Records from 2016 to 2026. Most recent: inspection, 14 January 2026.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 November 2025
Resolved
Bilge systems visual indicators did not light up when automatic bilge pump operated, repair audible indicator for 01 high level alarm.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2026
Resolved 22 December 2025
Resolution: Found loose wire and repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 18 November 2025
Resolved
Retro reflective tape was found deteriorated on 02 Lifefloats, replace damaged retro, and replace tether line.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2026
Resolved 22 December 2025
Resolution: Tether line replaced and damaged retro replaced.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 18 November 2025
Resolved
EPIRB expiration sticker was past due, replace registration sticker once received. Owner has already renewed registration but has not received the sticker.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2026
Resolved 22 December 2025
Resolution: Registration sticker was placed on EPIRB.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 November 2025
Resolved
Replace plastic fire hose nozzle with approved nozzle.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2026
Resolved 22 December 2025
Resolution: Brass nozzle ordered and placed onboard.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 2 December 2024
Resolved
An interconnected detection and alarm system must be installed such that the actuation of alarm in one area results in both audible and visual alarms in all areas to be protected by the interconnected detection. There is no interconnected detection and alarm system. Limited to within a limited coastwise voyages.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 12 December 2024
Resolution: Interconnected system provided.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 2 December 2024
Resolved
Stowed in a way that neither the survival craft nor its stowage arrangements will interfere with embarkation and operation of any other survival craft. The painter lines for the life floats are too short to be launched without interference.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2024
Resolved 12 December 2024
Resolution: Satisfactory arrangement provided.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 2 December 2024
Resolved
A penetration in a watertight bulkhead must be made watertight. Shift cable penetration through multiple bulkheads are not watertight.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2024
Resolved 12 December 2024
Resolution: Penetrations sealed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 December 2024
Resolved
At each inspection for certification, the vessel owner shall be prepared to have the vessel ready for inspections of the hull structure. Center line stern frame fastener has failed.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2024
Resolved 12 December 2024
Resolution: Frame secured with metallic straps, screws and caulk. Deficiency issued for permanent repair at next drydock.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 December 2024
Resolved
At each inspection for certification, the vessel owner shall be prepared to have the vessel ready for inspections of the hull structure. Center line stern frame temporarily secured with metallic strips and screws.
1. Monitor frame for movement.
2. Reapir to original at next drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 27 January 2026
Resolution: Verified proper and permanent repairs made and satisfied.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 December 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Repair Starboard Propulsion Transmission hose.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 January 2021
Resolved 23 December 2020
Resolution: Hydraulic hose replaced, system tested SAT.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 14 December 2020
Resolved
The minimum number of portable fire extinguishers required on a vessel must be acceptable to the cognizant Officer in Charge, Marine Inspection, but must not be fewer than the minimum number required. Provide fire extinguishers as per COI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 January 2021
Resolved 23 December 2020
Resolution: Fire extinguisher replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 14 December 2020
Resolved
The float-free link required by §180.130(a)(1) must be Certified to meet §160.073 in subchapter Q. Provide float-free link ID tag.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021
Resolved 23 December 2020
Resolution: Float free link replaced
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 14 December 2020
Resolved
Each vessel must be equipped with at least two operable portable battery lights. Provide portable lights for operating station and at access to propulsion machinery space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021
Resolved 23 December 2020
Resolution: Portable battery operated lights provided.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 December 2020
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021
Resolved 23 December 2020
Resolution: All DAPI requirements met.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 September 2020
Resolved
All vessels shall be drydocked and subject to inspection. The items listed a) through c) shall be be completed before the vessel is placed back in the water. All items shall be inspected by a marine inspector before receiving credit for drydock.
a) Damage to FRP on various areas of the hull below and near water line exposing chop strand. Provide a repair proposal.
b) Various small areas of coating failure noted throughout the hull. Re-coat all exposed FRP.
c) Replace water lubricated bearings on port and starboard shaft struts.
