Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it40014 - Convention (Subpart B), Gross Ton 25301 - Convention (Subpart B), Net Ton 76635 - Dead Weight, Metric Ton 87411 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
A report is not offered for this hull. Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.
Inspection history · 4
23 May 2026PSC B
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8368196
3 April 2023PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7656764
24 August 2016Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5982212
19 August 2016Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5968266
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 19 August 2016Resolved
9900 - Other (not clearly hazardous) - Each loading arm and transfer pipe system, including metallic hose, must not leak under static liquid pressure at least 1.5 times the MAWP annually. PSCO observed thath the ship's crew had used air to pressure test the bunker lines. Prior to bunkering in US conduct hydrostatic test. 33 CFR 156.170 40c
Condition: Invalid
Action required: 703 - Prior to bunkering operations
Resolved 24 August 2016
Resolution: PSC NOLA received a documentation from the master of the vessel satisfying the requirement.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.