MAURY USCG vessel records
← All vessels

CMA CGM VENTANIA

CMA CGM VENTANIA is a 2007 freight ship. The Coast Guard has recorded 29 inspections since 2018, most recently in April 2026, along with 15 deficiencies and 6 operational controls.

Records from 2018 to 2026. Most recent: inspection, 14 April 2026.

Built
2007
Last inspected
14 April 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 14 April 2026
…with no type recorded7
Operational controls None recorded without a removal date
Years with a record 5 calendar years (2018–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9376907
979738
Flag
PORTUGAL
Maury page id
psix-979738

Documentation record

Tonnage as PSIX records it17201 - Dead Weight, Ton
16162 - Convention (Subpart B), Gross Ton
24558 - Displacement, Ton
6128 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 29

14 April 2026 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8349455
13 January 2026 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8295721
22 December 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8286381
2 December 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8276169
17 November 2025 PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8269519
11 September 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8231588
20 August 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8214263
28 July 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8196773
8 July 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8178906
27 May 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8145204
7 May 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8130263
18 April 2025 PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8113956
15 April 2025 COE-Administrative
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8115598
19 April 2024 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7895367
19 April 2024 ISPS Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7895488
28 March 2024 PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7884373
2 September 2023 PSC B · Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7781600
11 August 2023 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7763119
23 February 2023 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7640798
22 February 2023 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7639213
16 February 2023 PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7637798
14 October 2018 NPV Safety Exam · Administrative Inspection · ISPS III Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6560839
10 October 2018 PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6558197
10 October 2018 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6558238
10 October 2018 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6561555
29 September 2018 ISM Exam · PII Safety Exam · ISPS II Exam · Deficiency Check · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6549353
29 September 2018 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6551126
27 September 2018 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6549700
27 September 2018 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6549735