d) Replace rotted longitudinal frames under port and starboard engines as well as aft transverse frame.
e) Wood rot in lazarette in port overhead deck, provide repair proposal.
f) Non-metallic fuel lines must be approved type SAE-J-1942, less than 30 inches long with metallic fittings for bulkhead penetrations.
g) Properly seal hull penetrations on port and starboard exhaust pipe discharge.
h) Properly seal forward bulkhead exhaust penetration in
lazarette.
i) Properly seal penetrations at located top of forward lazarette bulkhead.
j) Properly seal hydraulic line bulkhead penetrations in forward compartment and forepeak.
k) Properly seal forward bulkhead fixed bilge pipe penetration.
l) Fixed bilge system piping in lazarette and forward compartment missing strainers.
m) Securely attach engine room ladder.
n) Repair broken hydraulic support brackets in forepeak.
o) Replace heat sensor and wiring on starboard engine.
p) Starboard engine raw water cooling valve difficult to fully close.
q) Properly secure starboard engine raw water strainer.
r) Install double hose clamps on electric submersible bilge pump overboard discharge in engine room and on MSD tank flexible hoses.
s) Properly secure port and starboard exhaust supports.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 October 2020
Resolved 12 November 2020
Resolution: Worklist items a a through q complete, remaining items converted to deficiencies.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 6 January 2020
Resolved
EACH DISPOSABLE HYDROSTATIC RELEASE UNIT MUST BE MNARKED WITH AN EXPIRATION DATE OF TWO YEARS AFTER THE DATE ON WHICH THE UNIT IS INSTALLED. HYDROSTATIC RELEASE UNIT IS EXPIRED. HAVE THE HYDROSTATIC RELEASE UNIT REPLACED.
***LIMITED ROUTE, NOT TO EXCEED 3NM ***
Action required: 705 - Other - as specified
Due 5 February 2020
Resolved 7 January 2020
Resolution: Captain sent pictures if new EPIRB with newly inspected hydrostatic release. Sent verification from NOAA that EPIRD has been registered to M/V MAJESTY.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 January 2020
Resolved
WHERE FLEXIBLE NONMETALLIC HOSE IS PERMITTED FOR HTE USE IN PIPING SYSTEMS BY THIS SECTION, IT MUST MEET SAE-J-1942. THE FUEL HOSE FITTED ON THE AFT FUEL TANK DID NOT MEET THESE STANDARDS. REPLACE HOSE WITH APPROVED SAE-J-1942 HOSE WITH APPROVED BULKHEAD PENETRATIONS SAE-J-1527. TO BE RECTIFIED BY COMPLETION OF THE NEXT DRYDOCK IN AUGUST 2020.
Action required: 705 - Other - as specified
Due 31 August 2020
Resolved 14 December 2020
Resolution: Verified proper installation to meet requirements.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 2 December 2019
Resolved
SHUTOFF VALVES INSTALLED SO AS TO CLOSE AGAINST THE FUEL FLOW. THE SHUTOFF VALVE AT THE TANK MUST BE MANUALLY OPERABLE FROM OUTSIDE THE COMPARTMENT IN WHICH THE VALVE IS LOCATED. BOLT ON THE SHUTOFF VALVE IS STRIPPED. REPLACE WITH A NEW WORKING HANDLE.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2020
Resolved 6 January 2020
Resolution: Went on board 6JAN20 and tested shutoff valve to the satisfaction of CG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 December 2019
Resolved
EXHAUST GAS MUST NOT LEAK FROM THE PIPING OR ANY CONNECTIONS. BOTH MAIN ENGINES HAVE EXHAUST LEAKS, ROUTE CRANKCASE EXHAUST PROPERLY.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2020
Resolved 6 January 2020
Resolution: 6JAN20 went on board to confirm crankcase exhaust leak has been fixed (rerouted to vent to atmosphere). Rectified to the satisfaction of CG.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 2 December 2019
Resolved
A VESSEL MUST COMPLY WITH THE APPLICABLE REQUIREMENTS FOR ANY RADIO INSTALLATIONS, INCLUDING THE REQUIREMENTS FOR A STATION LICENSE AND INSTALLATION CERTIFICATES.
