Records from 2010 to 2026. Most recent: inspection, 10 September 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 28
10 September 2026
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8488848
23 January 2026
Administrative Inspection · Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8308480
30 December 2025
Internal Structural Exam · Administrative Inspection · Drydock Extension
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8288291
16 September 2025
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8237028
10 September 2024
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7943556
16 May 2024
Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7913377
17 October 2023
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7810032
11 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7806720
29 June 2023
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7709733
8 June 2023
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7709707
3 February 2022
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7390196
20 October 2021
Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7336534
12 January 2021
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7123425
22 January 2020
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6893753
30 October 2019
Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6854857
25 January 2019
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6614881
17 April 2018
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6393188
25 July 2017
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6220306
25 January 2017
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6075502
24 October 2015
DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5749876
29 July 2015
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5199713
21 October 2014
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5009342
8 May 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4454589
12 August 2011
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4116098
3 August 2011
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4103933
25 July 2011
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4093427
20 July 2011
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4088985
2 February 2010
Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3673897
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 September 2025
Resolved
A vessel must be provided with an auxiliary means of steering that is: A suitable hand tiller may be acceptable as the auxiliary means of steering where satisfactory to the cognizant OCMI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2025
Resolved 19 September 2025
Resolution: Tiller handle was replaced.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 22 January 2020
Resolved
Provide passenger safety orientation placard(s).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 February 2020
Resolved 23 January 2020
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 22 January 2020
Resolved
Engine space hatch cover gasket is wasted. Replace gasket.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 February 2020
Resolved 23 January 2020
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 22 January 2020
Resolved
Re-stencil (03) fire buckets.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 February 2020
Resolved 23 January 2020
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 25 January 2019
Resolved
Demonstrate proper operation of machinery space audible and visual bilge high level alarm.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 February 2019
Resolved 15 March 2019
Resolution: Vessel demonstrated operation of bilge high level alarm.
Fire Fighting › Fixed Gas Fire Extinguishing System › Control Valve
Issued 17 April 2018
Resolved
Prove proper operation of fixed fire extinguisher engine shut down.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 May 2018
Resolution: Fixed extinguisher shut-down properly repaired.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 17 April 2018
Resolved
Provide means of securing engine room ventilation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2018
Resolution: New vent cover installed.
Documentation › Markings/Placards › Oil Discharge Placard
Issued 17 April 2018
Resolved
Provide MARPOL I Oil Pollution placard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: Placard posted.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 17 April 2018
Resolved
Renew or replace ring buoy life line.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: Life line replaced.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 17 April 2018
Resolved
Replace ring buoy water light.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: New light installed.
Documentation › Markings/Placards › Warning Signs
Issued 17 April 2018
Resolved
Provide fire extinguisher placard for forward fire extinguisher.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: Placard posted.
Engineering › Diesel Engine (propulsion-reduction gear) › Air Cleaner
Issued 17 April 2018
Resolved
Prove proper operation of emergency engine shutdown pull handle.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: New cable installed.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 17 April 2018
Resolved
Post or make available COI and Stability letter.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2018
Resolution: COI Posted.
Documentation › Markings/Placards › Lifejacket Placard
Issued 17 April 2018
Resolved
Post life jacket placard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: Placard posted.
Documentation › Markings/Placards › Lifejacket Placard
Issued 17 April 2018
Resolved
Label forward life jacket storage.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: Placard posted.
Documentation › Manifests/Lists › Muster List/Emergency Instructions
Issued 17 April 2018
Resolved
Post emergency instructions for Fire, MOB and heavy weather.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: Emergency instructions posted.
Fire Fighting › Fire Bucket › Availability
Issued 17 April 2018
Resolved
Provide (03) fire buckets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: Fire buckets on board.
Accommodation/Occupational Safety › Occupational Safety › Lifeline
Issued 17 April 2018
Resolved
Provide ladder for man overboard retrieval.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: Ladder installed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 17 April 2018
Resolved
Provide current first aid kit.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2018
Resolution: New first aid kit installed.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 25 January 2017
Resolved
Provide employee assistance program hotline numbers in employee spaces.
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 31 January 2017
Resolution: Vessel provided and posted hotline numbers.
Engineering › Bilge Water Management System › Pump
Issued 25 January 2017
Resolved
Secure bilge pump and switch in place in forward bilge.
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 31 January 2017
Resolution: Vessel secured in place.
Electrical › Electric Supply System (service) › Battery Installation
Issued 25 January 2017
Resolved
Secure batteries from movement in battery box.
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 31 January 2017
Resolution: Batteries secured.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 25 January 2017
Resolved
Replace corrosion resistant clip for ring buoy waterlight.
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 31 January 2017
Resolution: Clip replaced by vessel.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 26 October 2015
Resolved
Prove proper operation of fixed fire extinguishing automatic engine shut-down.
Due 2 November 2015
Resolved 26 October 2015
Resolution: Tested automatic shut-down for fixed fire fighting system. Op check satisfactory.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 26 October 2015
Resolved
Provide ship's name on lifebuoy.
Action required: 705 - Other - as specified
Due 13 November 2015
Resolved 30 October 2015
Resolution: Ring Buoy Properly Marked.
Documentation › Manifests/Lists › Muster List/Emergency Instructions
Issued 26 October 2015
Resolved
Post emergency instructions.
Action required: 705 - Other - as specified
Due 13 November 2015
Resolved 30 October 2015
Resolution: Emergency placard ordered. Invoice witnessed.
Fire Fighting › Fire Bucket › Availability
Issued 21 October 2014
Resolved
Provide required fire buckets.
Action required: 705 - Other - as specified
Due 28 October 2014
Resolved 6 February 2015
Resolution: Fire buckets installed.
Engineering › Steering Gear System › Ram
Issued 21 October 2014
Resolved
Make permanent repairs to steering ram bracket.
Action required: 705 - Other - as specified
Due 7 November 2014
Resolved 6 February 2015
Resolution: New bracket installed.
Engineering › Bilge Water Management System › Hose
Issued 3 August 2011
Resolved
REPLACE BILGE HOSES.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2011
Communications › Alarms/Indicators › High Water Alarm
Issued 3 August 2011
Resolved
PROVE AUDIBLE ALARM FOR HIGH WATER ALARM SYSTEM.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2011
Communications › Radio Communications › VHF Radiotelephone
Issued 3 August 2011
Resolved
PROVE OPERATION OF VHF RADIO.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2011
Personnel › Training › Ship Maneuvering and Handling
Issued 3 August 2011
Resolved
CONDUCT OPERATIONAL CHECK RIDE.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2011
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 2 February 2010
Resolved
Noted pre-engineered fire extinguisher not serviced/inspected annually as required by 46CFR176.810(b). Ensure annual service/inspection complete.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 February 2010
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 2 February 2010
Resolved
B-II portable fire extinguisher not installed as required by 46CFR181.520. Install as discussed.
Action required: 705 - Other - as specified
Due 3 February 2010
Resolved 3 February 2010