 October 2016
Resolved 16 December 2016
Resolution: Light verified as operational.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 24 October 2016
Resolved
Replace expired burn gel and ammonia in first aid kit. Provide complete first aid kit.
Action required: 705 - Other - as specified
Due 7 November 2016
Resolved 16 December 2016
Resolution: New first aid kit provided.
Construction/Loadline › Hull › Stiffener
Issued 24 August 2016
Resolved
Work List: Replace rotted wood boards in lower forward compartment and investigate plywood behind for signs of rot.
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 30 August 2016
Resolution: Area repaired as required.
Construction/Loadline › Hull › Longitudinal Frame
Issued 24 August 2016
Resolved
Re-glass delaminating FRP on inboard engine mount / longitudinal forward engine room.
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 30 August 2016
Resolution: Area repaired as required.
Construction/Loadline › Hull › Longitudinal Frame
Issued 24 August 2016
Resolved
Sand and reglass wood on engine mount / longitudinals inboard and starboard side in aft engine room.
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 30 August 2016
Resolution: Longitudinals repaired as required.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 24 August 2016
Resolved
Replace / Insert broken vertical stanchion in engine room port side second from forward bulkhead.
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 30 August 2016
Resolution: Stanchion repaired and re-fiberglassed.