Deficiency record · 15

11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 17 November 2025 Resolved
Rescue boats shall be stowed: in a state of continuos readiness for launching in not more than 5 min, PSCO observed that the rescue boat was not able to be started within 5 minutes. 74 SOLAS (20) III/14.1 Code 10
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 November 2025
Resolved 17 November 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Construction (including exempt.)
Issued 2 September 2023 Resolved
The intermediate and annual surveys and the inspections of the outside of the ship's bottom...shall be endorsed on the Cargo Ship Safety Construction certificate. The inspection of the ship's bottom done in 2020 was not listed on the SOLAS Cargo Ship Safety Construction Certificate.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2023
Resolved 2 September 2023
Resolution: DNV submitted corrected SOLAS Cargo Ship Safety Construction Certification.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 16 February 2023 Resolved
In a ship in which oil fuel is used, the arragnements for the storage. distrubution and utilization of the oil fuel shall be such to ensure the safety of the ship and persons on board. PSCO observed pooling of fuel oil on ships main engine and active fuel oil leak from auxillary engine #2 fuel filter. 74SOLAS(20)II-2/4.2.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 February 2023
Resolution: Class report attested to swapped filters and tightened seals on the fuel oil pump. Oil cleaned and no more leages. No further action required.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 February 2023 Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occur: Fire detection and fire alarm systems. PSCO observed missing fire detector above purifier flat. 74SOLAS(20)II-2/14.2.1.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 February 2023
Resolution: Class survey stated fire detector replaced above purifier flats. Class issued short-term CSSEC with exemption certificate for fault in ECR fire detection system repeater shown in documents tab.
14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 16 October 2018 Resolved
1730- Pollution Prevention- To avoid willful manipulation, every access of the 15 PPM bilge alarm beyond the essential requirements of paragraph 4.2.8 requires the breaking of a seal. PSCO observed the 15 PPM bilge alarm missing its necessary/required seal. - MARPOL ANNEX 1 Reg.14.7 MPEC 107(49) 4/2.10.1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 October 2018
Resolved 17 October 2018
Resolution: Oil content meter was calibrated, tested and verified as per makers instruction by technician from Total Marine Solutions inc. See Attached survey statement.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 16 October 2018 Resolved
1730- Pollution Prevention- 15 PPM bilge separators should be capable of producing an effluent for discharge to the sea containing not more than 15 PPM of oil content of the feed supplied to it. During test of the OWS, PSCO observed oil content meter reach 15ppm, alarm sounded and the three-way valve activated. Crew unable to test oil filtering equipment after alarm sounded. No effluent was able to be produced. -MARPOL ANNEX 1 Reg.14.7 MPEC 107(49) 1/1/2/1
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2018
Resolved 22 February 2023
Resolution: PSCO witnessed satisfactory testing of OWS. Deficiency cleared.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 16 October 2018 Resolved
1730- Safety Management Systems- The company should establish procedures, to ensure that the ship is maintained in conformity with relevant rules and regulations. In meeting these requirements, the company should ensure that inspections are held at appropriate intervals. The ship's maintenance checklists do not include inspections intervals for oil filtering equipment in accordance with manufacturers instructions. PSCO observed manufacturers maintenance instruction which requires annual cleaning and inspection of filtering media. Date of Aug 2017 marked on OWS. No other record of OWS cleaning or inspection since that date. -74SOLAS(04 Cons.) IX/5 ISM Code 10.2
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 October 2018
Resolved 17 October 2018
Resolution: The oily water separator was cleaned by ship staff.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 16 October 2018 Resolved
1430- Propulsion an Auxiliary Machinery- The machinery shall be of a design and construction adequate for the service for which they are intended and shall be installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces, and other hazards. Hot exhaust piping is present on three generators and is not properly protected or lagged to avoid hazard to crew. -74SOLAS(04 Cons.) II-I/2.1
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 16 October 2018
Resolved 17 October 2018
Resolution: Insulation lagging was put back in place and found in order.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 16 October 2018 Resolved
1710- Certificates & Documentation- Oil record book shall be kept on board, readily available for inspection for 3 years. PSCO requested all oil record books for the previous 3 year period. Crew was unable to produce any oil record book between January 2015 and February 2018. PSCO was not able to observe oil record books missing from this period. -MARPOL ANNEX I/17.6
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 16 October 2018
Resolved 16 October 2018
Resolution: The ORB were found and the deficiency was closed by USCG.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 October 2018 Resolved
Oil fuel pipes and their valves and fittings shall be of steel or other approved material. PSCO observed a plastic hose leading from the scavenger air box drain tank line to a plastic container in the engine room. SOLAS 74(a) 09 cons. II-2/4.2.2.5.1
Action required: 17 - Rectify deficiencies prior to departure
Due 11 October 2018
Resolved 12 October 2018
Resolution: Recieved conformation from class DNV-GL that bucket and line had been removed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 10 October 2018 Resolved
Before the ship leaves port and at all times during the voyage, all life saving equipment shall be in working order and ready for immediate use. PSCO observed a chain around the liftboat launching hook. Ship's crew could not provide procedures for installation or removal. Ship's crew removed the chain. SOLAS 74(a) 09 cons. III/20.2
Action required: 10 - Deficiency Rectified
Due 10 October 2018
Resolved 10 October 2018
Resolution: Ship's crew removed the chain.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 29 September 2018 Resolved
Objective evidence discovered during an expanded ISM exam revealed the following non-conformities. These discrepancies, included with the other material deficiencies, are evidence the ship/company is not implementing the requirements of the ISM Code through the approved SMS procedures. An external audit is recommended. SOLAS 2014 IX/3.1 ISM Code 1.3 The responsibility and authority of the designated person or persons should include monitoring the safety and pollution-prevention aspects of the operation of each ship and ensuring that adequate resources and shore-based support are applied, as required. The crew reported the excessive engine room leaks to the DPA on September 11. The DPA replied on September 12 that supplies would be delivered at the next port after overhaul of AE1 (est. 6-8 hours). The vessel has since called on four ports over seventeen days and no supplies have been delivered to address the identified hazardous condition in the engine room. Adequate resources and shore-based support are not being applied, as required. SOLAS 2014 IX/3.1 ISM Code 4 The company should ensure that the master is: fully conversant with the company’s safety management system. The SMS requires that the master report safety/environmental/security issues via various emails. The master did not use the email address and instead attempted to address the issue via the electronic NP5 program onboard, which is an internal messaging system usually used for “work orders, standard jobs, parts or items, equipment and so forth.” The company may have not recognized the urgency of the request because an improper medium was used to convey it. SOLAS 2014 IX/3.1 ISM Code 6.1.2 The company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel. The crew member assigned the responsibility of checking lifeboat provisions marked the relevant monthly checklist for three months that all provisions were accounted for. However, during the examination of the lifeboat (certified for 32 persons), only 18 food rations were onboard. The lifeboat was missing 14 food rations, and there were 19 crew members onboard. SOLAS 2014 IX/3.1 ISM Code 7 The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. The current condition of the engine room is indicative a lack of preventative maintenance to ensure a safe working environment. SOLAS 2014 IX/3.1 ISM Code 10.1
Action required: 30 - Ship detained
Resolved 30 September 2018
Resolution: The vessel submitted a class shipboard audit report stating DNV-GL carried out an additional ISM audit.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 29 September 2018 Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to control the leak of flammable liquids. There is fuel oil running in streams on the main engine, there are active fuel leaks on the running generator and jacket water leaks on the main engine, the bilge is coated in wet oily waste with several oil saturated rags floating within, and the deck plates in the lower deck of the engine room are slippery with oil. PSCOs in Martinique wrote a deficiency for the similar issues on 10 September 2018, and no apparent corrective action has been taken since then. The condition represents a severe fire hazard. 74 SOLAS 2014 II-2/4.1.1
Action required: 30 - Ship detained
Resolved 30 September 2018
Resolution: The vessel addressed the oil running streams on the main engine and generator. Bilges were emptied of rags and oily waste. DNV-GL was made aware of the deficiencies identified in Martinique.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 September 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. The vessel lost propulsion while operating astern, and the crew was unable to restart the engine. Attending tug boats brought the vessel to the pier.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 September 2018
Resolution: The vessel has submitted a DNV-GL survey attesting for the satisfactory repairs made to numbers 2, 3, 7 and 8 main engine valves fuel pump punctures. The leaks on units 1, 2 and 5 cooling water were rectified. Main engine reversing cylinders 3 and 7 were
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Construction (including exempt.)
Issued 29 September 2018 Resolved
The normal equipment of every lifeboat shall consist of food rations of each totaling not less than 10,000kj for each person the lifeboat is permitted to accommodate; these rations shall be kept in an airtight packaging and stowed in a watertight container. Fourteen of the thirty-two rations were damaged by water. The vessel has nineteen people onboard and only eighteen of the rations were viable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 September 2018
Resolution: The vessel submitted a DNV-GL survey stating that new food rations were replenished for 15 persons.

Ownership record