MAURY USCG vessel records
← All vessels

ROBERT S. PIERSON

ROBERT S. PIERSON is a 1974 freight ship. The Coast Guard has recorded 32 inspections since 2016, most recently in June 2026, along with 8 deficiencies and 2 operational controls.

Records from 2016 to 2026. Most recent: inspection, 25 June 2026.

Built
1974
Last inspected
25 June 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 25 June 2026
…with no type recorded7
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7366403
CFN4934
983828
Flag
CANADA
Maury page id
psix-983828

Documentation record

Tonnage as PSIX records it6269 - Regulatory (Subpart C or D), Net Ton
19916 - Dead Weight, Ton
10037 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 32

25 June 2026 Deficiency Check · Administrative Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8413529
28 May 2026 Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8382539
4 December 2025 Deficiency Check · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8277665
27 November 2025 Deficiency Check · In-Service Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8274716
27 November 2025 Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8276125
20 November 2025 PSC B · Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8271974
13 May 2025 Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8134929
12 May 2025 PSC B · MARPOL Annex I Examination · Canadian Vsl Safety Exam (D9 only)
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8133186
8 May 2025 Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8131074
29 April 2025 In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8126749
26 April 2025 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8120565
23 April 2025 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8121497
7 December 2024 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8044462
6 November 2024 In-Service Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8031403
6 November 2024 Type not recorded
No type recorded · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8045884
4 November 2024 Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8028820
18 October 2024 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8021307
13 October 2024 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8022909
8 June 2023 Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7710332
16 June 2021 Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7226355
29 May 2020 Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6963374
28 May 2020 Deficiency Check · In-Service Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6962536
13 May 2020 Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6952483
6 January 2020 Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6883649
21 October 2019 Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6838478
9 April 2019 Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6658684
28 December 2018 Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6603423
24 December 2018 Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6602678
12 October 2018 Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6559321
26 August 2018 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6547585
6 September 2017 Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6259591
1 September 2016 Administrative Inspection · Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5989279

Deficiency record · 8

07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 20 November 2025 Resolved
Interior stairways below the weather deck shall be of steel or other suitable material. Crew lift trunks within accommodation shall be of steel or equivalent material. PSCO observed pipe penetration without fire sealant surrounding it and a separate hole approximately one inch in diameter in the crew staircase near fire station 12 both of which were not in accordance with the approved fire control plan and the Class A boundary requirements.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2025
Resolved 25 November 2025
Resolution: A survey was conducted by class indicating that inspected items were satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 20 November 2025 Resolved
Interior stairways below the weather deck shall be of steall or other suitable material. Crew lift trunks within accommadation shall be of steel or equivalent material. PSCO observed the fire doors on the Spar deck leading to the deack above on the port side near fire station 12 was being held open and subsequently would not latch completely. The fire door exiting from the Engine Room would not close or latch completely. Per the approved fire control plan, both doors are to be self closing and A Class.
Action required: 10 - Deficiency Rectified
Due 20 November 2025
Resolved 20 November 2025
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 6 November 2024 Resolved
An inspection either general or partial depending upon the circumstances shall be made whenever any important repairs or alterations are undertaken. Vessel reported that the number three port ballast tank was taking on water at or near the centerline bottom plating. Vessel shall ensure that appropriate repairs are completed and verified to the satisfaction of the vessel's classification society.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 November 2024
Resolution: Ballast water tank plug replaced and class report received (see documents)
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 November 2024 Resolved
The respective piping systems installed on ships must have the neccessary valves for the safe and efficent operation of the vessel. Valve on port side near cargo hatch 18 leaking while in closed position.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2024
Resolved 25 November 2024
Resolution: Deficiency cleared LR report attached
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 November 2024 Resolved
Electrical installations on vessel must ensure protection of passengers, crew and other person and the vessel from electrical hazards. Trunk space housing cable run missing cover.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 5 November 2024
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 8 June 2023 Resolved
02113 - THE GENERAL STRUCTURAL STRENGTH OF THE HULL MUST BE SUFFICIENT FOR THE DRAUGHT CORRESPONDING TO THE FREEBOARD ASSIGNED AND MUST BE APPROVED BY THE COMMANDANT. SHIPS BUILT AND MAINTAINED IN CONFORMITY WITH THE REQUIREMENTS OF A CLASSIFICATION SOCIETY MAY BE RECOGNIZED BY THE COMMANDANT AS POSSESSING ADEQUATE STRENGTH. MV ROBERT S PIERSON DISCOVERED A CRACK ON THE FORWARD PORT QUARTER APPROXIMATELY 5 INCHES IN LENGTH. 46 CFR 45.107, 17ac
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2023
Resolution: Rcvd class rpt approving vessel to transit to Kingstown, Canada for repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 May 2020 Resolved
33 CFR 160.216-40AC-Vessel has recently reported that the starboard engine has a crack in the cylinder liner and the vessel is transiting at reduced speed on one engine. Vessel is authorized to transit to Motor City Dock in the Detroit River to offload and then proceed to Canada to effect repairs. After returning to Canadian waters and prior to re-entry into U.S. waters, the vsl shall provide for class attendance to confirm repairs as original to the stbd main engine. If continued transit on one main engine is desired vsl shall coordinate with sector detroit for approval to operate within U.S. waters.
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 June 2020
Resolution: Class attended and witnessed appropriate repairs and operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 December 2018 Resolved
1410 - Propulsion Main Engine - All installations shall be of marine type engines suitable for the intended service, design and constructed in conformance with the requirements of this subchapter. The Port main engine suffered a crank shaft failure resulting in the vessel operating solely on the Starboard engine. The vessel may operate under reduced propulsion for 60 days in accordance with D9INST 16711.1, as long as the vessel is capable of maintaining safe speed and steerage for prevailing or anticipated conditions. The vessel must also have a fully functional bow thruster, two fully operational generators, and the Master and Chief Engineer must provide Sector Detroit with a written statement attesting to the vessel's capability to maneuver properly as well as the suitability of the reduced propulsion machinery to generate thrust.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 February 2019
Resolved 9 April 2019
Resolution: CERTFICIATE OF CLASS WAS ENDORSED ON 07 APR 2019.

Ownership record