-DOES NOT HAVE THE FCC SAFETY CERTIFICATE ON BOARD.
-VHF-DSC RADIO DOES NOT HAVE THE MMSI AND GPS INPUTED
-SSB IS NOT DSC CAPABLE
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2020
Resolved 6 January 2020
Resolution: Rectified to the satisfaction of CG
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 December 2019
Resolved
THE NUMBER OF PENETRATIONS IN A WATERTIGHT BULKHEAD MUST BE AS HIGH AND AS FAR INBOARD IN THE BULKHEAD AS PRACTICABLE AND MADE WATERTIGHT. VESSEL HAS PENETRATIONS NOT PROPERLY SEALED. USE PROPER SEALANT IN SEAL PENETRATIONS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2020
Resolved 6 January 2020
Resolution: Rectified to the satisfaction of CG
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 2 December 2019
Resolved
CHARTS OF LARGE ENOUGH SCALE TO MAKE SAFE NAVIGATION POSSIBLE. VESSEL DID NOT HAVE A PAPER CHART ONBOARD, GET A CHART FOR PROPER AOR.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2020
Resolved 6 January 2020
Resolution: Charts for the proper AOR were onboard.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 December 2019
Resolved
ON A VESSEL CARRYING MORE THAN 49 PASSENGERS, THE PUMP OUTLET MUST BE FITTED WITH A PRESSURE GUAGE. PRESSURE GUAGE DID NOT WORK. REPLACE GUAGE.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2020
Resolved 6 January 2020
Resolution: Pressure guage was added and tested to the satisfaction of the CG.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 September 2018
Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets. Mark stowage compartment.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 12 October 2018
Resolution: Verified proper stowage with required markings.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 September 2018
Resolved
A vessel on an oceans route must carry six hand orange smoke distress signals. Replace the 03 missing signals.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2018
Resolution: Approved distress flares purchased to meet minimum requirement.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 13 September 2018
Resolved
A visual and audible alarm must be provided at the operating station. Repair the stern bilge visual indicator.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 12 October 2018
Resolution: Verified visual and audible alarm at the operating station after activation of stern bilge high water level alarm.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 13 September 2018
Resolved
The items contained in first-aid kit shall be as listed
in table 160.041-4(b). Several items were missing.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 12 October 2018
Resolution: Verified required equipment was replaced.
01 - Certificates & Documentation › 013 - Documents › Ship specific plans for the recovery of persons from the water
Issued 13 September 2018
Resolved
The emergency instructions must be designed to address the particular equipment, arrangement, and operation of
the vessel. Add the use of the rescue ladder to the list
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 12 October 2018
Resolution: Verified emergency instructions were updated IAW shipboard procedures.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 13 September 2018
Resolved
Pre-engineered fixed gas fire extinguishing systems must automatically shut down engines that draw intake air from within the protected space. The SSDG did not shut
down upon activation.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 12 October 2018
Resolution: Verified automatic shutdown of SSDG upon activation of pre-engineered fixed gas extinguishing system.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 September 2018
Resolved
Display and distribution of a community service EAP hot-
line telephone number for crewmember assistance.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 12 October 2018
Resolution: Verified EAP number available for crewmember assistance.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 September 2018
Resolved
As an employer, you are responsible for meeting all applicable requirements and procedures for DAPI.
Prove with written compliance.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 31 October 2018
Resolution: DAPI plan was updated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 13 September 2018
Resolved
Repair hydraulic leak from steering gear ram.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 12 October 2018
Resolution: Verified repairs were made to hydraulic steering ram.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 September 2018
Resolved
Submit repair proposal and repair lazarette PORT ovhd deck wood rot prior to next drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 31 October 2018
Resolution: To be repaired at next drydock.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 September 2018
Resolved
Submit repair proposal and repair STBD engine bed wood rot prior to next drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 31 October 2018
Resolution: To be repaired at next drydock.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 September 2018
Resolved
Submit repair proposal and repair fore peak PORT ovhd wood rot prior to next drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 31 October 2018
Resolution: To be repaired at next drydock.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 September 2018
Resolved
Submit repair proposal and repair lazarette STBD exhaust penetration wood rot prior to next drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 31 October 2018
Resolution: To be repaired at next drydock.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 August 2018
Resolved
Submit repair proposal and repair STBD engine bed wood rot.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2018
Resolved 13 September 2018
Resolution: Issued CG835 deficiency during COI, see activity 6537919 for details.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 August 2018
Resolved
Submit proposal and repair fore peak PORT ovhd wood rot.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2018
Resolved 13 September 2018
Resolution: Issued CG835 deficiency during COI, see activity 6537919 for details.
Engineering › Fuel Oil Service System › Hose
Issued 12 December 2017
Resolved
Repair port main engine fuel return line leak.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2017
Resolution: Fuel line was recut and reclamped. Cleared.
Engineering › Lubricating Oil Service System › Gauge
Issued 12 December 2017
Resolved
Repair port side engine oil pressure gauge.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2017
Resolution: Cleared.
Engineering › Bilge Water Management System › Not Operational
Issued 12 December 2017
Resolved
Repair tank space bilge light and audible alarm at operating station.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2017
Resolution: All SAT. Cleared.
Engineering › Bilge Water Management System › Interface Detector
Issued 12 December 2017
Resolved
Repair engine room bilge alarm light at operating station.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 29 December 2017
Resolution: Cleared
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Turbocharger
Issued 12 December 2017
Resolved
Repair starboard engine turbo oil return leak.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 December 2017
Resolved 15 December 2017
Resolution: Cleared.
Lifesaving › Lifefloat › Retroreflective Material
Issued 12 December 2017
Resolved
Add proper amount of Type II retro-reflective take on all lifefloats.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2017
Resolution: Cleared.
Engineering › Fuel Oil Service System › Piping
Issued 14 December 2016
Resolved
Prove proper operation of starboard engine to attending MI's. 46 CFR 182.200
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 December 2016
Resolved 16 December 2016
Resolution: Conducted satisfactory sea trials for 30 minutes at various speeds.
Lifesaving › Lifefloat › Float Free
Issued 2 December 2016
Resolved
Reroute shrouds to mast to ensure all 03 life floats float free.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 January 2017
Resolved 16 December 2016
Resolution: Vessel owner rerouted the shrouds as discussed to ensure a float free arrangement.
Engineering › Sea-water System (primary cooling) › Piping
Issued 2 December 2016
Resolved
Replace exhaust cooling water pipe on port engine (02) temp. patches.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 January 2017
Resolved 13 January 2017
Resolution: A new in kind pipe was installed.
Engineering › Engine Controls (Electric/Electronic) › Linkage
Issued 2 December 2016
Resolved
Renew worn engine shutdown solenoid components on both engines.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 January 2017
Resolved 13 January 2017
Resolution: New fittings were installed as required.
Engineering › Fuel Oil Service System › Piping
Issued 30 August 2016
Resolved
Remove all flexible nonmetallic fuel hose that is not USCG approved from MDE's and replace as original.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 6 September 2016
Resolved 22 September 2016
Resolution: Replaced flexible nonmetallic fuel hose with copper pipe from the tank to the BLKD and CG approved nonmetallic fuel hose from the RACOR filters to the M/E.
Construction/Loadline › Structures › Ventilators
Issued 4 March 2016
Resolved
Vessel has made unauthorized alterations to the deck, added gooseneck ventilation valves to the forepeak space.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 March 2016
Resolved 9 March 2016
Resolution: Repair proposal approved. Vents installed and inspected by attending MI.